journal article·2024-07-04Open access

Railway Track Tamping Maintenance Cycle Prediction Model Based on Power-Time-Transformed Wiener Process

Ru An, Lei Jia, Yuanjie Tang, Yuan Tian, Zhipeng Wang

Applied Sciences· Volume 14· Issue 13

Abstract

Predicting the tamping cycles of railway track sections based on track geometry deterioration rules is necessary to reasonably allocate the limited tamping maintenance resources. Existing research on track geometry deterioration modeling for tamping cycle prediction lacks simultaneous consideration of the deterioration characteristics including heterogeneity, uncertainty, and historical dependence, thereby limiting the accuracy of the prediction results. Thus, this study considers a 200 m track segment as the basic object and uses the power-time-transformed Wiener process to develop a deterioration prediction model for the longitudinal level of a segment between two adjacent tamping operations. Moreover, it individually estimates the model parameters for each track segment to predict the tamping maintenance cycle for each segment combined with the tamping maintenance threshold of the longitudinal level index. Finally, through a case study of the Chinese Lanxin Railway line, the effectiveness of the proposed model and different parameter estimation methods is assessed.
Source: crossref · Quality: baseline

Research context

OpenAlex topics: Railway Engineering and Dynamics · Reliability and Maintenance Optimization · Transport and Economic Policies

SciVX discovery tags are terminology-based. OpenAlex topics are source-provided classifications.

Affiliations

College of Civil and Transportation Engineering, Shenzhen University, Shenzhen 518060, China

Shenzhen Urban Transport Planning Center Co., Ltd., Shenzhen 518057, China

Key Laboratory of Transport Industry of Big Data Application Technologies for Comprehensive Transport, Beijing Jiaotong University, Beijing 100044, China

School of Traffic and Transportation, Beijing Jiaotong University, Beijing 100044, China

Line Branch Company Affiliated with Beijing Mass Transit Railway Operation Co., Ltd., Beijing 100082, China

Funding

National Key R&D Program of China · National Natural Science Foundation of China · Guangdong Provincial Key Laboratory of Urban Traffic Digital Twin

References (44)

Show source-provided references
1. Optimization of preventive condition-based tamping for railway tracks10.1016/j.ejor.2016.01.024 ↗
2. A modelling approach to railway track asset management10.1177/0954409712452235 ↗
3. Han, J. (2021). China Railway Yearbook, China Railway Publishing House Co., Ltd.
4. Multi-level condition-based maintenance planning for railway infrastructures—A scenario-based chance-constrained approach10.1016/j.trc.2017.08.018 ↗
5. Predictive Maintenance Model for Ballast Tamping10.1061/(ASCE)TE.1943-5436.0000825 ↗
6. Soleimanmeigouni, I., Ahmadi, A., and Kumar, U. (2018). Track Geometry Degradation and Maintenance Modelling: A Review, SAGE Publications.
7. Prediction of track geometry degradation using artificial neural network: A case study10.1080/23248378.2021.1875065 ↗
8. Liao, Y., Han, L., Wang, H., and Zhang, H. (2022). Prediction Models for Railway Track Geometry Degradation Using Machine Learning Methods: A Review. Sensors, 22.10.3390/s22197275 ↗
9. Life cycle cost assessment of bitumen stabilised ballast: A novel maintenance strategy for railway track-bed10.1016/j.conbuildmat.2018.04.020 ↗
10. Integer Programming to Optimize Tamping in Railway Tracks as Preventive Maintenance10.1061/(ASCE)TE.1943-5436.0000296 ↗
11. Availability Approach to Optimizing Railway Track Renewal Operations10.1061/(ASCE)TE.1943-5436.0000575 ↗
12. Hierarchical Bayesian modelling of rail track geometry degradation10.1177/0954409713486619 ↗
13. Bayesian Monte Carlo approach for developing stochastic railway track degradation model using expert-based priors10.1080/15732479.2020.1836001 ↗
14. Modelling the evolution of ballasted railway track geometry by a two-level piecewise model10.1080/15732479.2017.1326946 ↗
15. Augmented utilisation of possession time: Analysis for track geometry maintenance10.1177/0954409715583890 ↗
16. Evaluating Deterioration of Tunnels Using Computational Machine Learning Algorithms10.1061/(ASCE)CO.1943-7862.0002162 ↗
17. Prediction of railway track geometry deterioration using artificial neural networks: A case study for Turkish state railways10.1080/15732479.2012.757791 ↗
18. Principal components analysis and track quality index: A machine learning approach10.1016/j.trc.2018.04.001 ↗
19. Tamping and Renewal Optimization of Ballasted Track Using Track Measurement Data and Genetic Algorithm10.1061/JTEPBS.0000120 ↗
20. Data-driven methods to predict track degradation: A case study10.1016/j.conbuildmat.2022.128166 ↗
21. Probabilistic Machine-Learning Methods for Performance Prediction of Structure and Infrastructures through Natural Gradient Boosting10.1061/(ASCE)ST.1943-541X.0003401 ↗
22. Surface settlement prediction for urban tunneling using machine learning algorithms with Bayesian optimization10.1016/j.autcon.2022.104331 ↗
23. Stochastic Prediction of Road Network Degradation Based on Field Monitoring Data10.1061/JCEMD4.COENG-13293 ↗
24. Markov-based model for the prediction of railway track irregularities10.1177/0954409713503460 ↗
25. Investigating railway track asset management using a Markov analysis10.1177/0954409713511965 ↗
26. An adaptive opportunistic maintenance model based on railway track condition prediction10.1016/j.ifacol.2016.11.021 ↗
27. A threshold-regression model for track geometry degradation10.1177/0954409718777834 ↗
28. Stochastic modelling and analysis of degradation for highly reliable products10.1002/asmb.2063 ↗
29. Optimal Design for Destructive Degradation Tests With Random Initial Degradation Values Using the Wiener Process10.1109/TR.2016.2575442 ↗
30. Prediction of Track Deterioration Using Maintenance Data and Machine Learning Schemes10.1061/JTEPBS.0000173 ↗
31. Optimal opportunistic tamping scheduling for railway track geometry10.1080/15732479.2020.1809467 ↗
32. Exploring Different Alert Limit Strategies in the Maintenance of Railway Track Geometry10.1061/(ASCE)TE.1943-5436.0000867 ↗
33. Qu, J., Liu, P., Long, Y., and Xu, F. (2023). Main Factors on Effect of Precise Measurement and Precise Tamping Based on BP Neural Network. Appl. Sci., 13.10.3390/app13074273 ↗
34. Evaluation of track geometry maintenance for a heavy haul railroad in Sweden: A case study10.1177/0954409713482239 ↗
35. Offenbacher, S., Koczwara, C., Landgraf, M., and Marschnig, S. (2023). A Methodology Linking Tamping Processes and Railway Track Behaviour. Appl. Sci., 13.10.3390/app13042137 ↗
36. China State Railway Group Co., Ltd. (2019). General Speed Railway Line Maintenance Rules (TG/GW102—2019), China Railway Publishing House Co., Ltd.
37. The effects of tamping on railway track geometry degradation10.1177/0954409713480439 ↗
38. An efficient method for generalised Wiener series estimation of nonlinear systems using Gaussian processes10.1016/j.ymssp.2023.111095 ↗
39. Remaining useful life prediction of equipment considering dynamic thresholds under the influence of maintenance
40. Remaining useful life evaluation for accelerated Wiener degradation process model with mixed random effects and measurement errors10.1002/qre.3296 ↗
41. A nonlinear-drift-driven Wiener process model for remaining useful life estimation considering three sources of variability10.1016/j.ress.2021.107631 ↗
42. Approximate Bayesian computation for railway track geometry parameter estimation10.1177/0954409720977726 ↗
43. Marine Predators Algorithm: A nature-inspired metaheuristic10.1016/j.eswa.2020.113377 ↗
44. A survey of Monte Carlo methods for parameter estimation10.1186/s13634-020-00675-6 ↗