The Development of the Pipe Jacking Guidance Technology
Source abstract
Abstract
Pipe jacking is one of the most important construction methods in trenchless technology. Pipe jacking guidance technology acquires the jacking route by collecting the attitude and position information of the pipe jacking machine. It ensures that the deviation between the jacking route and the route designed in the engineering drawings during the construction is kept within the error range and prevents the damage to other facilities caused by the deviation of the construction route. It improves the construction efficiency and ensures the precision and safety of pipeline laying. In this paper, the basic principle and working mode of the pipe jacking guidance system are sorted out, and the current technical means are classified and organized. A systematic overview of the research on pipe jacking guidance methods is given, the development trend of pipe jacking guidance systems towards automation, intelligence and multi-source data fusion are discussed, and the challenges faced by pipe jacking guidance systems in complex scenarios are elaborated. This is to provide guidance and reference for the research and practice in related fields and to promote the further innovation and application of pipe jacking guidance technology.
Source: crossref · Quality: baseline
Research context
OpenAlex topics: Geotechnical Engineering and Underground Structures · Underground infrastructure and sustainability · Engineering Applied Research
SciVX discovery tags are terminology-based. OpenAlex topics are source-provided classifications.
Affiliations
School of Engineering and Technology, China University of Geosciences, Beijing 100083, China
Funding
National Natural Science Foundation of China · Major national science and technology project
References (39)
Show source-provided references
1. Discussion on the Application of Pipe Jacking Construction Technology in Municipal Road Drainage Projects10.26689/jard.v7i6.5517 ↗
2. Major Pipe Jacking for Perth Desalination and Main Sewer Projects
3. Application Strategies of Pipe Jacking Technology in Municipal Rainwater Pipeline Engineering10.26689/jard.v8i6.8963 ↗
4. Kong, C., Guan, G., Gu, S., Zhou, Z., and Wang, H. (2023). Frictional resistance calculation and jacking force prediction of rectangular pipe jacking. Sci. Rep., 13.10.1038/s41598-023-42189-9 ↗
5. Developments and research directions in pipe jacking and microtunneling10.1016/j.undsp.2018.09.001 ↗
6. Long-distance Pipe Jacking Technology in Municipal Water Supply and Drainage Engineering Construction10.1051/e3sconf/202016504021 ↗
7. Challenges in a Long-Distance Pipe Jacking and Solutions in China
8. Guiding Survey Technology for Long Curved Pipe Jacking
9. Horizontal angle measurement of automatic navigation system of pipe jacking machine10.3788/GXJS20154103.0238 ↗
10. Calibration method and accuracy evaluation of visual target with double screen for straight pipe jacking machine
11. A low-cost and real-time pose measurement method for straight pipe jacking machine based on dual-screen laser target in tunneling guidance10.1016/j.measurement.2022.111110 ↗
12. A Real-Time Autonomous Calibration Method for an Attitude Laser Measurement System for the Roadheader10.1007/s13369-022-06671-2 ↗
13. On the measurement and the method of computation of the posture parameters of shields
14. Application of Kalman Filtering in Measurement of Shield Posture
15. TBM Pose Measurement Method Based on Kalman′s Prediction of Multi-Prism Coordinates
16. Virtual Laser Target Board for Alignment Control and Machine Guidance in Tunnel-Boring Operations10.1007/s10846-014-0113-y ↗
17. Data Processing and Accuracy Analysis in Shield Posture Measurement
18. A Rigorous Calculating Model of Inclinometer-Data Fusion in Tunnel-Boring-Machine Attitude
19. Shield attitude calculation method based on importing equivalent observations of tilt-angle
20. Xu, H., Wang, L., Zu, Y., Gou, W., and Hu, Y. (2023). Application and Development of Fiber Optic Gyroscope Inertial Navigation System in Underground Space. Sensors, 23.10.3390/s23125627 ↗
21. Localization of underground pipe jacking machinery: A reliable, real-time and robust INS/OD solution10.1016/j.conengprac.2023.105711 ↗
22. Zu, Y., Wang, L., Hu, Y., and Yang, G. (2024). CEEMDAN-LWT De-Noising Method for Pipe-Jacking Inertial Guidance System Based on Fiber Optic Gyroscope. Sensors, 24.10.3390/s24041097 ↗
23. Mustață, M.Ș., and Grigorie, T.L. (2024). A Low-Cost Redundant Attitude System for Small Satellites, Based on Strap-Down Inertial Techniques and Gyro Sensors Linear Clustering. Appl. Sci., 14.10.3390/app14156585 ↗
24. Lu, Y., Wang, W., Liu, Y., and Guo, Z. (2023). An Improved Rotational Modulation Scheme for Tri-Axis Rotational Inertial Navigation System (RINS) with Fiber Optic Gyro (FOG). Appl. Sci., 13.10.3390/app13148394 ↗
25. Automatic guidance method based on FOG/ODO/SLL integrated navigation system for pipe jacking10.1016/j.tust.2024.105717 ↗
26. Zhang, W., Wang, L., and Zu, Y. (2024). The Zero-Velocity Correction Method for Pipe Jacking Automatic Guidance System Based on Fiber Optic Gyroscope. Sensors, 24.10.3390/s24185911 ↗
27. Automatic Guidance System for Long-Distance Curved Pipe-Jacking10.1007/s12205-020-1489-9 ↗
28. Application of RMS-TV automatic tracking measurement system in underground long-distance pipe jacking
29. Development and application of automatic pipe jacking guidance system for S-curve pipe jacking in Fuzhou
30. Development and Application of Single-station Long-distance Pipe Jacking Guidance System by Track Correction
31. Application of automatic measurement system for pipe jacking used in curve designed axis tunnel
32. Deformation analysis of pipe-jacking process for a large-section shallow-covered project crossing highway10.1088/1755-1315/861/5/052109 ↗
33. The influence of shallow buried double-line parallel rectangular pipe jacking construction on ground settlement deformation10.1016/j.aej.2020.11.038 ↗
34. Study on the Effect of Parallel Pipe Jacking Spacing on Surface Subsidence Deformation in the Pre-Construction Method of Tube Curtain10.1088/1757-899X/782/4/042021 ↗
35. A Study on Surface Settlement Prediction Method of Trenchless Technology Pipe Jacking Method10.14481/jkges.2015.16.11.29 ↗
36. Deng, M., Ding, F., Liu, Y., Huang, X., He, Y., and Zhao, J. (2023). Surface settlement law of double-hole pipe-jacking tunnel undercrossing expressway. Sci. Rep., 13.10.1038/s41598-023-46364-w ↗
37. Analysis and prediction of small-diameter TBM performance in hard rock conditions10.1016/j.tust.2023.105442 ↗
38. Long-Distance Pipe Jacking in Complex Urban Geological Environment10.26689/jard.v6i1.2888 ↗
39. Jia, X., Jiao, Z., Liu, S., Zhang, H., and Shang, B. (2022). Simulation analysis of the effect of single-chamber double-line pipe jacking through different soil materials on surface uplift and subsidence. PLoS ONE, 17.10.1371/journal.pone.0276366 ↗