Numerical Stability Analysis of Large Section Tunnels Using the Double-Side Heading Method: A Case Study of Xiamen Haicang Evacuate-Channel

Jianxiu Wang, Ansheng Cao, Zhao Wu, Lihua Lin, Zonghai Li, Xiaotian Liu, Huboqiang Li, Yanxia Long, Yuanwei Sun

Applied Sciences· Volume 13· Issue 1

Abstract

Large section tunnels have huge excavation spans, complex excavation procedures, mutual influence among various procedures, multiple disturbances of the surrounding rock, and discontinuous connection among linings under different procedures, which bring great difficulties to their construction. The Caijianwei Mountain No. 2 tunnel of the Xiamen Haicang Evacuate-channel project in China belongs to a super large section tunnel. The tunnel’s maximum excavation section span reaches 30.52 m, and the excavation area reaches 421.73 m2. Its excavation sequence, the timing of the second primary lining support, temporary support disassembly, and secondary lining support of the double-side heading method were analyzed using numerical methods. The excavation sequence of the double side-heading method from the right pilot tunnel to the left pilot tunnel and then to the middle pilot tunnel can avoid a large horizontal displacement at the arch waist and control the deformation of the lining. The excavation sequence from the middle pilot tunnel to the two side pilot tunnels was conducive to the bearing performance of the concrete at the arch crown. The excavation sequence from the two side pilot tunnels to the middle pilot tunnel can better protect the concrete safety at the arch waist. The timing of the second primary lining support, temporary support removal, and secondary lining support have different effects on the deformation and stress of the surrounding rock and support structures. In the construction process, the timing of the second primary lining support, temporary support disassembly, and secondary lining support should be determined according to the actual deformation and stress of the site section. The research results can provide a reference for the construction design of the double-side heading method for large section tunnels.
Source: crossref · Quality: baseline

Research context

OpenAlex topics: Geotechnical Engineering and Analysis · Geotechnical Engineering and Underground Structures · Grouting, Rheology, and Soil Mechanics

SciVX discovery tags are terminology-based. OpenAlex topics are source-provided classifications.

Affiliations

College of Civil Engineering, Tongji University, Shanghai 200092, China

Key Laboratory of Geotechnical and Underground Engineering of Ministry of Education, Tongji University, Shanghai 200092, China

Xiamen Road and Bridge Construction Group Company Ltd., Xiamen 361026, China

Funding

Shanghai Municipal Science and Technology Project · Xiamen Road and Bridge Group · project of Key Laboratory of Impact and Safety Engineering (Ningbo University), Ministry of Education · Shanghai Municipal Science and Technology Major Project · Fundamental Research Funds for the Central Universities · Key Laboratory of Land Subsidence Monitoring and Prevention, Ministry of Natural Resources of the People’s Republic of China · Suzhou Rail Transit Line 1 Co., Ltd. · China Railway 15 Bureau Group Co., Ltd.

References (35)

Show source-provided references
1. Study on mechanism of macro failure and micro fracture of local nearly horizontal stratum in super-large section and deep buried tunnel10.12989/gae.2016.11.2.253 ↗
2. Instability mechanism of surrounding rock for super-large cross section at high-speed railway tunnel portal
3. Reasonable distance for super-large section neighborhood tunnel of granite residual soil with shallow-buried bias
4. Model test on mechanical characteristics of surrounding rock during construction process of super-large section tunnel in complex strata
5. Analysis of time-space effect for surrounding rock deformation in super-largecross section slate tunnel during construction period
6. Spatial deformation mechanism and load release evolution law of surrounding rock during construction of super-large section tunnel with soft broken surrounding rock masses
7. Ground settlement of new artificial filling soil layer induced by constructing tunnel with super large cross-section and its control measures
8. Model test on segmental lining of Nanjing Yangtze river tunnel with super-large cross-section
9. Study of the construction techniques for a four-arch tunnel with a super-large section
10. Discontinuous deformation of surrounding rock for small-space tunnel with super-large section in jointed rock mass
11. Design of the Gongbei tunnel using a very large cross-section pipe-roof and soil freezing method10.1016/j.tust.2017.11.012 ↗
12. Numerical Simulation Analysis and Engineering Applications on the Double-Side-Wall Heading Step Bench Excavation of Large-Cross Section and Shallow Tunnel
13. Optimization of sequential excavation method for large-section urban subway tunnel: A case study10.1177/1687814020957185 ↗
14. Calculation of surrounding rock pressure of large section underground excavation metro station based on the construction process10.1088/1755-1315/626/1/012009 ↗
15. The study on a new loads calculation method of multi-arch and extra large cross section tunnels
16. Large rectangular cross-section tunneling by the multi-micro shield tunneling (MMST) method10.1016/j.tust.2003.11.012 ↗
17. Construction mechanical mechanism of shallow subway tunnel group with large-span variable cross section10.1007/s10706-018-0579-7 ↗
18. The monitoring and analysis of surface subsidence of soft soil rock large section of subway tunnel shield construction10.4028/www.scientific.net/AMR.848.78 ↗
19. Research on crossing tunnels’ seismic response characteristics10.1007/s12205-019-0458-7 ↗
20. Zhou, D.H., Cao, L.Q., Ma, Y.F., and Shi, Z. (2010). Influence analysis of core rock construction in super large section and span tunnel. Modelling and Computation in Engineering, CRC Press.10.1201/b10025-2 ↗
21. In-situ test and 3D-effect analysis of a tunnel lining structure of large cross section
22. Analysis on seismic response of a super-large section tunnel in highway
23. Design of Secondary High-Capacity Support to Large-Section Tunnel with Fractured Surrounding Rock Excavated on High-Stress Condition
24. Research on construction time of secondary lining of large section loess tunnel for high-speed railway
25. Analysis on construction stability of large section tunnel of harbin city metro
26. Numerical analysis of construction method in shallow-buried large-section loess tunnel10.4028/www.scientific.net/AMM.580-583.997 ↗
27. In-situ testing study on lining system of double-arched tunnel
28. Stability Analysis on Large Section Tunnel with Double-Side-Drift Method
29. Analysis of construction parameter optimization for new large cross-section tunnel next to existing tunnels
30. Study on optimization of core pillar in large-span tunnel excavated with double-side heading method
31. Stability analysis of excavation of intermediate diaphragm wall in large cross-section metro station constructed by double-side-drift method and its key technologies
32. Industrial Standard of the People′s Republic of China (2018). Specifications for Design of Highway Tunnels Section 1 Civil Engineering: JTG 3370. 1-2018, China Communications Press.
33. Numerical evaluation of new Austrian tunneling method excavation sequences: A case study10.1016/j.ijmst.2020.03.009 ↗
34. Study on mechanical rules of double-lining in creeping surrounding rock
35. Statistical Analysis of the Contact Pressure between the Primary Support and the Secondary Lining of Tunnel