Settlement and Stress Characteristics of the Ground in the Project of a Double-Line Tunnel Undercrossing an Airport Runway in a Sandy Cobble Region

Xuwei Zhao, Jia Li, Wei Liu, Wenge Qiu

Applied Sciences· Volume 12· Issue 23

Abstract

The engineering technology of undercrossing an airport flight area is relatively mature; however, the use of shield tunnels crossing the operating airport flight area in high liquidity sandy cobble stratum has rarely been reported. To discuss the feasibility of a double-line shield tunnel undercrossing the airport flight area in a sandy cobble region. Based on the case of the Chengdu Metro Line 10 that undercrosses the Shuang-Liu Airport, which is located in sandy cobble region, the deformation and stress laws of airport runway pavement structures were investigated via a three-dimensional numerical model. Stratum displacement, ground settlement and pavement tensile stress under different tunnel depths were analysed. Then, the pavement tensile stress was taken as the safety evaluation index and the vulnerable area of the pavement structure was proposed. The results show that after excavation of the double-line tunnel, the maximum ground surface settlement occurred above the tunnel centreline and the ground settlement curves presented a V-type settlement trough instead of a W-type. The existence of a runway greatly limited the deformation of the surrounding soil; with increasing depth, the effect degree of the runway pavement on the soil settlement decreased. The most unfavourable region of the runway pavement structure under the influence of tunnel excavation was found. With increasing burial depth, the maximum settlement of the surface centre point decreased continuously. It is recommended that the tunnel burial depth not exceed 23.5 m in this project. According to the displacement and stress control limitation of the airport pavement, it can be judged that the shield construction method meets the structural stability requirements of the pavement. The calculated results provide a reference for the shield tunnel construction in the same geological condition areas.
Source: crossref · Quality: baseline

Research context

OpenAlex topics: Geotechnical Engineering and Analysis · Geotechnical Engineering and Underground Structures · Geotechnical Engineering and Soil Stabilization

SciVX discovery tags are terminology-based. OpenAlex topics are source-provided classifications.

Affiliations

Key Laboratory of Transportation Tunnel Engineering, Southwest Jiaotong University, Chengdu 610000, China

Key Laboratory of Road and Traffic Engineering of the Ministry of Education, Tongji University, Shanghai 200032, China

Shanghai Key Laboratory of Rail Infrastructure Durability and System Safety, Shanghai 200032, China

References (37)

Show source-provided references
1. Zhang, H. (2011). Behavior of Pavement and Soil Deformation during Shield Construction. [Thesis, Tongji University]. (In Chinese).
2. Shield construction control based on structural integrity of airport runway pavement
3. Peck, R.B. (, 1969). Deep Excavation and Tunneling in Soft Ground. Proceedings of the 7th International Conference on Soil Mechanics and Foundation Engineering, Sociedad Mexicana de Mecanica de Suelos, Mexico City, Mexico.
4. Errors in ground distortions due to settlement trough adjustment10.1016/S0886-7798(99)00054-1 ↗
5. Prediction methods on tunnel-excavation induced surface settlement around adjacent building10.12989/gae.2017.12.2.185 ↗
6. Describing settlement troughs over twin tunnels using a superposition technique10.1061/(ASCE)1090-0241(2007)133:4(445) ↗
7. The prediction of volume loss due to tunnelling in overconsolidated clay based on heading geometry and stability number
8. Subsurface Settlement Profiles Above Tunnels in Clays10.1680/geot.1993.43.2.315 ↗
9. Analysis of Undrained Soil Deformation Due to Ground Loss10.1680/geot.1987.37.3.301 ↗
10. A Complex Variable Solution for A Deforming Circular Tunnel in an Elastic Half-Plane10.1002/(SICI)1096-9853(199702)21:2<77::AID-NAG857>3.0.CO;2-M ↗
11. Deformations of an elastic half plane with a circular cavity10.1016/S0020-7683(97)00194-7 ↗
12. Time-dependent analysis of stress components around lined tunnels with circular configuration considering tunnel advancing rate effects10.1016/j.ijrmms.2020.104422 ↗
13. Ground Movements due to Shallow Tunnels in Soft Ground. I: Analytical Solutions10.1061/(ASCE)GT.1943-5606.0000948 ↗
14. Improved analytical prediction of ground frost heave during tunnel construction using artificial ground freezing technique10.1016/j.tust.2019.103050 ↗
15. Xu, Q., Zhu, Y., Lei, S., Liu, Y., Zhao, W., Fang, Z., Wang, C., and Xu, S. (2022). An improved stochastic medium theoretical model for predicting the deformation of existing tunnels and strata caused by the excavation of new tunnels undercrossing existing tunnels. Chin. J. Geotech. Eng., 1–9.
16. An analysis of the ground deformation caused by shield tunnel construction combining an elastic half-space model and stochastic medium theory10.1007/s12205-016-0804-y ↗
17. A prediction model based on stochastic medium theory for ground surface settlement induced by non-uniform tunnel deformation
18. Surface settlements due to defonmation of a tunnel in an elastic half plane10.1680/geot.1996.46.4.753 ↗
19. Similarity Solution for the Synchronous Grouting of Shield Tunnel Under the Vertical Non-Axisymmetric Displacement Boundary Condition10.4208/aamm.2016.m1479 ↗
20. An elasto-plastic solution of pile deflection and pile load capacity due to adjacent tunneling
21. Plasticity solutions for soil behaviour around contracting cavities and tunnels10.1002/(SICI)1096-9853(199910)23:12<1245::AID-NAG30>3.0.CO;2-W ↗
22. A preliminary study for numerical and analytical evaluation of surface settlement due to EPB shield TBM excavation
23. Prediction of transverse settlement trough considering the combined effects of excavation and groundwater depression
24. Effect of the excavation clearance of an under-crossing shield tunnel on existing shield tunnels10.1016/j.tust.2018.04.034 ↗
25. Differential settlement and soil dynamic stress of a culvert-embankment transition zone due to an adjacent shield tunnel construction10.1007/s12205-017-1592-8 ↗
26. Dynamic response of a lined tunnel with transmitting boundaries10.12989/eas.2015.8.1.275 ↗
27. Prediction of settlement trough induced by tunneling in cohesive ground10.1007/s11440-012-0169-4 ↗
28. Boundary Element Analysis of a Lined Tunnel Problem
29. Settlement Trough Due to Tunneling in Cohesive Ground
30. Analysis of interaction between tunnels in soft ground by 3D numerical modeling10.1007/s10064-010-0333-8 ↗
31. Development of a 3D finite element model for shield EPB tunnelling10.1016/j.tust.2017.02.001 ↗
32. Research on control criteria of shield tunnel crown settlement based on safety of overlying airport runway
33. Real-time prediction of shield moving trajectory during tunnelling10.1007/s11440-022-01461-4 ↗
34. Environmental Effect and Control of Large Diameter EPB Shield Tunneling below an Operating Airport10.1061/(ASCE)AS.1943-5525.0000446 ↗
35. Construction Control of Large Diameter Slurry Shield Undercrossing Airport
36. Settlement of runway subgrade under moving aircraft loads
37. (2006). Specification for Design of Highway Asphalt Pavement(JTGD50-2006).