Show source-provided references
3. (2025, March 10). Underground Construction Equipment Market to Reach $31.3 Billion, Globally, by 2031 at 4.7% CAGR: Allied Market Research. Available online: https://www.prnewswire.com/news-releases/underground-construction-equipment-market-to-reach-31-3-billion-globally-by-2031-at-4-7-cagr-allied-market-research-301794240.html.
4. Puhakka, T. (1997). Underground Drilling and Loading Handbook, Tamrock; Tamrock.
6. Vincenza, F., Enrico, F., Giordano, R., and Astore, G. (2012, January 24–26). Three case-histories deal with design and construction of large shafts. Proceedings of the 3rd International Conference on Shaft Design and Construction, London, UK.
8. Design of Inclined Shafts and Vertical Shafts of Super long Highway Tunnels
9. Ong, D.E.L., Barla, M., Cheng, J.W.C., Choo, C.S., Sun, M., and Peerun, M.I. (2022). Deep Shaft Excavation: Design, Construction, and Their Challenges, in Sustainable Pipe Jacking Technology In The Urban Environment: Recent Advances and Innovations, Springer.
10.1007/978-981-16-9372-4 ↗10. Wharmby, N., Perry, B., and Waikato, H. (2010, January 7–9). Development of Secant Pile Retaining Wall Construction in Urban New Zealand. Proceedings of the New Zealand Concrete Industry Conference, Wellington, New Zealand.
11. Schmaeh, P. (2015). Installation of Shore Approaches and Sea-Lines Using Trenchless Methods: Technologies and Case Studies. Recent Progress in Desalination, Environmental and Marine Outfall Systems, Springer.
10.1007/978-3-319-19123-2_6 ↗15. Optimization of mucking and hoisting operation in conventional shaft sinking
16. Zhao, D., Tu, H., He, Q., and Li, H. (2023). Research on the Design and Construction of Inclined Shafts for Long Mountain Tunnels: A Review. Sustainability, 15.
10.3390/su15139963 ↗17. Present situation and problems of inclined shaft construction in China
18. Process for improving open caisson, SS caisson process; Open keson no kairyo kohoSS keson koho
19. Tanimura, D., Ueda, J., and Tani, Y. (2025, March 10). Large-scale vertical shaft excavation using super-open caisson system. Construction of Tamasato vertical shaft (Ishioka vertical shaft No.5); Jidoka open caisson koho ni yoru daikibo tatekui no kussaku. Tamasato tateko (Ishioka dai5 tateko) shinsetsu koji, Available online: https://www.osti.gov/etdeweb/biblio/309449.
20. Investigation on the stratigraphic response and plugging effect induced by press-in open caisson in mucky soil
10.1007/s12205-023-0294-7 ↗21. Study on the characteristics of friction resistance and the mechanism of sudden sinking in the middle and late sinking stages of super large caisson foundation
22. Zhang, F. (2009). Design, Construction and Cases of Open Caisson and Pneumatic Caisson, China Architecture & Building Press.
23. Tani, Y., Nakano, M., Okoshi, M., Maeda, S., and Isa, H. (1996, January 11–13). Research and Development of Automatic System for Open Caisson Method. Proceedings of the 13th International Symposium on Automation and Robotics in Construction, Tokyo, Japan.
10.22260/ISARC1996/0040 ↗24. Study on assembling technique of main machine for mine shaft boring machine
25. Discussion on Prefabricated Support Scheme of Subway Construction Shaft
26. (2025, March 10). Herrenknecht. Vertical Shaft Sinking Machine. Available online: https://www.herrenknecht.com/en/products/productdetail/vertical-shaft-sinking-machine-vsm/.
27. Frey, S., and Schmaeh, P. (2019). The role of mechanized shaft sinking in international tunnelling projects. Tunnels and Underground Cities. Engineering and Innovation Meet Archaeology, Architecture and Art, CRC Press.
10.1201/9780429424441-224 ↗28. Rahimi, M., Rajmohan, A., Spasojevic, A., Scheele, J., Cabot, E., Ho, K.S., and Ball, S. (2022, January 2–5). Geotechnical Considerations of Deep Mine Shaft, Sinking by Combined VSM and Drill & Blast Construction Methodology. Proceedings of the GeoCalgary 2022, Calgary, AB, Canada.
29. Zhou, J., Liu, C., Xu, J., Zhang, Z., and Li, Z. (2023). Deformation Mechanism and Control of In-Situ Assembling Caisson Technology in Soft Soil Area under Field Measurement and Numerical Simulation. Materials, 16.
10.3390/ma16031125 ↗30. Yi, K., Tong, S., and Chen, Y. (2022, January 2–8). The first circular shaft in asia with the use of vertical shaft sinking machine. Proceedings of the World Tunnel Congress 2022, Copenhagen, Denmark.
31. Shaft boring systems for mechanical excavation of deep shafts
32. 3D analysis on surrounding soil stability of shaft boring machine based on plastic limit equilibrium theory
10.1007/s12205-021-0458-2 ↗33. Development path and key technology analysis of shaft and tunnel construction in deep stratum with high temperature
34. An analytical model to predict the radial deformation of surrounding rock during shaft construction via shaft boring Machine
10.1016/j.tust.2023.105321 ↗35. Mechanized shaft sinking system
36. Goodell, T.M. (1991). Shaft boring machine: A method of mechanized vertical shaft excavation. High Level Radioactive Waste Management, American Society of Civil Engineers.
39. Development and prospect of mechanical shaft boring technology
41. Ferreira, P.H. (2005, January 26–29). Mechanised mine development utilising rock cutting and boring through raise and blind boring techniques. Proceedings of the 3rd Southern African Conference on Base Metals, Kitwe, Zambia.
43. Challenges of shaft drilling in broken rock masses with a large raise boring machine in confined underground space: A case study
10.1016/j.tust.2024.105694 ↗44. Oosthuizen, M. (2004). Large Diameter Vertical Raise Drilling and Shaft Boring Techniques as an alternative to Conventional Shaft Sinking Techniques. SANIRE 2004—The Miner’s Guide through the Earth’s Crust, South African National Institute of Rock Engineering.
45. Projektowanie frezujących organów ślimakowych dla zwiększenia wychodu grubych sortymentów węgla
46. Vertical Shaft Construction at the Pump Storage Plant Vianden/Luxembourg
47. Liu, Z. (2012). Drilling technology and Development of LM series raise boring machine. Rock Mechanics: Achievements and Ambitions, CRC Press.
10.1201/b11438-131 ↗48. Martin, D.G., Hunt, R., and Jones, A.P. (2012, January 24–26). New opportunities for mine planners–large diameter borehole hoisting systems. Proceedings of the Third International Conference on Shaft Design and Construction, London, UK.
49. Development of BMC200 raise-boring machine
50. Research on ZFY5. 0/600 mode large diameter raise boring machine
51. The Future is Boring
52. Evans, V., and Graham, C. (2025, March 10). Shaft Sinking from 2007 to 2020: Mechanical Excavation. Evolution of Shaft Sinking Systems in the Western World and the Improvement in Sinking Rates (Part Seven). Available online: https://magazine.cim.org/en/the-evolution-of-shaft-sinking/evolution-of-shaft-sinking-part-seven-en/.
53. Slater, D. (Mining Weekly, 2016). German company develops four machines for blind-shaft construction, enlargement, Mining Weekly.
54. Zhi, W. (Securities Times, 2024). This ACPP technology system provides a new solution for underground space construction, Securities Times.
55. Optimization of section shape and support parameters of tunnel under complicated conditions
56. Response of surrounding environment during excavating of subway shaft adjacent to building
58. McCracken, A., and Stacey, T. (1989, January 5–7). Geotechnical risk assessment for large-diameter raise-bored shafts. Proceedings of the Shaft Engineering Conference, Harrogate, UK.
59. Construction Techniques and Safety Analysis for a Deep Vertical Shaft and Vertical Shaft Shifting to Main Tunnel
60. A review of some aspects of shaft design
61. Zhao, X. (2018). Fundamental Theory and Development Trends of Ultra-Deep Shaft Construction. Metal Mine, 1–10.
63. Muramatsu, M., and Abe, Y. (1996). Considerations in shaft excavation and peripheral ground deformation. Geotechnical Aspects of Underground Construction in Soft Ground, CRC Press.
64. Bruce, D.A., Chan, P.H., and Tamaro, G.J. (1992). Design, Construction and Performance of a Deep Circular Diaphragm Hall, ASTM International.
10.1520/STP19747S ↗65. Discussion on value of coefficient o in structural design of circular diaphragm wall
66. Marten, S., and Bourgeois, E. (2005, January 15–17). Three-dimensional behaviour of a circular excavation in Nantes, France. in Geotechnical aspects of underground construction in soft ground. Proceedings of the 5th International Conference of TC 28 of the ISSMGE, Amsterdam, The Netherlands.
10.1201/NOE0415391245.ch120 ↗67. Furlani, G., Guiducci, G., Lucarelli, A., Carrettucci, A., and Sorge, R. (2011, January 15–19). 3-D finite element modeling and construction aspects for vertical shafts in Metro C Rome. Proceedings of the International Symposium on Geotechnical Aspects of Underground Construction in Soft Ground, Rome, Italy.
68. Zhao, D., Li, H., and Tu, H. (2022). Research status and prospect of design and construction technology of ultra-deep shaft tunnel. Railw. Investig. Surv., 48.
69. Example of the application of jet grouting to the neutralisation of geotechnical hazard in shaft structures
10.1515/sgem-2015-0037 ↗70. Zhang, X. (2007). Application of Bolt-Sprayed Concrete Technology in Mine Shaft Engineering. Coal Technol., 89–91.
71. Application and development direction of radial horizontal well technology
72. Determination of critical criterion of tensile-shear failure in Brazilian disc based on theoretical analysis and meso-macro numerical simulation
10.1016/j.compgeo.2021.104096 ↗73. Hard rock miner’s handbook, edition 5
75. Vertical shaft excavation shaping and surrounding rock control technology under the coupling action of high ground stress and fracture formation
10.1061/(ASCE)CF.1943-5509.0001524 ↗76. Application of Deep Foundation Pit Support Construction Technology in Construction Engineering
79. Research on superimposed monolithic prefabricated assembly technology for underground engineering
80. Three-dimensional numerical simulation of a caisson prefabricated structural shell-joint model
83. Study on the stress law of VSM caisson during the sinking process of borehole
85. Guo, M., Dong, X., and Yang, Z. (2023). Settlement analysis of the giant open caisson during the construction of the Changtai Yangtze River Bridge. Front. Earth Sci., 10.
10.3389/feart.2022.1056695 ↗87. Centrifugal model test study of caisson sinking resistance
90. Jamuna river 230 kV crossing, Bangladesh. Part 2: Construction
91. Safiullah, A. (2005, January 10). Geotechnical problems of bridge construction in Bangladesh. Proceedings of the Japan-Bangladesh Joint Seminar on Advances in Bridge Engineering, Dhaka, Bangladesh.
93. Field study on deformation and stress characteristics of large open caisson during excavation in deep marine soft clay
10.1155/2021/7656068 ↗94. Sinking a jacked caisson within the London Basin geological sequence for the Thames Water Ring Main extension
10.1144/1470-9236/09-055 ↗95. Construction technology of open caisson for oversize surge shaft in drift gravel stratum
97. Farr, E.J. (Trenchless Technology, 2012). New Shaft Construction Method Successfully Introduced in the United States, Trenchless Technology.
98. Vertical shaft machines. State of the art and vision
99. Thomas, T. (2025, March 10). World’s Largest Diameter Vertical Shaft Boring Machine Launched. Available online: https://tunnellingjournal.com/worlds-largest-diameter-vertical-shaft-boring-machine-launched/.
100. Research and application of design and construction technology of assembled shaft: A case study of a sinking shaft underground parking garage in Nanjing, China