Project Management Information Systems (PMISs): A Statistical-Based Analysis for the Evaluation of Software Packages Features

Rosa Micale, Concetta Manuela La Fata, Alberto Lombardo, Giada La Scalia

Applied Sciences· Volume 11· Issue 23

Abstract

Project Managers (PMs) working in competitive markets are finding Project Management Information Systems (PMISs) useful for planning, organizing and controlling projects of varying complexity. A wide variety of PMIS software is available, suitable for projects differing in scope and user needs. This paper identifies the most useful features found in PMISs. An extensive literature review and analysis of commercial software is made to identify the main features of PMISs. Afterwards, the list is reduced by a panel of project management experts, and a statistical analysis is performed on data acquired by means of two different surveys. The relative importance of listed features is properly computed, and the interactions between the respondent’s profiles and PMIS features are also investigated by cluster and respondents’ analyses. The paper provides information for researchers and practitioners interested in PMISs packages and their applications. Furthermore, the analyses may help practitioners when choosing a PMIS, and also for developers of PMISs software in understanding user needs.
Source: crossref · Quality: baseline

Research context

OpenAlex topics: Construction Project Management and Performance · BIM and Construction Integration · Software Engineering Techniques and Practices

SciVX discovery tags are terminology-based. OpenAlex topics are source-provided classifications.

Affiliations

Department of Engineering, University of Palermo, Viale delle Scienze Building 8, 90128 Palermo, Italy

References (43)

Show source-provided references
1. The concept of project complexity—A review10.1016/0263-7863(95)00093-3 ↗
2. The need for new paradigms for complex projects10.1016/S0263-7863(98)00047-7 ↗
3. From projectification to programmification10.1016/j.ijproman.2006.09.014 ↗
4. Problems in managing internal development projects in multi-project environments10.1016/S0263-7863(02)00097-2 ↗
5. Awe, O.A., and Church, E.M. Project flexibility and creativity: The moderating role of training utility. Manag. Decis., 2020. in press.10.1108/MD-02-2020-0226 ↗
6. Knowledge translation in project portfolio decision-making: The role of organizational alignment and information support system in selecting innovative ideas10.1108/MD-11-2019-1532 ↗
7. (2017). A Guide to the Project Management Body of Knowledge, Project Management Institute (PMI), Inc.. PMBOK Guide Sixth Edition.
8. Implementing packaged enterprise software in multi-site firms: Intensification of organizing and learning10.1057/palgrave.ejis.3000708 ↗
9. Software project effort estimation with voting rules10.1016/j.dss.2008.12.002 ↗
10. Open source software success: Measures and analysis10.1016/j.dss.2011.09.003 ↗
11. Project Management information systems: An empirical study of their impact on project manager and project success10.1016/j.ijproman.2007.06.002 ↗
12. Towards a conceptual reference model for project management information systems10.1016/j.ijproman.2008.01.008 ↗
13. Project Management Information Systems (PMIS) factors: An empirical study of their impact on Project Management Decision Making (PMDM) performance
14. The effects of Project Management Information Systems on decision making in a multi project environment10.1016/j.ijproman.2011.05.005 ↗
15. Success model of project management information system in construction10.1016/j.autcon.2012.04.015 ↗
16. An integrated approach to implement Project Management Information System within the Extended Enterprise10.1016/j.ijproman.2012.12.003 ↗
17. Planning and Scheduling of Project using Microsoft Project (case study of a building in India)
18. Impact of Project Management Software on the Project Failure Rates in Nigerian Construction Industry
19. Nguyen, T.D., Nguyen, D.T., and Nguyen, T.M. (2016). Information System Success: The Project Management Information System for ERP Projects. Lecture Notes of the Institute for Computer Sciences, Springer.10.1007/978-3-319-29236-6_20 ↗
20. Towards a smart project management information system10.1016/S0263-7863(97)00037-9 ↗
21. Project Management in construction: Software use and research directions10.1061/(ASCE)0733-9364(2001)127:2(101) ↗
22. Web-based construction project management systems: How to make them successful?10.1016/j.autcon.2004.02.003 ↗
23. Factors influencing the usage and selection of project management software10.1109/TEM.2003.810821 ↗
24. An AHP-based approach to PMISs assessment10.1504/IJBE.2015.065995 ↗
25. Ranking and Rating: Neglected Biases in Factor Analysis of Postmaterialist Values10.1093/ijpor/edy007 ↗
26. Measuring personal values: An evaluation of alternative methods10.1177/002224378001700412 ↗
27. Robinson, J.P., Shaver, P.R., and Wrightsman, L.S. (1999). Maximizing questionnaire quality. Measures of Political Attitudes: Volume 2 of Measures of Social Psychological Attitudes, Academic Press.
28. A Comparative Study of Divisive and Agglomerative Hierarchical Clustering Algorithms10.1007/s00357-018-9259-9 ↗
29. Akalin, A. (2020). Computational Genomics with r, Chapman and Hall/CRC.10.1201/9780429084317 ↗
30. Effect of Different Distance Measures on the Performance of K-Means Algorithm: An Experimental Study in Matlab
31. Evaluation of Conjoint Analysis Results: A Comparison of Methods10.1177/002224378001700114 ↗
32. Axiomatic foundation of the analytic hierarchy process10.1287/mnsc.32.7.841 ↗
33. Attribute conflict and preference uncertainty: Effects on judgment time and error10.1287/mnsc.46.1.88.15131 ↗
34. Souza, J.P.E., Alves, J.M., Damiani, J.H.S., and Silva, M.B. (August, January 28). Design of Experiments: Its importance in the efficient Project Management. Proceedings of the 22nd International Conference on Production Research, Iguassu Falls, Brazil.
35. Decision quality attribute using weights ranked10.1287/mnsc.42.11.1515 ↗
36. Determining the importance weights for the customer requirements in QFD using a fuzzy AHP with an extent analysis approach10.1080/07408170304355 ↗
37. A weighted logistic regression for conjoint analysis and kansei engineering10.1002/qre.866 ↗
38. A heuristic method for estimating attribute importance by measuring choice time in a ranking task10.3233/RDA-2012-0065 ↗
39. Prioritization of Alternatives with AHP Plus Response Latency and Web Surveys10.1080/14783363.2014.904565 ↗
40. Service quality design through a smart use of conjoint analysis10.1108/15982688200400004 ↗
41. Optimal planning and scheduling of high rise buildings
42. Use of Project Management Information System to Initiate the Quality Gate Process for ERP Implementation
43. Project Management Information System in construction industry