journal article·2023-02-07Open access

A Methodology Linking Tamping Processes and Railway Track Behaviour

Stefan Offenbacher, Christian Koczwara, Matthias Landgraf, Stefan Marschnig

Applied Sciences· Volume 13· Issue 4

Abstract

Today’s railway transport is built upon high-performance infrastructure. Cost-effective yet sustainable infrastructure presumes tracks with a precise and durable geometry. At ballasted tracks, the geometry is created and restored through tamping machines, which position the track panel and compact the ballast beneath the sleepers. It is commonly agreed that the ballast compaction plays an important role in the long-term stability of the track. Yet, there is no method available which allows a direct correlation between the compactness of the ballast and the stability of the track geometry. Available studies either model track behaviour without considering the bedding, or analyse ballast compactness locally while disregarding its influence on the track geometry. This paper presents a new methodology which establishes a relation between these two topics—ballast compaction during tamping and subsequent track behaviour. A state-of-the-art tamping machine has been equipped with an experimental measurement setup, constantly recording relevant data during every tamping process. These data can be used to derive an indication for the achieved compaction under every sleeper. Utilising the tamping machine’s internal measuring system for track geometry documentation, every tamping process (every sleeper) is assigned to the precise position along the track. The data set is merged and synchronised with regular track geometry measurements of the infrastructure manager. The result is a comprehensive data set which allows precise analyses between tamping machine measurements and track behaviour. This data set provides the foundation for future research, aiming towards a better understanding of the tamping process and its influence on the quality and durability of the established track geometry.
Source: crossref · Quality: baseline

Research context

OpenAlex topics: Railway Engineering and Dynamics · Geotechnical Engineering and Underground Structures · Civil and Geotechnical Engineering Research

SciVX discovery tags are terminology-based. OpenAlex topics are source-provided classifications.

Affiliations

Institute of Railway Engineering and Transport Economy, Graz University of Technology, 8010 Graz, Austria

Plasser & Theurer, 4021 Linz, Austria

Funding

Open Access Funding by Graz University of Technology

References (49)

Show source-provided references
1. Forschungs- und Versuchsamt des Internationalen Eisenbahnwesens (ORE) (1987). Frage D 161.1: Dynamische Auswirkungen auf Das Gleis Infolge 22,5 t Radsatzlast—Bericht Nr. 4: Dynamische Auswirkungen der Anhebung der Radsatzlast von 20 auf 22,5 t und der geschätzte Anstieg der Oberbauerhaltungskosten, Forschungs- und Versuchsamt des Internationalen Eisenbahnwesens (ORE).
2. Forschungs- und Versuchsamt des Internationalen Eisenbahnwesens (ORE) (1988). Frage D 161: Dynamische Erscheinungen der Wechselwirkung Fahrzeug/Gleis, aus der Sicht der Gleisunterhaltung—Bericht Nr. 3: Schlussbericht, Schlussfolgerungen und Empfehlungen, Forschungs- und Versuchsamt des Internationalen Eisenbahnwesens (ORE).
3. Optimisation model to schedule railway track renewal operations: A life-cycle cost approach10.1080/15732479.2014.982133 ↗
4. Experimental and Theoretical Evaluation of Side Tamping Method for Ballasted Railway Track Maintenance10.21307/tp-2020-036 ↗
5. Measurement Data-Driven Life-Cycle Management of Railway Track10.1177/0361198120946007 ↗
6. Integer programming to optimize tamping in railway tracks as preventive maintenance10.1061/(ASCE)TE.1943-5436.0000296 ↗
7. Predictive maintenance model for ballast tamping10.1061/(ASCE)TE.1943-5436.0000825 ↗
8. An opportunistic preventive maintenance policy for tamping scheduling of railway tracks10.1080/23248378.2020.1737256 ↗
9. Neuhold, J. (2020). Tamping within Sustainable Track Asset Management, Verlag der Technischen Universität Graz.
10. Modeling tamping recovery of track geometry using the copula-based approach10.1177/0954409718757556 ↗
11. The effects of tamping on railway track geometry degradation10.1177/0954409713480439 ↗
12. (2019). Railway Applications—Track–Track Geometry Quality—Part 1: Characterization of Track Geometry (Standard No. EN 13848-1).
13. (2017). Railway Applications—Track—Track Geometry Quality—Part 5: Geometrical Quality Levels—Plain Line, Switches and Crossings (Standard No. EN 13848-5).
14. Development of Railway Track Geometry Indexes Based on Statistical Distribution of Geometry Data10.1061/(ASCE)0733-947X(2010)136:8(693) ↗
15. Establishment of Track Quality Index Standard Recommendations for Beijing Metro
16. Offenbacher, S., Neuhold, J., Veit, P., and Landgraf, M. (2020). Analyzing Major Track Quality Indices and Introducing a Universally Applicable TQI. Appl. Sci., 10.10.3390/app10238490 ↗
17. (2014). Railway Applications—Track—Track Geometry Quality—Part 6: Characterisation of Track Geometry Quality (Standard No. EN 13848-6).
18. Preparing Track Geometry Data for Automated Maintenance Planning10.1061/JTEPBS.0000349 ↗
19. BB-Infrastruktur AG (2017). Instandhaltungsplan Oberbauanlagen, BB-Infrastruktur AG.
20. SBB (2020). Einbau, Kontrollen und Unterhalt von Gleisen, no. 4161906, SBB.
21. Hansmann, F., Nemetz, W., and Spoors, R. (2021). Keeping Track of Track Geometry, PMC Media House GmbH. [1st ed.].
22. Advancing Railway Asset Management Using Track Geometry Deterio-ration Modeling Visualization10.1061/JTEPBS.0000626 ↗
23. Zum Verhalten von Einzelfehlern der Gleislage
24. Degradation Prediction of Rail Tracks: A Review of the Existing Literature10.2174/1874447801812010088 ↗
25. Track geometry degradation and maintenance modelling: A review10.1177/0954409716657849 ↗
26. Prediction of railway track geometry defects: A case study10.1080/15732479.2019.1679193 ↗
27. Evaluating the applicability of multi-sensor equipped tamping machines for ballast condition monitoring10.1016/j.measurement.2020.108881 ↗
28. Barbir (2022). Development of Condition-Based Tamping Process in Railway Engineering—Operating Phases and Motion Behavior, Ballast Condition Determination, Ballast fluidization, TU Wien.
29. Zaayman, L. (2003). Mechanisation of Track Work in Developing Countries, De Rooi Publications. [1st ed.].
30. (2022). Railway Applications—Infrastructure—Acceptance of Works—Part 1: Works on Ballasted Track—Plain Line, Switches and Crossings (Standard No. EN 13231-1).
31. Lichtberger, B. (2011). Track Compendium, DVV Media Group GmbH I Eurailpress. [2nd ed.].
32. Zaayman, L. (2017). The Basic Principles of Mechanised Track Maintenance, PMC Media House GmbH. [3rd ed.].
33. Fischer, J. (1983). Einfluss von Frequenz und Amplitude auf die Stabilisierung von Oberbauschotter, Graz University of Technology.
34. Discrete Element Method Simulation of Railway Ballast Compactness During Tamping Process10.2174/1874129001307010103 ↗
35. Omerović, S., Daxberger, H., Koczwara, C., Antony, B., and Auer, F. (2021). Anwendung der Diskrete-Elemente-Methode im Eisen-bahnbau, Ei—Der Eisenbahningenieur.
36. Compaction of Railway Ballast During Tamping Process: A Parametric Study10.1063/1.3179964 ↗
37. Experimental study of railway ballast consolidation inhomogeneity under vibration loading10.1556/606.2020.15.1.3 ↗
38. Barbir, O., Antony, B., Kopf, F., Pistrol, J.P., Adam, D., and Auer, F. (November, January 28). Compaction energy as an indicator for ballast quality. Proceedings of the 12th World Congress on Railway Research, Tokyo, Japan.
39. Evaluation of Railway Ballast Layer Consolidation after Maintenance Works10.14311/AP.2019.59.0077 ↗
40. Influence of a tamping operation on the vibrational characteristics and resistance-evolution law of a ballast bed10.1016/j.conbuildmat.2019.117879 ↗
41. Comparison of the effects and efficiency of vertical and side tamping methods for ballasted railway tracks
42. Quality assurance and control system for railway track tamping10.1051/matecconf/201821603004 ↗
43. Study of Railway Ballast Compactness under Tamping Operation10.3923/jas.2013.2072.2076 ↗
44. Development of condition-based tamping process in railway engineering10.1002/cepa.797 ↗
45. Effect of tamping operation on mechanical qualities of ballast bed based on DEM-MBD coupling method10.1016/j.compgeo.2020.103574 ↗
46. Hummitzsch, R. (2009). Zur Prognostizierbarkeit des Qualitätsverhaltens von Gleisen: Statistische Analyse des Gleisverhaltens zur Erstellung eines Prognosemodells, TU Graz.
47. Auer, F. (2004). Gleislagequalitätsanalyse zur Instandhaltungsoptimierung, ETR—Eisenbahntechnische Rundschau.
48. Fellinger, M. (2020). Sustainable Asset Management for Turnouts—From Measurement Data Analysis to Behaviour and Maintenance Prediction, Graz University of Technology.
49. Offenbacher, S., Landgraf, M., Marschnig, S., Antony, B., and Koczwara, C. (2022, January 6–10). Ballast condition monitoring with tamping ma-chines. Proceedings of the World Congress on Railway Research, Birmingham, UK.