Abstract

Offsite construction (OSC) is one of the alternative methods for the various challenges that the construction sector faces today. This study developed a management system based on building information modeling (BIM) to execute OSC projects successfully. Because OSC differs from the conventional onsite building method, the authors studied and analyzed several project cases and interviewed the participants and stakeholders. The OSC method has unique characteristics in the aspects of the projects’ location and time, production process, flow, method, facility, and environment. Moreover, before the system development, we analyzed the OSC project management, usability, and system requirements. These requirements were turned into a BIM-based system following a waterfall model, with six management menus: drawing, schedule, production, logistics, installation and progress monitoring, and progress payment. This study implemented each menu’s vital functions within the system more effectively due to the BIM-based technological features, such as object-oriented data processing, visualization, high interoperability, linkage, and integration. The developed system was applied to four projects. The test resulted in a streamlined work process, improved activity, and less input time and workload than in a non-BIM-based management environment. These findings indicated that the proposed BIM-based system enabled OSC project management to perform better.
Source: crossref · Quality: baseline

Research context

OpenAlex topics: BIM and Construction Integration · Construction Project Management and Performance · Infrastructure Maintenance and Monitoring

SciVX discovery tags are terminology-based. OpenAlex topics are source-provided classifications.

Affiliations

Department of Architectural and Urban Systems Engineering, Ewha Womans University, 52, Ewhayeodae-Gil, Seodaemun-Gu, Seoul 03760, Korea

Funding

Korea Agency for Infrastructure Technology Advancement (KAIA)

References (97)

Show source-provided references
1. Barbosa, F., Woetzel, J., Mischke, J., Ribeirinho, M.J., Sridhar, M., Parsons, M., Bertram, N., and Brown, S. (2017). Reinventing Construction through a Productivity Revolution, McKinsey Global Institute.
2. Construction industry productivity and the potential for collaborative practice10.1016/j.ijproman.2013.05.007 ↗
3. AGC (2020). Strong Demand for Work amid Stronger Demand for Workers: The 2020 Construction Hiring and Business Outlook, AGC.
4. Bullen, N. (2021). International Construction Market Survey 2021, Turner & Townsend Partners LLP.
5. Richnák, P., and Fidlerová, H. (2022). Impact and Potential of Sustainable Development Goals in Dimension of the Technological Revolution Industry 4.0 within the Analysis of Industrial Enterprises. Energies, 15.10.3390/en15103697 ↗
6. Hamilton, I., Rapf, O., Kockat, D.J., Zuhaib, D.S., Abergel, T., Oppermann, M., Otto, M., Loran, S., Fagotto, I., and Steurer, N. (2020). 2020 Global Status Report for Buildings and Construction: Towards a Zero-emissions, Efficient and Resilient Buildings and Construction Sector, United Nations Environmental Programme.
7. Environmental sustainability of off-site manufacturing: A literature review10.1108/ECAM-06-2019-0288 ↗
8. Carbon emission of global construction sector10.1016/j.rser.2017.06.001 ↗
9. Pham, H.T., Rafieizonooz, M., Han, S., and Lee, D.-E. (2021). Current Status and Future Directions of Deep Learning Applications for Safety Management in Construction. Sustainability, 13.10.3390/su132413579 ↗
10. Keily, M.D., and Douglas, P. (2022). IPAF Global Safety Report 2022, IPAF.
11. Rodrigues, F., Baptista, J.S., and Pinto, D. (2022). BIM Approach in Construction Safety—A Case Study on Preventing Falls from Height. Buildings, 12.10.3390/buildings12010073 ↗
12. Overcoming barriers to off-site construction through engaging stakeholders: A two-mode social network analysis10.1016/j.jclepro.2018.07.299 ↗
13. MBI (2019). 2019 Permanent Modular Construction Report, Modular Building Institute (MBI).
14. Barriers to promoting prefabricated construction in China: A cost–benefit analysis10.1016/j.jclepro.2017.10.171 ↗
15. Hoover, S., Trombitas, P., and Cowles, E. (2017). Prefabrication: The Changing Face of Engineering and Construction, Fails Management Institute-FMI/BIMForum Prefabrication Survey.
16. Development of performance criteria for sustainability evaluation of modular versus conventional construction methods10.1016/j.jclepro.2016.10.108 ↗
17. Understanding on-site inspection of construction projects based on keyword extraction and topic modeling10.1109/ACCESS.2020.3035214 ↗
18. Autonomous production tracking for augmenting output in off-site construction10.1016/j.autcon.2015.03.013 ↗
19. A SWOT analysis for promoting off-site construction under the backdrop of China’s new urbanisation10.1016/j.jclepro.2017.06.147 ↗
20. Cost analysis for sustainable off-site construction based on a multiple-case study in China10.1016/j.habitatint.2016.08.002 ↗
21. Bertram, N., Fuchs, S., Mischke, J., Palter, R., Strube, G., and Woetzel, J. (2019). Modular Construction: From Projects to Products, McKinsey & Company.
22. Motivations and limitations of prefabricated building: An overview10.4028/www.scientific.net/AMM.802.668 ↗
23. Perceptions of offsite construction in the United States: An investigation of current practices10.1016/j.jobe.2019.101138 ↗
24. Buntrock, D. (2017). Prefabricated housing in Japan. Offsite Architecture, Routledge.10.4324/9781315743332-12 ↗
25. Technological developments of Japanese prefabricated housing in an early stage10.1002/2475-8876.12064 ↗
26. AGCS (2021). Managing the New Age of Construction Risk: 10 Trends to Watch as the Sector Builds Back Better, AGCS.
27. Smith, R.E. (2016). Off-Site and Modular Construction Explained, National Institute of Building Sciences.
28. Risks of modular integrated construction: A review and future research directions10.1007/s42524-019-0059-7 ↗
29. Performance-based control of variability and tolerance in off-site manufacture and assembly: Optimization of penalty on poor production quality10.1080/01446193.2019.1616789 ↗
30. Understanding stakeholders in off-site manufacturing: A literature review10.1061/(ASCE)CO.1943-7862.0001674 ↗
31. Růžička, J., Veselka, J., Rudovský, Z., Vitásek, S., and Hájek, P. (2022). BIM and Automation in Complex Building Assessment. Sustainability, 14.10.3390/su14042237 ↗
32. The role of implementing BIM applications in enhancing project management knowledge areas in Egypt10.1016/j.asej.2021.05.023 ↗
33. Optimized rescheduling of multiple production lines for flowshop production of reinforced precast concrete components10.1016/j.autcon.2018.08.002 ↗
34. A review of building information modeling (BIM) and the internet of things (IoT) devices integration: Present status and future trends10.1016/j.autcon.2019.01.020 ↗
35. New model for identifying critical success factors influencing BIM adoption from precast concrete manufacturers’ view10.1061/(ASCE)CO.1943-7862.0001773 ↗
36. A holistic review of off-site construction literature published between 2008 and 201810.1016/j.jclepro.2018.08.195 ↗
37. Embeddedness and collaborative venture networks among Korean construction firms for overseas construction projects10.3846/13923730.2014.890658 ↗
38. Integrating a novel multiple-objective FBI with BIM to determine tradeoff among resources in project scheduling10.1016/j.knosys.2021.107640 ↗
39. Boafo, F.E., Kim, J.-H., and Kim, J.-T. (2016). Performance of modular prefabricated architecture: Case study-based review and future pathways. Sustainability, 8.10.3390/su8060558 ↗
40. Performance of the supply chains for New Zealand prefabricated house-building10.1016/j.scs.2020.102537 ↗
41. Smith, R.E., and Quale, J.D. (2017). Offsite Architecture: Constructing the Future, Taylor & Francis.10.4324/9781315743332 ↗
42. Prefabricated technology in a modular house10.14257/ijast.2014.73.04 ↗
43. A literature review of the evolution of British prefabricated low-rise housing10.1108/SS-08-2015-0037 ↗
44. Evolution of nontraditional methods of construction: 21st century pragmatic viewpoint10.1061/(ASCE)AE.1943-5568.0000078 ↗
45. Life cycle sustainability performance assessment framework for residential modular buildings: Aggregated sustainability indices10.1016/j.buildenv.2018.04.019 ↗
46. Application of discrete-event simulation to investigate effects of client order behaviour on off-site manufacturing performance in Australia
47. Precast supply chain management in off-site construction: A critical literature review10.1016/j.jclepro.2019.05.229 ↗
48. Zhang, Y., Fan, G., Lei, Z., Han, S., Raimondi, C., Al-Hussein, M., and Bouferguene, A. (2016, January 18–21). Lean-based diagnosis and improvement for offsite construction factory manufacturing facilities. Proceedings of the International Symposium on Automation and Robotics in Construction, Auburn, AL, USA.10.22260/ISARC2016/0131 ↗
49. Research on assembly sequence planning and optimization of precast concrete buildings10.3846/jcem.2018.458 ↗
50. Classification of production systems for industrialized building: A production strategy perspective10.1080/01446193.2013.812226 ↗
51. Future opportunities for offsite in the UK10.1080/01446190601071821 ↗
52. Study on construction material allocation policies: A simulation optimization method10.1016/j.autcon.2018.02.012 ↗
53. Process-oriented framework to improve modular and offsite construction manufacturing performance10.1061/(ASCE)CO.1943-7862.0001909 ↗
54. Life cycle design and prefabrication in buildings: A review and case studies in Hong Kong10.1016/j.autcon.2013.09.006 ↗
55. Jang, J.Y., Lee, C., Kim, J.I., and Kim, T.W. (2019, January 21–24). Research trends in off-site construction management: Review of literature at the process level. Proceedings of the Modular and Offsite Construction (MOC) Summit Proceedings, Banff, AB, Canada.10.29173/mocs113 ↗
56. Pasco, J., Lei, Z., and Aranas, C. (2022). Additive Manufacturing in Off-Site Construction: Review and Future Directions. Buildings, 12.10.3390/buildings12010053 ↗
57. Qi, B., Razkenari, M., Li, J., Costin, A., Kibert, C., and Qian, S. (2020). Investigating US industry practitioners’ perspectives towards the adoption of emerging technologies in industrialized construction. Buildings, 10.10.3390/buildings10050085 ↗
58. Linking permissioned blockchain to Internet of Things (IoT)-BIM platform for off-site production management in modular construction10.1016/j.compind.2021.103573 ↗
59. A cost evaluation model for IoT-enabled prefabricated construction supply chain management10.1108/IMDS-12-2020-0735 ↗
60. Prefabrication supply chains with multiple shops: Optimization for job allocation10.1016/j.autcon.2022.104155 ↗
61. Abdula, S.A., and Usman, M. (2020, January 4–5). Identifying, Analyzing And Evaluating the Impact of Quality of Supply Chain in Construction Sector Using Lean Six Sigma Methodology. Proceedings of the 36th International Business Information Management Association (IBIMA), Granada, Spain.
62. Identifying supply chain capabilities of construction firms in industrialized construction10.1080/09537287.2020.1732494 ↗
63. Hybrid intelligent vehicle system for managing construction supply chain in precast concrete building construction projects10.1108/WJE-08-2020-0361 ↗
64. Lee, D., and Lee, S. (2021). Digital twin for supply chain coordination in modular construction. Appl. Sci., 11.10.3390/app11135909 ↗
65. Empirical study of identifying logistical problems in prefabricated interior wall panel construction10.1061/(ASCE)ME.1943-5479.0000907 ↗
66. Sources of uncertainties in offsite logistics of modular construction for high-rise building projects10.1061/(ASCE)ME.1943-5479.0000905 ↗
67. Dynamic and proactive risk-based methodology for managing excessive geometric variability issues in modular construction projects using Bayesian theory10.1061/(ASCE)CO.1943-7862.0001747 ↗
68. Geometric quality inspection of prefabricated MEP modules with 3D laser scanning10.1016/j.autcon.2019.103053 ↗
69. Mirror-aided registration-free geometric quality inspection of planar-type prefabricated elements using terrestrial laser scanning10.1016/j.autcon.2020.103442 ↗
70. 4D-based workspace conflict detection in prefabricated building constructions10.1061/(ASCE)CO.1943-7862.0001883 ↗
71. Research on the rework risk core tasks in prefabricated construction in China10.1108/ECAM-07-2020-0521 ↗
72. Wuni, I.Y., Shen, G.Q., and Saka, A.B. (2022). Computing the severities of critical onsite assembly risk factors for modular integrated construction projects. Eng. Constr. Archit. Manag.10.1108/ECAM-07-2021-0630 ↗
73. Web-based construction project management systems: How to make them successful?10.1016/j.autcon.2004.02.003 ↗
74. Smart Project Management Information Systems (SPMIS) for Engineering Projects–Project Performance Monitoring & Reporting
75. Application of agent-based modeling and simulation to understanding complex management problems in CEM research10.3846/13923730.2014.893916 ↗
76. Jang, Y., Lee, J.-M., and Son, J. (2022). Development and application of an integrated management system for off-site construction projects. Buildings, 12.10.3390/buildings12071063 ↗
77. Formalization of the flow of component-related information in precast concrete supply chains10.1061/(ASCE)0733-9364(2008)134:2(112) ↗
78. Improved precast production–scheduling model considering the whole supply chain10.1061/(ASCE)CP.1943-5487.0000667 ↗
79. Prefabricated construction enabled by the Internet-of-Things10.1016/j.autcon.2017.01.006 ↗
80. Liu, J., and Zou, Z. (2021, January 23–25). Application of BIM technology in prefabricated buildings. Proceedings of the 5th International Conference on Civil Engineering, Architectural and Environmental Engineering, Chengdu, China.
81. Online Planning and Management of Design Coordination Tasks with BIM: Challenges and Opportunities10.1061/(ASCE)ME.1943-5479.0001027 ↗
82. IFC-based development of as-built and as-is BIMs using construction and facility inspection data: Site-to-BIM data transfer automation10.1061/(ASCE)CP.1943-5487.0000727 ↗
83. He, X., and Liu, R. (2020). A Relational Database Schema of Construction Costs Tracking from BIM Model to Final Costs. Proceedings of the Construction Research Congress 2020: Project Management and Controls, Materials, and Contracts, American Society of Civil Engineers.10.1061/9780784482889.083 ↗
84. A discrepancy analysis of BIM-based quantity take-off for building interior components10.1061/(ASCE)ME.1943-5479.0000684 ↗
85. Digital quality management in construction industry within BIM projects
86. Rough Registration of BIM Element Projection for Construction Progress Tracking10.1109/ACCESS.2022.3144150 ↗
87. Qi, B., Chen, K., and Costin, A. (2018, January 2–4). RFID and BIM-enabled prefabricated component management system in prefabricated housing production. Proceedings of the Construction Research Congress, New Orleans, LA, USA.10.1061/9780784481264.058 ↗
88. Akhavan, P., Ravanshadnia, M., and Shahrayini, A. (2021, January 23). Blockchain technology in the construction industry: Integrating BIM in project management and IOT in supply chain management. Proceedings of the 2nd International Conference on Knowledge Management, Blockchain & Economy, Tehran, Iran.
89. Integrated BIM and DfMA parametric and algorithmic design based collaboration for supporting client engagement within offsite construction10.1016/j.autcon.2021.104015 ↗
90. Modelling in off-site construction supply chain management: A review and future directions for sustainable modular integrated construction10.1016/j.jclepro.2021.127503 ↗
91. Jeong, W., Chang, S., Son, J., and Yi, J.-S. (2016). BIM-integrated construction operation simulation for just-in-time production management. Sustainability, 8.10.3390/su8111106 ↗
92. Jeong, W., and Son, J. (2016). An algorithm to translate building topology in building information modeling into object-oriented physical modeling-based building energy modeling. Energies, 9.10.3390/en9010050 ↗
93. Jiang, L., Shi, J., Pan, Z., and Chen, P. (2020). Information Integrated Management of Prefabricated Project Based on BIM and Knowledge Flow Based Ontology. Proceedings of the Construction Research Congress 2020: Project Management and Controls, Materials, and Contracts, American Society of Civil Engineers.10.1061/9780784482889.027 ↗
94. BIM-based platform for collaborative building design and project management10.1061/(ASCE)CP.1943-5487.0000830 ↗
95. Blockchain-enabled IoT-BIM platform for supply chain management in modular construction10.1061/(ASCE)CO.1943-7862.0002229 ↗
96. Developing an Integrated BIM+ GIS Web-Based Platform for a Mega Construction Project10.1007/s12205-022-0251-x ↗
97. BIM/GIS data integration from the perspective of information flow10.1016/j.autcon.2022.104166 ↗