Numerical Study on Track–Bridge Interaction of Integral Railway Rigid-Frame Bridge
Source abstract
Abstract
Track–bridge interaction (TBI) is an increasingly essential consideration for the design and operation of railway bridges, especially for the innovative bridge structure systems that constantly spring up over the years. This paper focuses on the characteristics of additional forces in continuous welded rails (CWRs) on the 3 × 70 m integral rigid-frame bridge of the Fuzhou–Xiamen High-Speed Railway, which is a novel high-speed railway (HSR) bridge structure system in China. The differential equations of rail stress and displacement are first investigated and an integrative analysis model comprising of rail, track, bridge and piers is then established. Secondly, the characteristics of representative additional forces are illustrated and the influences of different design parameters are discussed in detail. Furthermore, suitable rail fasteners, optimal layout schemes of adjacent bridges and reasonable stiffness of piers are also studied. The results indicate that the additional expansion force accounts for the largest proportion of additional forces in integral rigid-frame bridges and that resistance reduction obviously weakens the various additional forces caused by the TBI effect, while the broken gap of the rail increases greatly. Small resistance fasteners are recommended to be applied onto this new type of HSR line as these provide reductions in additional stresses of CWRs compared to WJ-8 fasteners. The additional rail stresses after adopting an adjacent span scheme of 4 × 32 m simply supported beams are less than the corresponding stresses in other schemes. The results also show that there is a strong correlation between the minimum threshold value of the pier stiffness and the longitudinal resistance of HSR lines for the integral rigid-frame bridge. This work could serve as a valuable reference for detailed design and safety evaluation of integral rigid-frame bridges.
Source: crossref · Quality: baseline
Research context
OpenAlex topics: Railway Engineering and Dynamics · Structural Engineering and Vibration Analysis · Structural Load-Bearing Analysis
SciVX discovery tags are terminology-based. OpenAlex topics are source-provided classifications.
Affiliations
School of Civil Engineering, Central South University, Changsha 410075, China
Key Laboratory of Heavy Railway Engineering Structure of Education Ministry, Changsha 410075, China
China Railway Siyuan Survey and Design Group Co., Ltd., Wuhan 430063, China
Funding
the National Natural Science Foundation of China · Natural Science Foundation of Hunan Province
References (31)
Show source-provided references
1. Esveld, L.C. (2001). Modern Railway Track, MRT Production. [2nd ed.].
2. Guang, Z.Y. (2005). Railway Continuous Welded Rail, China Railway Publishing House. [4th ed.]. (In Chinese).
3. Frýba, L. (1996). Dynamics of Railway Bridges, Thomas Telford Ltd.10.1680/dorb.34716 ↗
4. Gao, L. (2012). Research and Application of Key Technologies of Continuous Welded Rails on High-Speed Railway, China Railway Publishing House. (In Chinese).
5. Thermal-induced buckling and postbuckling analysis of continuous railway tracks10.1016/j.ijsolstr.2016.04.037 ↗
6. Quasi-static distribution of braking and starting forces in rail and bridges
7. German Standard DS899/59 (1985). Special Procedures on Railway Shinkansen Bridge, Bridge Institute of Railway Bridge Authority. (In German).
8. International Union of Railways (2001). 774-3R. Track-Bridge Interaction Recommendations for Calculations, UIC International Union of Railways. [2nd ed.].
9. Longitudinal forces in continuously welded rails on bridge decks due to nonlinear track-bridge interaction10.1016/j.compstruc.2006.09.008 ↗
10. Longitudinal track-bridge interaction due to sudden change of coupling interface10.1016/j.compstruc.2008.08.012 ↗
11. Calçada, R., Delgado, R., e Matos, A.C., Goicolea, J.M., and Gabaldon, F. (2008). Track-Bridge Interaction on High-Speed Railways: Selected and Revised Papers from the Workshop on Track-Bridge Interaction on High-Speed Railways, CRC Press.10.1201/9780203895399 ↗
12. Loading-history-based track-bridge interaction analysis with experimental fastener resistance10.1016/j.engstruct.2014.11.002 ↗
13. Track-bridge interaction analysis using interface elements adaptive to various loading case10.1061/(ASCE)BE.1943-5592.0000916 ↗
14. Interaction analysis of continuous slab track (CST) on long-span continuous high-speed rail bridges
15. Interaction analysis of sliding slab track on railway bridge considering behavior of end-supporting anchors10.1007/s13296-019-00255-x ↗
16. Cho, S., Lee, K.C., Jang, S.Y., Lee, I., and Chung, W. (2020). Sequential track-bridge interaction analysis of quick-hardening track on bridge considering interlayer friction. Appl. Sci., 10.10.3390/app10155066 ↗
17. Track-bridge longitudinal interaction of continuous welded rails on arch bridge
18. Interaction between continuous welded rail and long-span steel truss arch bridge of a high-speed railway under seismic action10.1080/15732479.2017.1386690 ↗
19. Cai, X.P., Liu, W.L., Xie, K.Z., Zhu, W.J., Tan, X.Y., and Gao, Y.J. (2020). Layout optimization of rail expansion joint on long-span cable-stayed bridge for high-speed railway. Adv. Civ. Eng., 2020.10.1155/2020/8855140 ↗
20. Longitudinal force of continuously welded rail on suspension bridge with length exceeding 1000 m10.1080/10168664.2019.1577115 ↗
21. Integral railway bridges in Germany10.2749/101686611X12994961034534 ↗
22. Development of design and construction of high-speed railway bridges in Germany10.1016/j.engstruct.2018.02.059 ↗
23. Application of no support continuous rigid-framed system in Line 6
24. Design of integral rigid-frame bridge without bearings on high-speed railway
25. Influence of train braking on relative displacement between girder and rail of continuous welded rail upon rigid-frame bridge
26. Study on dynamic characteristics of continuously welded rail track on rigid bridge with long steep grade
27. Applicability of small resistance fastener on long-span continuous bridges of high-speed railway10.1007/s11771-013-1631-7 ↗
28. Sensitive factors research for track-bridge interaction of a long-span X-style steel-box arch bridge on high-speed railway10.1007/s11771-013-1855-6 ↗
29. Qing-yuan, X. (2005). Static and Dynamic 3D Finite Element Analysis of Additional Longitudinal Forces Transmission between CWR and High-Speed Railway Bridges [D], Central South University. (In Chinese).
30. Chinese National Standard, TB10015-2012 (2012). Code for Design of Railway Continuous Welded Rail, China Railway Publishing House. (In Chinese).
31. Chinese National Standard, TB-10621-2014 (2016). Code for Design of High Speed Railway, China Railway Publishing House. (In Chinese).