Show source-provided references
2. Exploring the status, benefits, barriers and opportunities of using BIM for advancing prefabrication practice
3. Critical success factors for enhancing the building information modelling implementation in building projects in Singapore
10.3846/13923730.2017.1374300 ↗4. Tariq, M.A., Farooq, U., Aamir, E., and Shafaqat, R. (2019, January 24–25). Exploring Adoption of Integrated Building Information Modelling and Virtual Reality. Proceedings of the 1st International Conference on Electrical, Communication, and Computer Engineering ICECCE 2019, Swat, Pakistan.
10.1109/ICECCE47252.2019.8940805 ↗5. Evolution of close-range detection and data acquisition technologies towards automation in construction progress monitoring
10.1016/j.jobe.2021.102877 ↗7. Critical Success Factors to Implementing Building Information Modeling in Malaysia Construction Industry
8. Critical success factors for implementing building information modeling and sustainability practices in construction projects: A Delphi survey
10.1002/sd.1925 ↗9. Construction Project Quality Management using Building Information Modeling 360 Field
10. Client Governing Success Criteria in Building Information Modelling (Bim)-Based Projects
14. Maqsoom, A., Aslam, B., Ismail, S., Thaheem, M.J., Ullah, F., Zahoor, H., Musarat, M.A., and Vatin, N.I. (2021). Assessing Rainwater Harvesting Potential in Urban Areas: A Building Information Modelling (BIM) Approach. Sustainability, 13.
10.3390/su132212583 ↗15. An overview of the Necessities, Challenges & Outcomes of Building Information Modeling (BIM) Framework used in Project Management
16. Edirisinghe, R., Pablo, Z., Anumba, C., and Tereno, S. (2021). An Actor–Network Approach to Developing a Life Cycle BIM Maturity Model (LCBMM). Sustainability, 13.
10.3390/su132313273 ↗17. Project Change Management Using Building Information Modeling 360 Docs
19. Acceptance of Building Information Modelling: A Survey of Professionals in the Construction Industry in Ghana
20. Durdyev, S., Mbachu, J., Thurnell, D., Zhao, L., and Hosseini, M.R. (2021). BIM Adoption in the Cambodian Construction Industry: Key Drivers and Barriers. ISPRS Int. J. Geo-Inform., 10.
10.3390/ijgi10040215 ↗21. Al-Ashmori, Y.Y., Othman, I., and Al-Aidrous, A.-H.M.H. (2022). “Values, Challenges, and Critical Success Factors” of Building Information Modelling (BIM) in Malaysia: Experts Perspective. Sustainability, 14.
10.3390/su14063192 ↗22. A lean approach to optimize BIM information flow using value stream mapping
23. Olanrewaju, O.I., Kineber, A.F., Chileshe, N., and Edwards, D.J. (2021). Modelling the Impact of Building Information Modelling (BIM) Implementation Drivers and Awareness on Project Lifecycle. Sustainability, 13.
10.3390/su13168887 ↗24. Alomari, K., Gambatese, J., and Anderson, J. (2017). Opportunities for Using Building Information Modeling to Improve Worker Safety Performance. Safety, 3.
10.3390/safety3010007 ↗25. Modelling the relationship between Building Information Modelling (BIM) implementation barriers, usage and awareness on building project lifecycle
10.1016/j.buildenv.2021.108556 ↗26. Elghaish, F., Hosseini, M.R., Talebi, S., Abrishami, S., Martek, I., and Kagioglou, M. (2020). Factors Driving Success of Cost Management Practices in Integrated Project Delivery (IPD). Sustainability, 12.
10.3390/su12229539 ↗27. Exploring the Influence Ofrisks in Bim Implementation: A Review Exploring Bim Criticalsuccess Factors and Bimimplementation Phases
28. Exploring behavioural factors for information sharing in BIM projects in the Malaysian construction industry
10.1108/BEPAM-02-2018-0042 ↗32. Critical success factors for adopting building information modelling (BIM) and lean construction practices on construction mega-projects: A Delphi survey
33. Critical BIM qualification criteria for construction pre-qualification and selection
34. Critical Success Factors and a Contractual Framework for Construction Projects Adopting Building Information Modeling in Vietnam
10.1007/s40999-020-00542-3 ↗36. BIM Adoption and Its Impact on Planning and Scheduling Influencing Mega Plan Projects- (CPEC-) Quantitative Approach
10.1155/2021/8818296 ↗39. Waqar, A., Qureshi, A.H., and Alaloul, W.S. (2023). Barriers to Building Information Modeling (BIM) Deployment in Small Construction Projects: Malaysian Construction Industry. Sustainability, 15.
10.3390/su15032477 ↗40. Benefits of Implementing Building Information Modeling (BIM) in Infrastructure Projects
41. Adoption of building information modeling in Chinese construction industry: The Technology-Organization-Environment Framework
10.1108/ECAM-11-2017-0246 ↗43. A Review of Risks for Bim Adoption in Malaysia Construction Industries: Multi Case Study
44. Simulation of Construction Sequence Using BIM 4D Techniques
45. Giel, B., Issa, R.R.A., and Olbina, S. (2009). Return on Investment Analysis of Building Information Modeling in Construction. [Ph.D. Thesis, University of Florida].
46. Waqar, A., Othman, I., Almujibah, H., Khan, M.B., Alotaibi, S., and Elhassan, A.A.M. (2023). Factors Influencing Adoption of Digital Twin Advanced Technologies for Smart City Development: Evidence from Malaysia. Buildings, 13.
10.3390/buildings13030775 ↗48. Towards Construction 4.0: Empowering Bim Skilled Talents in Malaysia
49. Waqar, A., and Khan, M. (2023). Assessment of Challenges to the Adoption of IOT for the Safety Management of Small Construction Projects in Malaysia: Structural Equation Modeling Approach. Appl. Sci., 13.
10.3390/app13053340 ↗50. Kim, J., Lee, S., Seo, J., Lee, D.-E., and Choi, H.S. (2021). The Integration of Earthwork Design Review and Planning Using UAV-Based Point Cloud and BIM. Appl. Sci., 11.
10.3390/app11083435 ↗51. The importance of BIM capability assessment: An Evaluation of Post-Selection Performance of Organisations on Construction Projects
10.1108/ECAM-09-2018-0357 ↗53. The Development of Safety Plan Using Work Breakdown Structure (WBS) for Building Information Modeling (BIM)-Based Building Structure Work
10.1166/jctn.2020.8818 ↗54. Reducing the Operational Energy Consumption in Buildings by Passive Cooling Techniques using Building Information Modelling Tools
56. Waqar, A., Skrzypkowski, K., Almujibah, H., Zagórski, K., Khan, M.B., Zagórska, A., and Benjeddou, O. (2023). Success of Implementing Cloud Computing for Smart Development in Small Construction Projects. Appl. Sci., 13.
10.3390/app13095713 ↗57. Project cost control using five dimensions building information modelling
58. Key Success Factors: Application 6D BIM to Reduce Initial Cost, Operational Cost & Maintenance Cost in Project Facade High-rise Office using RII Method
10.52403/ijrr.20211159 ↗60. Integration of the BIM execution plan with the guide to the project management body of knowledge (PMBOK®) of PMI (Project Management Institute) = Integración del plan de ejecución BIM con la guía para la dirección de proyectos (PMBOK®) de PMI (Project Management Institute)
61. Confirmatory Strategic Information Technology Implementation for Building Information Modelling Adoption Model
62. Manzoor, B., Othman, I., Gardezi, S.S.S., Altan, H., and Abdalla, S.B. (2021). BIM-Based Research Framework for Sustainable Building Projects: A Strategy for Mitigating BIM Implementation Barriers. Appl. Sci., 11.
10.3390/app11125397 ↗63. Building Information Modelling (BIM) Stage 2 Implementation Strategy for the Construction Industry in Malaysia
66. Technology acceptance model for Augmented Reality and Building Information Modeling integration in the construction industry
67. Integrating Building Information Modelling (BIM) and Sustainability to Greening Existing Building: Potentials in Malaysian Construction Industry
68. The Awareness of Building Information Modeling in Malaysia Construction Industry from Contractor Perspective
69. Implementation of Building Information Modeling (BIM) for Social Heritage Buildings in Kuala Lumpur
70. Waqar, A., Othman, I., Shafiq, N., Altan, H., and Ozarisoy, B. (2023). Modeling the Effect of Overcoming the Barriers to Passive Design Implementation on Project Sustainability Building Success: A Structural Equation Modeling Perspective. Sustainability, 15.
10.3390/su15118954 ↗71. Effect of volcanic pumice powder ash on the properties of cement concrete using response surface methodology
10.1007/s41024-023-00265-7 ↗72. Wijaya, T.T., Rahmadi, I.F., Chotimah, S., Jailani, J., and Wutsqa, D.U. (2022). A Case Study of Factors That Affect Secondary School Mathematics Achievement: Teacher-Parent Support, Stress Levels, and Students’ Well-Being. Int. J. Environ. Res. Public Health, 19.
10.3390/ijerph192316247 ↗73. A Review of Employer-Caused Delay Factors in Traditional and Building Information Modeling (BIM)-Enabled Projects: Research Framework
10.1155/2021/6696203 ↗