Constraints Hindering the Development of High-Rise Modular Buildings

Yanhui Sun, Jun Wang, Jeremy Wu, Weixiang Shi, Dazhi Ji, Xiangyu Wang, Xianzhong Zhao

Applied Sciences· Volume 10· Issue 20

Abstract

Off-site construction has been increasingly employed due to its advantages, for instance, improved quality control, reduced skills labour, faster construction time, decreased material wastage and safe working environment. As the most cutting-edge off-site construction, modular buildings have been utilised for residential building, student accommodation, and hotel projects. However, because of existing and underlying constraints, the adoption of modular buildings is still relatively low. To reveal factors hindering the development of high-rise modular buildings, a comprehensive literature review, coupled with a focus group study, were conducted. A questionnaire survey inquiring about all stakeholders was implemented to quantify constraints. The results were further examined according to a real-life case study. This paper manifested that “Lack of coordination and communication among stakeholders”, “Higher cost”, “Lack of government support”, “Lack of experience and expertise”, “Lack of building codes and standards”, “Poor supply chain integration”, and “Complexity of connection” are the top barriers curbing the uptake of modular buildings. The findings should provide a valuable reference for stakeholders adopting modular buildings, whilst mitigating risks amid modular construction. Future research is expected to exploit building information modelling and design for manufacture and assembly to alleviate these existing constraints and promote the performance of modular construction as well.
Source: crossref · Quality: baseline

Research context

OpenAlex topics: BIM and Construction Integration · Construction Project Management and Performance · Facilities and Workplace Management

SciVX discovery tags are terminology-based. OpenAlex topics are source-provided classifications.

Affiliations

School of Design and Built Environment, Curtin University, Perth, WA 6102, Australia

School of Architecture and Built Environment, Deakin University, Melbourne, VIC 3220, Australia

College of Civil Engineering, Tongji University, Shanghai 200092, China

Australasian Joint Research Centre for Building Information Modelling, Curtin University, Perth, WA 6102, Australia

Funding

Australian Research Council (ARC) Training Centre for Advanced Manufacturing of Prefabricated Housing

References (89)

Show source-provided references
1. Benefit evaluation for off-site production in construction10.1080/01446190500184444 ↗
2. Re-engineering through pre-assembly: Client expectations and drivers10.1080/09613210302000 ↗
3. Leading UK housebuilders’ utilization of offsite construction methods10.1080/09613210701204013 ↗
4. Future opportunities for offsite in the UK10.1080/01446190601071821 ↗
5. Industrialized Housing in China: A Coin with Two Sides10.3846/1648715X.2011.638945 ↗
6. Ibs Survey 2010: Drivers, barriers and critical success factors in adopting industrialised building system (Ibs) Construction by G7 contractors in Malaysia
7. Adoption of prefabricated housing-the role of country context10.1016/j.scs.2016.02.008 ↗
8. Best practice of prefabrication implementation in the Hong Kong public and private sectors10.1016/j.jclepro.2014.09.045 ↗
9. Hampson, K., and Brandon, P. (2004). Construction 2020: A Vision for Australia’s Property and Construction Industry, Cooperative Research Centre for Construction Innovation.
10. Gibb, A. (1999). Offsite Fabrication: Pre-Assembly, Prefabrication and Modularisation, Whittles Publishing Services.
11. New advancements, challenges and opportunities of multi-storey modular buildings—A state-of-the-art review10.1016/j.engstruct.2019.01.061 ↗
12. Effects of Lean Construction on Sustainability of Modular Homebuilding10.1061/(ASCE)AE.1943-5568.0000054 ↗
13. Murray-Parkes, J., and Bai, Y. (2017). Handbook for the Design of Modular Structures, Monash University.
14. Modular buildings in modern construction10.1016/j.proeng.2016.08.098 ↗
15. Global Academy, London: How offsite modular construction is reshaping education
16. Hospital wards and modular construction: Summertime overheating and energy efficiency10.1016/j.buildenv.2018.05.041 ↗
17. Design and compilation of specifications for a modular-prefabricated high-rise steel frame structure with diagonal braces. Part I: Integral structural design
18. Modular design for high-rise buildings10.1680/stbu.2010.163.3.151 ↗
19. Application of Modular Construction in High-Rise Buildings10.1061/(ASCE)AE.1943-5568.0000057 ↗
20. Life cycle performance of modular buildings: A critical review10.1016/j.rser.2016.05.031 ↗
21. Boafo, F.E., Kim, J.H., and Kim, J.T. (2016). Performance of Modular Prefabricated Architecture: Case Study-Based Review and Future Pathways. Sustainability, 8.10.3390/su8060558 ↗
22. A critical review of the use of 3-D printing in the construction industry10.1016/j.autcon.2016.04.005 ↗
23. A critical review of virtual and augmented reality (VR/AR) applications in construction safety10.1016/j.autcon.2017.11.003 ↗
24. Ho, K.M., Lam, J.P., and Max, S. (2018). Pre-Fabricated Pre-Finished Volumetric Construction (PPVC) for Residential Projects, Threesixty Cost Management Pte Ltd.
25. Offsite construction: Developing a BIM-Based optimizer for assembly10.1016/j.jclepro.2019.01.113 ↗
26. Chen, K., and Lu, W. (2018). Design for Manufacture and Assembly Oriented Design Approach to a Curtain Wall System: A Case Study of a Commercial Building in Wuhan, China. Sustainability, 10.10.3390/su10072211 ↗
27. A BIM-based approach for DfMA in building construction: Framework and first results on an Italian case study
28. Sustainability perceptions of off-site manufacturing stakeholders in Australia10.1016/j.jclepro.2019.03.258 ↗
29. Integration of BIM and GIS: IFC geometry transformation to shapefile using enhanced open-source approach10.1016/j.autcon.2019.102859 ↗
30. Gan, Y., Shen, L., Chen, J., Tam, V., Tan, Y., and Illankoon, I. (2017). Critical Factors Affecting the Quality of Industrialized Building System Projects in China. Sustainability, 9.10.3390/su9020216 ↗
31. Key constraints and mitigation strategies for prefabricated prefinished volumetric construction10.1016/j.jclepro.2018.02.136 ↗
32. Risk factors affecting practitioners’ attitudes toward the implementation of an industrialized building system A case study from China10.1108/ECAM-04-2014-0048 ↗
33. Factors impeding the offsite production of housing construction in China: An investigation of current practice10.1080/01446193.2013.787491 ↗
34. Cost analysis for sustainable off-site construction based on a multiple-case study in China10.1016/j.habitatint.2016.08.002 ↗
35. A SWOT analysis for promoting off-site construction under the backdrop of China’s new urbanisation10.1016/j.jclepro.2017.06.147 ↗
36. Overcoming barriers to off-site construction through engaging stakeholders: A two-mode social network analysis10.1016/j.jclepro.2018.07.299 ↗
37. Major Barriers to Off-Site Construction: The Developer’s Perspective in China10.1061/(ASCE)ME.1943-5479.0000246 ↗
38. Xu, Z., Zayed, T., and Niu, Y. (2020). Comparative analysis of modular construction practices in mainland China, Hong Kong and Singapore. J. Clean. Prod., 245.10.1016/j.jclepro.2019.118861 ↗
39. Zhu, J., Wu, P., Chen, M., Kim, M.J., Wang, X., and Fang, T. (2020). Automatically Processing IFC Clipping Representation for BIM and GIS Integration at the Process Level. Appl. Sci., 10.10.3390/app10062009 ↗
40. Drivers, constraints and the future of offsite manufacture in Australia10.1108/14714170910931552 ↗
41. Perspectives of UK housebuilders on the use of offsite modern methods of construction10.1080/01446190600827058 ↗
42. Design issues of using prefabrication in Hong Kong building construction10.1080/01446193.2010.498481 ↗
43. Exploring the challenges to industrialized residential building in China10.1016/j.habitatint.2013.08.005 ↗
44. Abdul, S.K. (2005). Barriers and Opportunities for Offsite in the UK. Systematic Innovation in the Management of Projects and Processes, Cib Helsinki International Joint Symposium, Technical Research Centre of Finland (VTT)/Association of Finnish Civil Engineers (RIL).
45. Opportunities and challenges of modular methods in dense urban environment
46. Barriers to promoting prefabricated construction in China: A cost-benefit analysis10.1016/j.jclepro.2017.10.171 ↗
47. Investigating waste reduction potential in the upstream processes of offshore prefabrication construction10.1016/j.rser.2013.08.048 ↗
48. Modularization Technology Development Prospects10.4028/www.scientific.net/AMM.509.92 ↗
49. Navaratnam, S., Ngo, T., Gunawardena, T., and Henderson, D. (2019). Performance review of prefabricated building systems and future research in Australia. Buildings, 9.10.3390/buildings9020038 ↗
50. Liu, Z., Gu, Z., Bai, Y., and Zhong, N. (2018). Intermodal transportation of modular structure units. World Rev. Intermodal Transp. Res., 7.10.1504/WRITR.2018.091245 ↗
51. Near optimum selection of module configuration for efficient modular construction10.1016/j.autcon.2017.03.008 ↗
52. An Investigation of Critical Factors and Constraints for Selecting Modular Construction over Conventional Stick-Built Technique
53. Knowledge-based decision support system for prefabricated prefinished volumetric construction10.1016/j.autcon.2018.06.016 ↗
54. Wuni, I.Y., Shen, G.Q.P., and Mahmud, A.T. (2019). Critical risk factors in the application of modular integrated construction: A systematic review. Int. J. Constr. Manag.10.1080/15623599.2019.1613212 ↗
55. Prefabricated Prefinished Volumetric Construction: Key Constraints and Mitigation Strategies
56. Construction policymaking: With an example of singaporean government’s policy to diffuse prefabrication to private sector10.1007/s12205-011-1243-4 ↗
57. Towards adoption of prefabrication in construction10.1016/j.buildenv.2006.10.003 ↗
58. Prefabrication and barriers to entry—A case study of public housing and institutional buildings in Hong Kong10.1016/j.habitatint.2004.12.004 ↗
59. Kamar, K., Alshawi, M., and Hamid, Z. (2009, January 30). Barriers to industrialized building system (IBS): The case of Malaysia. Proceedings of the BuHu 9th International Postgraduate Research Conference (IPGRC), Salford, UK.
60. Constraints to the Use of Off-site Production on Construction Projects
61. Factors affecting the use of precast concrete systems in the United States10.1061/(ASCE)0733-9364(2008)134:3(169) ↗
62. Wang, Z.L., Shen, H.C., and Zuo, J. (2019). Risks in Prefabricated Buildings in China: Importance-Performance Analysis Approach. Sustainability, 11.10.3390/su11123450 ↗
63. Schedule risks in prefabrication housing production in Hong Kong: A social network analysis10.1016/j.jclepro.2016.02.123 ↗
64. Blismas, N. (2007). Off-Site Manufacture in Australia: Current State and Future Directions, Cooperative Research Centre for Construction Innovation.
65. Behaviour of Multi-Storey Prefabricated Modular Buildings under seismic loads10.12989/eas.2016.11.6.1061 ↗
66. Improved fire resistant performance of load bearing cold-formed steel interior and exterior wall systems10.1016/j.tws.2013.07.017 ↗
67. Blast resistant modular buildings for the petroleum and chemical processing industries10.1016/S0304-3894(03)00232-2 ↗
68. Jiang, L., Li, Z., Long, L., and Gao, Y. (2018). Constraints on the Promotion of Prefabricated Construction in China. Sustainability, 10.10.3390/su10072516 ↗
69. Barriers of Implementing Modern Methods of Construction10.1061/(ASCE)ME.1943-5479.0000173 ↗
70. Morgan, D.L. (1997). Focus Groups as Qualitative Research, SAGE. [2nd ed.].10.4135/9781412984287 ↗
71. Focus-group interview and data analysis10.1079/PNS2004399 ↗
72. Luo, L., Qiping Shen, G., Xu, G., Liu, Y., and Wang, Y. (2019). Stakeholder-Associated Supply Chain Risks and Their Interactions in a Prefabricated Building Project in Hong Kong. J. Manag. Eng., 35.10.1061/(ASCE)ME.1943-5479.0000675 ↗
73. Yin, R.K. (2014). Case Study Research: Design and Methods, SAGE. [5th ed.].
74. CAMPH (2020, September 20). ARC Centre for Advanced Manufacturing of Prefabricated Housing. Available online: Camph.eng.unimelb.edu.au/.
75. Sampling Knowledge: The Hermeneutics of Snowball Sampling in Qualitative Research10.1080/13645570701401305 ↗
76. George, D., and Mallery, P. (2006). SPSS for Windows Step by Step: A Simple Guide and Reference, Pearson Education A and B. [6th ed.].
77. Demystifying the cost barriers to offsite construction in the UK10.1080/01446193.2011.637938 ↗
78. Simulation based multiple disturbances evaluation in the precast supply chain for improved disturbance prevention10.1016/j.jclepro.2017.12.188 ↗
79. Design for Manufacture and Assembly-oriented parametric design of prefabricated buildings10.1016/j.autcon.2017.12.021 ↗
80. A BIM-based automation of design and drafting for manufacturing of wood panels for modular residential buildings
81. A theoretical framework of a BIM-based multi-disciplinary collaboration platform10.1016/j.autcon.2010.09.011 ↗
82. Engagement of Facilities Management in Design Stage through BIM: Framework and a Case Study
83. Understanding Stakeholders in Off-Site Manufacturing: A Literature Review10.1061/(ASCE)CO.1943-7862.0001674 ↗
84. RIBA (2013). Designing for Manufacture and Assembly, Royal Institute of British Architects.
85. BCA (2017). Design for Manufacturing and Assembly (DfMA) Prefabricated Prefinished Volumetric Construction.
86. Lu, W., Tan, T., Xu, J., Wang, J., Chen, K., Gao, S., and Xue, F. (2020). Design for manufacture and assembly (DfMA) in construction: The old and the new. Archit. Eng. Des. Manag., 1–15.10.1080/17452007.2020.1768505 ↗
87. The future of DFMA is the future of construction
88. Enhancing high-rise residential construction through design for manufacture and assembly—A UK case study
89. Balfour, B. (2018). Streamlined Construction: Seven Steps to Offsite and Modular Building, Balfour Beatty.