journal article·2021-06-25Open access

Digital Twin for Supply Chain Coordination in Modular Construction

Dongmin Lee, SangHyun Lee

Applied Sciences· Volume 11· Issue 13

Abstract

Over the past decades, the construction industry has been attracted to modular construction because of its benefits for reduced project scheduling and costs. However, schedule deviation risks in the logistics process of modular construction can derail its benefits and thus interfere with its widespread application. To address this issue, we aim to develop a digital twin framework for real-time logistics simulation, which can predict potential logistics risks and accurate module arrival time. The digital twin, a virtual replica of the physical module, updates its virtual asset based on building information modeling (BIM) in near real-time using internet of thing (IoT) sensors. Then, the virtual asset is transferred and exploited for logistics simulation in a geographic information system (GIS)-based routing application. We tested this framework in a case project where modules are manufactured at a factory, delivered to the site via a truck, and assembled onsite. The results show that potential logistical risks and accurate module arrival time can be detected via the suggested digital twin framework. This paper’s primary contribution is the development of a framework that mediates IoT, BIM, and GIS for reliable simulation which predicts potential logistics risks and accurate module delivery time. Such reliable risk prediction enables effective supply chain coordination, which can improve project performance and the widespread application of modular construction.
Source: crossref · Quality: baseline

Research context

OpenAlex topics: BIM and Construction Integration · Digital Transformation in Industry · Innovations in Concrete and Construction Materials

SciVX discovery tags are terminology-based. OpenAlex topics are source-provided classifications.

Affiliations

Tishman Construction Management Program, Department of Civil and Environmental Engineering, University of Michigan, 2350 Hayward St., G.G. Brown Bldg., Ann Arbor, MI 48109, USA

Funding

UM MCubed

References (47)

Show source-provided references
1. Bertram, N., Fuchs, S., Mischke, J., Palter, R., Strube, G., and Woetzel, J. (2019). Modular construction: From projects to products. Capital Projects & Infrastructure, McKinsey & Company. Available online: https://www.mckinsey.com/industries/capital-projects-and-infrastructure/our-insights/modular-construction-from-projects-to-products.
2. Velamati, S. (2012). Feasibility, Benefits and Challenges of Modular Construction in High Rise Development in the United States: A Developer’s Perspective. [Ph.D. Thesis, Massachusetts Institute of Technology].
3. Critical success factors for modular integrated construction projects: A review10.1080/09613218.2019.1669009 ↗
4. A study of literature in modular integrated construction—Critical review and future directions10.1016/j.jclepro.2020.124044 ↗
5. Risk-averse supply chain for modular construction projects10.1016/j.autcon.2019.102898 ↗
6. Niu, S., Yang, Y., and Pan, W. (2019). Logistics Planning and Visualization of Modular Integrated Construction Projects Based on BIM-GIS Integration and Vehicle Routing Algorithm. Modul. Offsite Constr. Summit Proc., 579–586.10.29173/mocs141 ↗
7. Opportunities and challenges of modular methods in dense urban environment
8. A digital supply chain twin for managing the disruption risks and resilience in the era of Industry 4.010.1080/09537287.2020.1768450 ↗
9. Park, K.T., Son, Y.H., and Do Noh, S. (2020). The architectural framework of a cyber physical logistics system for digital-twin-based supply chain control. Int. J. Prod. Res., 1–22.
10. Integrating the Digital Twin of the manufacturing system into a decision support system for improving the order management process10.1016/j.procir.2018.03.192 ↗
11. Integrated digital twin and blockchain framework to support accountable information sharing in construction projects10.1016/j.autcon.2021.103688 ↗
12. Digital Twin as Enabler for an Innovative Digital Shopfloor Management System in the ESB Logistics Learning Factory at Reutlingen—University10.1016/j.promfg.2017.04.039 ↗
13. Digital twin-based smart production management and control framework for the complex product assembly shop-floor10.1007/s00170-018-1617-6 ↗
14. Digital twin shop-floor: A new shop-floor paradigm towards smart manufacturing10.1109/ACCESS.2017.2756069 ↗
15. Korth, B., Schwede, C., and Zajac, M. (2018, January 10–13). Simulation-ready digital twin for realtime management of logistics systems. Proceedings of the 2018 IEEE International Conference on Big Data (Big Data), Seattle, WA, USA.10.1109/BigData.2018.8622160 ↗
16. Haße, H. (2019, January 25–27). Digital Twin for Real-Time Data Processing in Logistics. Proceedings of the Hamburg International Conference of Logistics (HICL) 27, Hamburg, Germany. Available online: http://hdl.handle.net/10419/209367.
17. Requirements for BIM platforms in the concrete reinforcement supply chain10.1016/j.autcon.2013.01.013 ↗
18. Magill, L.J., Jafarifar, N., Watson, A., and Omotayo, T. (2020). 4D BIM integrated construction supply chain logistics to optimise on-site production. Int. J. Constr. Manag., 1–10.10.1080/15623599.2020.1786623 ↗
19. Lu, W., Olofsson, T., Jensen, P., and Simonsson, P. (2011). BIM-based lean-agile supply chain for industrialized housing. International Conference on Construction Applications of Virtual Reality: 3–4 November 2011, Bauhaus-Universität Weimar.
20. Nissilä, J., Heikkilä, R., Romo, I., Malaska, M., and Aho, T. (2014, January 9–11). BIM based schedule control for precast concrete supply chain. Proceedings of the 31st International Symposium on Automation and Robotics in Construction and Mining (ISARC), Sydney Australia.10.22260/ISARC2014/0089 ↗
21. A BIM-based Construction Supply Chain Framework for Monitoring Progress and Coordination of Site Activities10.1016/j.proeng.2016.11.656 ↗
22. Ocheoha, I.A., and Moselhi, O. (2018). A BIM-based supply chain integration for prefabrication and modularization. Modul. Offsite Constr. Summit Proc., 16–23.10.29173/mocs35 ↗
23. Fitriawijaya, A., Hsin-Hsuan, T., and Taysheng, J. (2019, January 15–18). A blockchain approach to supply chain management in a BIM-enabled environment. Proceedings of the 24th CAADRIA Conference, Wellington, New Zealand.10.52842/conf.caadria.2019.2.411 ↗
24. Integrating BIM and GIS to improve the visual monitoring of construction supply chain management10.1016/j.autcon.2012.12.005 ↗
25. Wang, T.K., Zhang, Q., Chong, H.Y., and Wang, X. (2017). Integrated supplier selection framework in a resilient construction supply chain: An approach via analytic hierarchy process (AHP) and grey relational analysis (GRA). Sustainability, 9.10.3390/su9020289 ↗
26. Risks of modular integrated construction: A review and future research directions10.1007/s42524-019-0059-7 ↗
27. Glaessgen, E., and Stargel, D. (2012, January 23–26). The digital twin paradigm for future NASA and US Air Force vehicles. Proceedings of the 53rd AIAA/ASME/ASCE/AHS/ASC Structures, Structural Dynamics and Materials Conference, Honolulu, HI, USA.10.2514/6.2012-1818 ↗
28. Digital twin driven human–robot collaborative assembly10.1016/j.cirp.2019.04.011 ↗
29. Health monitoring and prognosis of electric vehicle motor using intelligent-digital twin10.1049/iet-epa.2018.5732 ↗
30. Domingue, J., Fensel, D., and Traverso, P. (2009). The Internet of Things in an Enterprise Context BT—Future Internet—FIS 2008, Springer.10.1007/978-3-642-00985-3 ↗
31. Internet of things-IOT: Definition, characteristics, architecture, enabling technologies, application & future challenges
32. Application of integrated GPS and GIS technology for reducing construction waste and improving construction efficiency10.1016/j.autcon.2004.08.007 ↗
33. Image-based construction hazard avoidance system using augmented reality in wearable device10.1016/j.autcon.2017.06.014 ↗
34. Robot-aided tunnel inspection and maintenance system by vision and proximity sensor integration10.1016/j.autcon.2010.12.005 ↗
35. Scenarios for applying RFID technology in construction project management10.1016/j.autcon.2010.09.007 ↗
36. Analysis of construction trade worker body motions using a wearable and wireless motion sensor network10.1016/j.autcon.2017.08.001 ↗
37. Wearable Biosensor and Hotspot Analysis–Based Framework to Detect Stress Hotspots for Advancing Elderly’s Mobility10.1061/(ASCE)ME.1943-5479.0000753 ↗
38. Towards a semantic Construction Digital Twin: Directions for future research10.1016/j.autcon.2020.103179 ↗
39. The limits of GIS: Towards a GIS of place10.1111/tgis.12342 ↗
40. Shirowzhan, S., Tan, W., and Sepasgozar, S.M.E. (2020). Digital Twin and CyberGIS for Improving Connectivity and Measuring the Impact of Infrastructure Construction Planning in Smart Cities. ISPRS Int. J. Geo-Inf., 9.10.3390/ijgi9040240 ↗
41. Digital Twin for Sustainability Evaluation of Railway Station Buildings10.3389/fbuil.2018.00077 ↗
42. Ding, K., Shi, H., Hui, J., Liu, Y., Zhu, B., Zhang, F., and Cao, W. (2018, January 27–29). Smart steel bridge construction enabled by BIM and Internet of Things in industry 4.0: A framework. Proceedings of the 2018 IEEE 15th International Conference on Networking, Sensing and Control (ICNSC), Zhuhai, China.10.1109/ICNSC.2018.8361339 ↗
43. Digital twin-based collapse fragility assessment of a long-span cable-stayed bridge under strong earthquakes10.1016/j.autcon.2020.103547 ↗
44. Digital twin-enabled anomaly detection for built asset monitoring in operation and maintenance10.1016/j.autcon.2020.103277 ↗
45. (2021, June 13). Calculate a Route—Bing Maps|Microsoft Docs. Available online: https://docs.microsoft.com/en-us/bingmaps/rest-services/routes/calculate-a-route.
46. (2021, June 13). Unity-Technologies/Unity-Simulation-Docs. Available online: https://github.com/Unity-Technologies/Unity-Simulation-Docs.
47. (2021, April 30). Cubix at Othello|Case Study|Metric Modular. Available online: https://metricmodular.com/case-study/cubixatothello/.