The structural integrity management of a deaerator feed water vessel approaching the end-of-life condition
Source abstract
Abstract
Abstract The present paper describes the integrity management of a deaerator feedwater vessel over a 20-month service period within which it approached the end-of-life condition. A series of four remnant life assessments were carried out using both Crackwise and the R6 failure assessment programmes which determined critical crack sizes for vessel failure and a leak-before-break event. Interestingly, actual crack growth data obtained from this particular feedwater vessel over a 12 year service period was used in the sub-critical crack growth rate assessments. Remnant life values were reduced from only 25% of the normal guideline period of two years to re-inspect repaired weld cracks to around 12% or only three months within a 30-month service period. Also at each inspection a large amount of cracks, which numbered over one hundred, were found. From this it was clear that the vessel was approaching an end of life condition and the final assessment deemed that the vessel should be removed from service and all the problematic weld runs be replaced with new welds.
Source: openaire · Quality: candidate unverified · Source record ↗
Research context
OpenAlex topics: Mechanical Failure Analysis and Simulation · Structural Integrity and Reliability Analysis · Oil and Gas Production Techniques
SciVX discovery tags are terminology-based. OpenAlex topics are source-provided classifications.
References (16)
Show source-provided references
1. Case histories of deaerator failure analysis
2. Re-inspection of deaerator welds is the key to continued safe operation
3. TAPPI, Engineering Division Issues Deaerator Advisory. Tappi J 1987;66:l–15
4. Twigg · Maters Perform · 1996 · 39
5. Understanding and eliminating crack extension behavior in feedwater deaerator systems10.1016/0308-0161(93)90100-8 ↗
6. Fractographic details of crack extension in deaerator feedwater vessel welds10.1016/0308-0161(95)00042-9 ↗
7. Deaerator feedwater vessel weld cracking monitored over a service time of around 80,000 h10.1016/S0308-0161(03)00135-2 ↗
8. Charras T, Jamet P, Bhandari S, Taupin P. Application of the Leak-Before-Break Concept on a 4-Loop PWR. In: Transactions of the ninth international conference of structural mechanics in reactor technology, vol. G. Lausanne (Switzerland); August 1987. p. 261–8
9. Fracture toughness of some mild steel manual metal-arc weld deposits
10. Design, service conditions and deaerator cracking in dutch utility boilers
11. Jonas O. Remaining life and NDT interval for carbon steel deaerator tanks. In: Proceedings of the American power conference. Chicago (USA); August 1985. p. 228–33
12. Bulloch JH. Some field observations involving deaerator feedwater vessel cracking. In: Proceedings of the international conference on life extension in thermal power plant, vol. 3. Moscow (Russia); May 1994. p. 1026–37
13. Shape change of surface cracks during fatigue crack growth
14. Gooch TG, Noble DN, Walker RA. Cracking of weldments in feedwater deaerator systems. In: Proceedings of the 12th international corrosion congress on corrosion control for low cost reliability, vol. 2. NACE, Houston (USA); September 1993. p. 1076–90
15. Spiedel MO, Magdowski RM. Stress corrosion cracking in steam turbines. In: Proceedings of the corrosion 86. NACE, Houston (USA). p. 128–34
16. The use of constant probability fatigue curves in predicting deaerator vessel failure10.1016/S0308-0161(01)00048-5 ↗