Influence Mechanisms of Earth Pressure Balance Shield Tunneling Parameters on Chamber Pressure and Surface Settlement: A Theoretical and FDM-DEM Coupled Analysis
Source abstract
Abstract
In earth pressure balance (EPB) shield tunneling, chamber pressure control is essential for maintaining excavation-face stability and limiting surface settlement. However, the influence mechanisms of key tunneling parameters on chamber pressure and ground response remain difficult to clarify when soil conditioning, cutterhead squeezing, muck discharge, and ground deformation are considered together. To address this issue, this study establishes a theoretical mechanical model for EPB shield tunneling and develops a calibrated three-dimensional FDM–DEM coupled numerical model based on the Jinan Metro Line 6 project. Triaxial and slump tests were used to calibrate the macro–micro parameters of unconditioned and foam-conditioned soil. The effects of tunneling speed, cutterhead speed, and screw conveyor speed on chamber pressure distribution and surface settlement were then analyzed. The results show that tunneling speed mainly affects the overall chamber pressure and face-support condition, screw conveyor speed controls muck discharge and pressure release, and cutterhead speed influences the spatial distribution of chamber pressure and settlement response. This study provides a theoretical and numerical basis for understanding chamber pressure evolution and coordinating tunneling parameters in EPB shield construction.
Source: crossref · Quality: baseline
Affiliations
China Railway Liuyuan Group Co., Ltd., Tianjin 300308, China
School of Qilu Transportation, Shandong University, Jinan 250002, China
Funding
National Natural Science Foundation of China Youth Project · Shandong Provincial Natural Science Foundation Youth Fund Program · Science and Technology Research and Development Program of China Railway Group Limited
References (45)
Show source-provided references
1. Examining the Effect of Adverse Geological Conditions on Jamming of a Single Shielded TBM in Uluabat Tunnel Using Numerical Modeling10.1016/j.jrmge.2017.05.010 ↗
2. Wang, J., Li, L., Shi, S., Sun, S., Ba, X., and Zhang, Y. (2019). Fine Exploration and Control of Subway Crossing Karst Area. Appl. Sci., 9.10.3390/app9132588 ↗
3. Face Failure Analysis of a Shield Tunnel with Slurry Penetration into the Ground10.1016/j.tust.2022.104554 ↗
4. Yaman, H.E., and Aksoy, C.O. (2024). Evaluation of Symmetrical Face Pressure of EPB. Symmetry, 16.10.3390/sym16040484 ↗
5. Benardos, A., Anagnostou, G., and Marinos, V.P. (2023). Comparison of Two Identical EPB TBMs under Different and Complex Geological Conditions. Proceedings of the ITA-AITES World Tunnel Congress 2023, WTC 2023: Expanding Underground—Knowledge and Passion to Make a Positive Impact on the World, CRC Press-Balkema.10.1201/9781003348030 ↗
6. Stability Assessment of Surrounding Rock during Shield Tunneling through Karst Cavities Using Numerical and Physical Modeling10.1007/s10706-025-03419-1 ↗
7. Discussion of Cutterhead Opening Design for Earth Pressure Balance Machines (EPBMs) in Soft Grounds10.1680/jgeen.22.00254 ↗
8. Assessment of Reliability and Maintainability of Earth Pressure Balance Tunnel Boring Machine (EPBTBM)-an Approach10.1016/j.tust.2021.104337 ↗
9. Twin Earth Pressure Balance Tunnelling—Monitoring and Numerical Study of an Urban Case10.1680/jgeen.21.00165 ↗
10. A Novel Data-Driven Approach for Proactive Risk Assessment in Shield Tunnel Construction10.1016/j.trgeo.2024.101466 ↗
11. Experimental Study on Stress Distribution Characteristics of a Shield Tunnel under Passive Failure10.1016/j.engfailanal.2023.107725 ↗
12. Ren, H., Chen, J., Wang, H., He, Y., Fang, X., and Wang, L. (2025). Analysis of the Temporal and Spatial Evolution Behavior of Earth Pressure in the Shield Chamber and the Ground Settlement Behavior during Shield Tunneling in Water-Rich Sand Layers. Buildings, 15.10.3390/buildings15162935 ↗
13. Prediction of Earth Pressure Balance for EPB-TBM Using Machine Learning Algorithms10.1186/s40703-023-00198-7 ↗
14. Wang, W., Feng, H., Li, Y., You, Q., and Zhou, X. (2024). Research on Prediction of EPB Shield Tunneling Parameters Based on LGBM. Buildings, 14.10.3390/buildings14030820 ↗
15. A Multi-Fidelity Deep Operator Network (DeepONet) for Fusing Simulation and Monitoring Data: Application to Real-Time Settlement Prediction during Tunnel Construction10.1016/j.engappai.2024.108156 ↗
16. Gou, C., Luo, Y., Zhang, Y., Wang, X., Yu, H., and Zhang, Y. (2026). Chamber Pressure Prediction and Parameter Optimization for Earth Pressure Balance Shields Based on SSA-RF and PSO. Appl. Sci., 16.10.3390/app16136834 ↗
17. Gunduz, M., Naji, K.K., Mohamed, A., and Khan, O. (2026). Exploratory Data Analysis and Interpretable Machine Learning for Anomaly Detection in Epb Tunnel Boring Machine Operations. Front. Built Environ., 12.10.3389/fbuil.2026.1844340 ↗
18. Face Support, Soil Conditioning and Material Transport in Earth-Pressure-Balance and Hydro Shield Machines
19. Investigation on Optimal Soil Chamber Pressure Settings for EPB Shield Machines in Sandy Cobble Strata with Insights from Gravel Flow Characteristics10.1016/j.kscej.2025.100248 ↗
20. Modeling Excavation Chamber of EPB Tunnel Boring Machine by Discrete Element Method
21. Spatial Motion Patterns and Force Transmission Characteristics of Muck Particles in EPB Shield Tunneling: An FDM–DEM Coupling Analysis10.1016/j.undsp.2025.05.005 ↗
22. Wu, W., Leung, C.F., Zhou, Y., and Li, X. (2024). Laboratory Experiments on Rheological Properties of Foam-Conditioned Weathered Granite Soil. Proceedings of the 18th Conference of the Associated Research Centers for the Urban Underground Space, Springer Nature.
23. Research on Muck Conditioning for EPB Shield Tunnelling in Composite Formation10.1038/s41598-024-81757-5 ↗
24. Wang, L., Hu, J., Zhu, W., and Min, F. (2026). Effects of Conditioning Agents on the Undrained Shear Response and Pore-Scale Behavior of Sand for EPB Shield Tunneling. Appl. Sci., 16.10.3390/app16010531 ↗
25. Guo, H., Zhang, G., Wu, Z., and Wang, J. (2025). The Control of Shield Tunnel Construction-Induced Ground Settlement Based on an Optimized Gap Parameter Theory and Three-Dimensional Finite Element Analysis. Buildings, 15.10.3390/buildings15091578 ↗
26. Probabilistic Analysis of Ground Surface Settlement Induced by Super Large Diameter Shield Tunneling Based on 3D Random Finite Element Method10.1016/j.compgeo.2025.107111 ↗
27. Study on Long-Term Surface Settlement Induced by Shield Tunneling in under-Consolidated Soft Ground10.1016/j.tust.2024.105772 ↗
28. CFD-DEM Coupling Analysis of EPB Screw Conveyor Muck Discharge in Water-Rich Sandy Cobble Strata10.1038/s41598-026-41903-7 ↗
29. Coupled DEM-FDM Numerical Model for EPB Shield Tunnelling Simulation with Foam Conditioning10.1016/j.tust.2024.105718 ↗
30. Face Failure of Deep EPB Shield Tunnels in Dry Graded Cobble-Rich Soil: A DEM Study10.1016/j.tust.2024.105622 ↗
31. Model Test on Cutterhead-Soil Interaction during Shield Tunneling and Its Theoretical Model10.1016/j.undsp.2024.03.006 ↗
32. Yang, Z., Shao, X., Liu, Z., Bai, Z., and Jiang, Y. (2025). Optimization and Field Validation of Soil Conditioning Scheme for EPB Shield Tunneling in Cobble–Boulder Stratum: Case Study on Beijing Metro Line 16. Buildings, 15.10.3390/buildings15244429 ↗
33. Calibration Method of Mesoscopic Parameter in Sandy Cobble Soil Triaxial Test Based on PFC3D10.1007/s11709-023-0028-4 ↗
34. CFD-DEM Modeling of Seepage in Foam-Conditioned Soil10.1016/j.compgeo.2024.106818 ↗
35. Analysis of Ground Volume Loss for EPB Shield Tunneling in Thick Silty Clay Layer10.1016/j.aej.2024.03.083 ↗
36. Mechanism of Slag Discharge Failures in Earth Pressure Balance Shield Screw Conveyor: A Theoretical Model-Based Investigation10.1016/j.tust.2024.105997 ↗
37. Effect of Bentonite Slurry on Muck Discharge Performance of EPB Shield Screw Conveyor10.1016/j.tust.2026.107618 ↗
38. Load Model for Shield Tunneling in Composite Strata Considering Mud Build-up Effects10.1016/j.tust.2025.106918 ↗
39. An Experimental and Theoretical Research on Shield Screw Conveyor Discharging Efficiency in Moderately Weathered Mudstone Strata and Its Influence on Clogging10.1016/j.sandf.2025.101675 ↗
40. Enhanced Calibration of Discrete Element Models for Soil-Structure Interaction Problems10.1016/j.compgeo.2025.107539 ↗
41. Calibration of a DEM Contact Model for Wet Industrial Granular Materials10.1016/j.powtec.2026.122404 ↗
42. Use of Compact Shield Tunneling Method in Urban Underground Construction10.1016/j.tust.2003.11.008 ↗
43. Three-Dimensional Numerical Simulation Method for Shield Grouting Based on DEM-FDM Coupling and Inlet Module10.1016/j.tust.2025.106858 ↗
44. Finite-Discrete Element Numerical Modeling on Shield Tunnel Face Stability Undercrossing Existing Pipeline Considering Discontinuous Contact10.1038/s41598-025-18212-6 ↗
45. Yang, B., Zhang, S., Deng, Z., Su, N., Chen, S., and Zhu, D. (2025). Macro–Mesoscopic Analysis and Parameter Calibration of Rock–Soil Strength Degradation under Different Water Contents. Appl. Sci., 15.10.3390/app151810254 ↗