Test requirements for 42 V battery systems
Source abstract
Abstract
Abstract The introduction of the 42 V PowerNet imposes new performance requirements on the battery. The required performance parameters will vary dependent on the application and to what extent the power train is hybridised, with additional features such as start–stop, launch assist etc. This makes it more difficult to specify relevant laboratory test procedures. This paper reviews the vehicle electrical system developments and the impact these developments will have on the battery performance and testing requirements. Suitable test equipment from Digatron/Firing Circuits is discussed and reviewed.
Source: openaire · Quality: candidate unverified · Source record ↗
Research context
OpenAlex topics: Advanced Battery Technologies Research · Electric and Hybrid Vehicle Technologies · Real-time simulation and control systems
SciVX discovery tags are terminology-based. OpenAlex topics are source-provided classifications.
References (9)
Show source-provided references
1. Gunter Lugert, Siemens VDO Automotive AG, AABC02, Las Vegas, February 2002.
2. John Miller, Ford Motor Company, AABC01, Las Vegas, February 2001.
3. Batteries International, April 2001, p. 78.
4. Panasonic Battery Temperature Comparison, Panasonic Technical Data.
5. Jeffrey Zagrodnik, Johnson Controls Inc., AABC01, Las Vegas, February 2001.
6. Pat Moseley, Allan Cooper, in: Proceedings of the 7th ALABC Members and Contractors Conference, Marina Del Rey, California, March 2002.
7. Bob Nelson, in: Proceedings of the 7th ALABC Members and Contractors Conference, Marina Del Rey, California, March 2002.
8. Toshiyuki Sekimori, Toyota Motor Corporation, AABC02, Las Vegas, February 2002.
9. Digatron Firing Circuits article Simple and Sophisticated: Criteria for Choosing the Best in Battery Test Software.