Real-time erosion monitoring in ITER by means of speckle interferometry
Source abstract
Abstract
Abstract ITER will operate long time discharges (400 s) at high performances (Q = 10, where Q is the energy amplification factor) and will have to satisfy strong safety and operational limits in term of Tritium and dust inventory. This can be achieved only with the control of the plasma wall interactions and in particular control of the erosion of the Plasma Facing Components. Erosion monitoring diagnostic based on speckle interferometry and optical design for implementation in ITER are presented.
Source: openaire · Quality: candidate unverified · Source record ↗
Research context
OpenAlex topics: Magnetic confinement fusion research · Fusion materials and technologies · Laser-Plasma Interactions and Diagnostics
SciVX discovery tags are terminology-based. OpenAlex topics are source-provided classifications.
References (13)
Show source-provided references
1. ITER Project Requirements, 27ZRW8 (2009) 69.
2. Gauthier · J. Nucl. Mater. · 2003 · 313–316 · 70110.1016/S0022-3115(02)01448-4 ↗
3. Doré · J. Nucl. Mater. · 2007 · 363–365
4. Ghiglia · 1998
5. A. Costley, in: Proceedings of Conference on IAEA, Geneva, 2008.
6. K. Itami, in: Proceedings of 32nd EPS Conference on Plasma Physics, 2005.
7. Menon · Fusion Eng. Des. · 2001 · 58–59 · 49510.1016/S0920-3796(01)00247-2 ↗
8. Pitts · Nucl. Fusion · 2007 · 47 · 143710.1088/0029-5515/47/11/005 ↗
9. Gauthier · J. Nucl. Mater. · 2007 · 363–365 · 102610.1016/j.jnucmat.2007.01.262 ↗
10. Andrew · J. Nucl. Mater. · 2007 · 363–365 · 100610.1016/j.jnucmat.2007.01.285 ↗
11. Gauthier · Fusion Eng. Des. · 2007 · 82 · 133510.1016/j.fusengdes.2007.06.026 ↗
12. P. Andrew, Private Communication, 2009.
13. Marot · Rev. Sci. Instrum. · 2007 · 78 · 10350710.1063/1.2800779 ↗