journal article·2017-09

Replacement of the TPS bending chamber with an on-site cutting method

C.K. Chan, C.C. Chang, C. Shueh, I.C. Yang, L.H. Wu, C.M. Cheng, Y.T. Huang, J.Y. Chuang, Y.T. Cheng, Y.M. Hsiao, B.Y. Chen, Albert Sheng

Vacuum· Volume 143
Publisher page

Abstract

Abstract To minimize the impact on the machine downtime due to replacement of a TPS bending chamber, an on-site cutting method had been developed. This method can shorten the replacement time of a bending chamber from 50 to 4 days and avoid breaking the vacuum in the frond ends and adjacent insertion devices. We also developed a plug to prevent micro dust, generated from saw-cutting of the vacuum chamber, contaminating the beam duct. Three different preconditioning methods, including baking, prebaking and no-bake treatments, were applied to the newly installed arc-cell vacuum systems to evaluate their efficacy on reducing the photon stimulated desorption (PSD) in the vacuum chambers. The PSD data show no obvious discrepancy between these preconditioning methods.
Source: openaire · Quality: candidate unverified · Source record ↗

Research context

OpenAlex topics: Radiation Therapy and Dosimetry · Advanced Radiotherapy Techniques · Nuclear Physics and Applications

SciVX discovery tags are terminology-based. OpenAlex topics are source-provided classifications.

References (24)

Show source-provided references
1. Chang · Proc. IPAC’11 · 2011 · 3314
2. Chiu · Nucl. Instrum. Methods Phys. Res. A · 2016 · 826 · 4810.1016/j.nima.2016.04.030 ↗
3. Chiu · Proc. IPAC’16 · 2016 · 4054
4. Hsiung · Appl. Sci. Conv. Technol. · 2014 · 23 · 30910.5757/ASCT.2014.23.6.309 ↗
5. Chen · J. Vac. Sci. Technol. A · 2010 · 28 · 94210.1116/1.3305840 ↗
6. https://drive.google.com/file/d/0B9_1cAVgpdDTcUVUNzRYcUdnWHM/view?usp=sharing.
7. Chan · Nucl. Instrum. Methods Phys. Res. A · 2017 · 851 · 5710.1016/j.nima.2017.01.027 ↗
8. Yang · Proc. IPAC’15 · 2015 · 3222
9. https://medsi.lbl.gov/SysIncludes/retrieve.php?url=https://medsi.lbl.gov/files/page_145/Posters/23_Assembly_of_TPS_Beam_Position_Monitor_Ying-Tzu_Huang_PAPER.pdf.
10. Sheng · Proc. IPAC’10 · 2010 · 1506
11. Cheng · Proc. IPAC’11 · 2011 · 1692
12. https://www.youtube.com/watch?v=eae-oWT9hqg.
13. Saeki · Rev. Sci. Instrum. · 1991 · 62 · 87410.1063/1.1142024 ↗
14. Tanimoto · Phys. Rev. Spec. Top. - Accel. beams · 2009 · 12 · 11070210.1103/PhysRevSTAB.12.110702 ↗
15. Kuo · Proc. IPAC’15 · 2015 · 1314
16. Hori · Vacuum · 1993 · 44 · 53110.1016/0042-207X(93)90089-S ↗
17. Grőbner · Vacuum · 1983 · 33 · 39710.1016/0042-207X(83)90659-0 ↗
18. Giannantonio · J. Vac. Sci. Technol. A Vac. Surf. Films · 1996 · 15 · 18710.1116/1.580462 ↗
19. Hori · Appl. Surf. Sci. · 2001 · 169–170 · 72410.1016/S0169-4332(00)00774-1 ↗
20. Miertusova · Vacuum · 2001 · 60 · 10110.1016/S0042-207X(00)00361-4 ↗
21. Mathewson · AIP Conf. Proc. · 1991 · 236 · 31310.1063/1.41124 ↗
22. Le Duff · Nucl. Instrum. Methods Phys. Res. A · 1985 · 239 · 8310.1016/0168-9002(85)90702-8 ↗
23. Kurokawa · 1999 · 150
24. Chan · J. Phys. Conf. Ser. · 2008 · 100 · 09202510.1088/1742-6596/100/9/092025 ↗