Reinforcing steel passivation in mortar and pore solution
Source abstract
Abstract
Under field conditions, steel is embedded in concrete for a long period of time before chlorides penetrate. In studying the corrosion behaviour of steel in concrete, mortar or in simulated pore solution, it is essential to allow enough time for the steel to create a passive layer which is the subject of this study. This time is given to steel in chloride free concrete, naturally; while it should be provided to steel in synthetic pore solution, before adding chloride to the solution. For determining this time, samples were made with steel with different surface conditions: as-received with mill scales and sand-blasted. One set of steel bars (as-received and sand-blasted) were embedded in mortar and one set were immersed in synthetic pore solution. Corrosion of each steel bar was monitored every hour by LPR technique for total time of 300 h. Also, half-cell potential of steel bars was measured during that time. Results show that steel needs to be kept at least three days in synthetic pore solution and seven days in mortar to be passivated.
Source: openaire · Quality: candidate unverified · Source record ↗
Research context
OpenAlex topics: Concrete Corrosion and Durability · Concrete and Cement Materials Research · Concrete Properties and Behavior
SciVX discovery tags are terminology-based. OpenAlex topics are source-provided classifications.
References (20)
Show source-provided references
1. Passivation of reinforcing steel in concrete10.4028/www.scientific.net/MSF.192-194.891 ↗
2. T.D. Marcotte, “Characterisation of chloride-induced corrosion products that forms in steel reinforced cementitious materials”, PhD Thesis, University of Waterloo, 2001.
3. A rapid cyclic voltammetric method for studying cement factors affecting the corrosion of reinforced concrete10.1016/S0008-8846(99)00056-3 ↗
4. Synthetic concrete pore solution chemistry and rebar corrosion rate in the presence of chloride10.1016/0008-8846(90)90097-H ↗
5. Impedance study of reinforcing steel in simulated pore solution with tannin10.1149/1.1837031 ↗
6. Corrosion of reinforcing steel in simulated concrete pore solutions: effect of carbonation and chloride content10.1016/j.corsci.2004.03.013 ↗
7. Comments on electrochemical measurements of the rate of corrosion of steel in concrete10.1016/0008-8846(84)90135-2 ↗
8. Pourpaix · 1974
9. Q. Tan, C.M. Hansson, “The influence of supplementary cementing materials on the initial corrosion of galvanized steel reinforcing bar”; in Cement and Concrete Research (in press).
10. Monitoring of hydration of white cement paste with proton NMR spin–spin relaxation10.1111/j.1151-2916.2000.tb01242.x ↗
11. S. Jaffer, “A study of the hydration and microstructure of concrete pastes by NMR, MRI, electron microscopy and fluorescence microscopy”; MASc thesis, University of Waterloo, 2004.
12. Dielectric properties of portland cement paste as a function of time since mixing10.1063/1.343577 ↗
13. 1994
14. Monitoring the hydration in LWA-concrete by dielectric measurements
15. ASTM C876–91 · Standard Test Method for Half-cell Potentials of Uncoated Reinforcing Steel in Concrete · 1999 · vol. 03.02 · 446
16. F. Pianca, Ministry of Transportation Ontario (MTO), personal communication, 2006.
17. Corrosion of iron under alternate wet and dry conditions10.5006/1.3280551 ↗
18. Characterization of rust on ancient Indian iron
19. An investigation of phase transitions in rust layers using Raman spectroscopy10.1016/0010-938X(89)90052-8 ↗
20. Characterization of iron oxides commonly formed as corrosion products on steel10.1023/A:1011076308501 ↗