Microstructure characterisation and performance investigation of a rapid hardening emulsified asphalt seal mixture
Source abstract
Abstract
In terms of longer hardening time of emulsified asphalt seal mixture, a rapid hardening seal mixture was prepared by adding cement and carbon fibre to the Styrene–Butadiene-Rubber (SBR)-modified emulsified asphalt. The mix proportion of mixture was determined by testing the mixable time, consistency, wet track abrasion value, adhered sand content, cohesion force and the cracking rate. The microscopic mechanisms of rapid hardening and cracking control were studied using the Scanning Electron Microscopy (SEM) and the Fourier Transform Infrared Spectroscopy (FTIR). It is found that the optimum contents of SBR-modified emulsified asphalt, added water, cement and carbon fibre in the prepared mixture are 12%, 13%, 4% and 4%, respectively. At 20°C, with a relative humidity of 90% and a wind speed of 10 km/h, the opening time to traffic of mixture adding 4% ordinary Portland cement can be 2 h earlier than that without cement.
Source: openalex_inverted_index · Quality: baseline
Research context
OpenAlex topics: Asphalt Pavement Performance Evaluation · Infrastructure Maintenance and Monitoring · Innovative concrete reinforcement materials
SciVX discovery tags are terminology-based. OpenAlex topics are source-provided classifications.
Affiliations
National Engineering Laboratory of Highway Maintenance Technology, Changsha University of Science & Technology, Changsha, People’s Republic of China
Shanghai Municipal Engineering Design Institute (Group) Co., Ltd., Shanghai, People’s Republic of China
Funding
National Natural Science Foundation of China
References (25)
Show source-provided references
1. 10.1016/j.conbuildmat.2010.06.09110.1016/j.conbuildmat.2010.06.091 ↗
2. 10.1016/j.conbuildmat.2015.07.17710.1016/j.conbuildmat.2015.07.177 ↗
3. Cao M. · Journal of the Chinese Ceramic Society · 2015 · 43 · 634
4. 10.1061/(ASCE)MT.1943-5533.000145410.1061/(ASCE)MT.1943-5533.0001454 ↗
5. 10.3141/2590-1110.3141/2590-11 ↗
6. 10.1016/j.conbuildmat.2017.06.08010.1016/j.conbuildmat.2017.06.080 ↗
7. 10.1016/j.conbuildmat.2017.12.23110.1016/j.conbuildmat.2017.12.231 ↗
8. 10.1016/j.cemconcomp.2007.05.00310.1016/j.cemconcomp.2007.05.003 ↗
9. 10.1016/j.conbuildmat.2018.10.09110.1016/j.conbuildmat.2018.10.091 ↗
10. 10.1016/j.cemconcomp.2018.02.00710.1016/j.cemconcomp.2018.02.007 ↗
11. 10.1016/j.conbuildmat.2017.12.15010.1016/j.conbuildmat.2017.12.150 ↗
12. 10.1061/(ASCE)MT.1943-5533.000262310.1061/(ASCE)MT.1943-5533.0002623 ↗
13. 10.1016/j.conbuildmat.2018.09.06410.1016/j.conbuildmat.2018.09.064 ↗
14. 10.1016/j.conbuildmat.2015.09.01910.1016/j.conbuildmat.2015.09.019 ↗
15. 10.1016/j.conbuildmat.2016.03.11210.1016/j.conbuildmat.2016.03.112 ↗
16. 10.1016/j.jclepro.2017.04.10510.1016/j.jclepro.2017.04.105 ↗
17. 10.1007/s11665-007-9095-210.1007/s11665-007-9095-2 ↗
18. 10.1016/j.conbuildmat.2018.05.14110.1016/j.conbuildmat.2018.05.141 ↗
19. 10.1016/j.conbuildmat.2017.01.01610.1016/j.conbuildmat.2017.01.016 ↗
20. 10.1016/j.conbuildmat.2016.10.06010.1016/j.conbuildmat.2016.10.060 ↗
21. 10.1016/j.conbuildmat.2014.04.05410.1016/j.conbuildmat.2014.04.054 ↗
22. 10.1016/j.conbuildmat.2013.11.01310.1016/j.conbuildmat.2013.11.013 ↗
23. 10.1016/j.conbuildmat.2011.07.01010.1016/j.conbuildmat.2011.07.010 ↗
24. Zhang J. · International Journal of Pavement Engineering · 2019 · 1
25. 10.1061/(ASCE)GM.1943-5622.000144610.1061/(ASCE)GM.1943-5622.0001446 ↗