journal article·2019-09Open access

Sequential glory hole approach as a new mining method for sustainable operations

Edmo Rodovalho, Alexandre Orlandi Passos, Giorgio de Tomi, Jorge Alberto Soares Tenório

Abstract

Some mines use shafts to outflow the material mined by surface methods aiming to reduce the average distance of haulage. However, this application is restricted due to the unavailability of a methodology devoted to integrating the underground structures with surface mining plans. This mismatch implies an intensive use of trucks for haulage operations. How can open pit mining operations with mobile equipment be developed without using trucks? The present study aims to develop a mining method that integrates underground structures, for material outflow, with the surface mining development reducing the truck fleet. Considering this innovative mining geometry, haulage can employ alternative equipment or even adopt the truckless concept. After the geometric simulations using mine planning software tools, the proposed method has reached a strip ratio reduction of 8.3%. In addition, the method allowed the stacking of waste rocks and dewatered tailings in mined areas during the mining of subsequent pushbacks. These results make mining more sustainable, since it reduces area affected by waste piles and tailings dams.
Source: openalex_inverted_index · Quality: baseline

Research context

OpenAlex topics: Mining Techniques and Economics · Belt Conveyor Systems Engineering · Mineral Processing and Grinding

SciVX discovery tags are terminology-based. OpenAlex topics are source-provided classifications.

References (22)

Show source-provided references
1. Energy and greenhouse gas impacts of mining and mineral processing operations10.1016/j.jclepro.2009.09.020 ↗
2. Simulation of the impact of mine face geometry on the energy efficiency of short-distance haulage mining operations10.1080/14749009.2016.1170990 ↗
3. Impact of quality of iron ore lumps on sustainability of mining operations in the Quadrilátero Ferrífero area10.1016/j.mineng.2014.09.019 ↗
4. Application of large-screen immersive visualization system to demonstrate sustainable mining practices principles10.1179/1743286314Y.0000000068 ↗
5. Incorporating waste management into oil sands long term production planning10.1179/1743286312Y.0000000031 ↗
6. Ward N., Fenoglio J.L., Benitez R.. Design and construction challenges at the Gualcamayo Mine. Society for Mining, Metallurgy & Exploration Conf. 2011 Feb 27 - Mar 2; Denver, USA. p. 64–70.
7. Optimising combined open pit and underground strategic plan10.1179/1743286313Y.0000000038 ↗
8. Transition from open-pit to underground in the case of Chah-Gaz iron ore combined mining10.1134/S1062739149060166 ↗
9. Luxford J. Surface to Underground – Making the Transition. Mindev 97 Conference. The Australian Inst. of Min. and Met. 1997 Nov 24-26; Sydney, Australia. p. 79–87.
10. Olavarría S., Adriasola P., Karzulovic A. Transition from open pit to underground mining at Chuquicamata, Antofagasta, Chile. Int. Symp. on stability of rock slopes in open pit mining and civil eng. 2006 Apr 3-6; Cape Town, South Africa. p. 421–434.
11. New ergonomic device to improve occupational safety of blasthole drill operators10.1016/j.jmrt.2018.11.013 ↗
12. Analysis of energy consumption and carbon footprint from underground haulage with different power sources in typical Canadian mines10.1016/j.jclepro.2017.07.233 ↗
13. Modelling of in-pit crusher conveyor alternatives10.1179/1743286313Y.0000000048 ↗
14. The greenhouse gas impact of IPCC and ore-sorting technologies10.1016/j.mineng.2012.11.012 ↗
15. The optimal location of the distribution point of the belt conveyor system in continuous surface mining operational10.1016/j.simpat.2014.04.006 ↗
16. Hartman · 2002
17. Personal perspective on paste and thickened tailings: a decade on10.1179/1743286311Y.0000000019 ↗
18. Khumani iron ore mine paste disposal and water recovery system
19. Characterizing rock masses by the RMi for use in practical rock engineering, part 2: some practical applications of the rock mass index (RMi)10.1016/0886-7798(96)00028-4 ↗
20. Olsson R., Palmstrom A. Critical review of EC7 concerning prespective measures for rock mechanics design. Rock Engineering and Rock Mechanics: Structures in and on rock masses. ISRM European Symp. Taylor & Francis Group. 2014 May 27-29; London, UK. p. 1493–1498.10.1201/b16955-260 ↗
21. Strategic mine planning under uncertainly – stochastic optimization for strategic mine planning: a decade of developments10.1134/S1062739147020018 ↗
22. Optimized open pit mine design, pushbacks and the gap problems – a review10.1134/S1062739114030132 ↗