journal article·2026-05-01

Long-Term Field Monitoring and Analysis of Post-Tensioned Flat Slab System

Authors not provided

ACI Structural Journal· Volume 123· Issue 3
Publisher page

Abstract

No abstract is available for this record. The assistant can identify its topic from the title, but cannot infer the study’s results.

Source: Not provided · Quality: missing

Research context

OpenAlex topics: Concrete Properties and Behavior · Structural Health Monitoring Techniques · Fire effects on concrete materials

SciVX discovery tags are terminology-based. OpenAlex topics are source-provided classifications.

References (43)

Show source-provided references
1. Jeon, S.-J.; Park, S. Y.; and Kim, S. T., “Temperature Compensation of Fiber Bragg Grating Sensors in Smart Strand,” Sensors (Basel), V. 22, No. 9, 2022, p. 3282 doi: 10.3390/s22093282210.3390/s22093282 ↗
2. Kim, S.-H.; Park, S. Y.; Kim, S. T.; and Jeon, S.-J., “Analysis of Short-Term Prestress Losses in Post-tensioned Structures Using Smart Strands,” International Journal of Concrete Structures and Materials, V. 16, No. 1, 2022, pp. 1-15. doi: 10.1186/s40069-021-00488-310.1186/s40069-021-00488-3 ↗
3. Jeon, S.-J.; Park, S. Y.; Kim, S.-H.; Kim, S. T.; and Park, Y., “Estimation of Friction Coefficient Using Smart Strand,” International Journal of Concrete Structures and Materials, V. 9, No. 3, 2015, pp. 369-379. doi: 10.1007/s40069-015-0112-910.1007/s40069-015-0112-9 ↗
4. Kim, S.-H.; Park, S. Y.; and Jeon, S.-J., “Long-Term Characteristics of Prestressing Force in Post-Tensioned Structures Measured Using Smart Strands,” Applied Sciences, V. 10, No. 12, 2020, p. 4084. doi: 10.3390/app1012408410.3390/app10124084 ↗
5. Precast/Prestressed Concrete Institute (PCI), Bridge Design Manual, third edition, Chicago, IL, 2014.
6. Breckenridge, R. A., and Bugg, S. L., “Effects of Long-Time Loads on Prestressed Concrete Beams,” PCI Journal, V. 9, No. 6, 1964, pp. 75-89. doi: 10.15554/pcij.12011964.75.8910.15554/pcij.12011964.75.89 ↗
7. Branson, D. E.; Meyers, B. L.; and Kripanarayanan, K. M., “Time-Dependent Deformation of Noncomposite and Composite Prestressed Concrete Structures,” Department of Civil Engineering, University of Iowa, Iowa City, IA, 1970.
8. Anderson, T. C.; Houdeshell, D. M.; and Gamble, W. L., “Construction and Long-Term Behavior of 1/8th Scale Prestressed Concrete Bridge Components,” University of Illinois, Urbana, IL, 1972.
9. Chiu, H.-S.; Chern, J.-C.; and Chang, K.-C., “Long-Term Deflection Control in Cantilever Prestressed Concrete Bridges II: Experimental Verification,” Journal of Engineering Mechanics, ASCE, V. 122, No. 6, 1996, pp. 495-501. doi: 10.1061/(ASCE)0733-9399(1996)122:6(495)10.1061/(ASCE)0733-9399(1996)122:6(495) ↗
10. Braimah, A.; Green, M. F.; and Soudki, K. A., “Long-Term Behavior of CFRP Prestressed Concrete Beams,” PCI Journal, V. 48, No. 2, 2003. doi: 10.15554/pcij.03012003.98.10710.15554/pcij.03012003.98.107 ↗
11. Zou, P., “Long-Term Deflection and Cracking Behavior of Concrete Beams Prestressed with Carbon Fiber-Reinforced Polymer Tendons,” Journal of Composites for Construction, ASCE, V. 7, No. 3, 2003, pp. 187-193. doi: 10.1061/(ASCE)1090-0268(2003)7:3(187)10.1061/(ASCE)1090-0268(2003)7:3(187) ↗
12. Xue, W.; Ding, M.; He, C.; and Li, J., “Long-Term Behavior of Prestressed Composite Beams at Service Loads for One Year,” Journal of Structural Engineering, ASCE, V. 134, No. 6, 2008, pp. 930-937. doi: 10.1061/(ASCE)0733-9445(2008)134:6(930)10.1061/(ASCE)0733-9445(2008)134:6(930) ↗
13. Radnić, J., and Matešan, D., “Testing of Prestressed Concrete Shell Under Long-Term Load and Unload,” Experimental Mechanics, V. 50, No. 5, 2010, pp. 575-588. doi: 10.1007/s11340-009-9242-910.1007/s11340-009-9242-9 ↗
14. Fornůsek, J.; Konvalinka, P.; Sovják, R.; and Vítek, J. L., “Long-Term Behaviour of Concrete Structures Reinforced with Pre-Stressed GFRP Tendons,” WIT Transactions on Modelling and Simulation, V. 48, 2009, pp. 535-545. doi: 10.2495/CMEM09048110.2495/CMEM090481 ↗
15. Terrasi, G. P.; Meier, U.; and Affolter, C., “Long-Term Bending Creep Behavior of Thin-Walled CFRP Tendon Pretensioned Spun Concrete Poles,” Polymers, V. 6, No. 7, 2014, pp. 2065-2081. doi: 10.3390/polym607206510.3390/polym6072065 ↗
16. Singh, M., “Long Term and Short Term Deflection of GFRP Prestressed Concrete Slabs,” The University of Manitoba, 2014.
17. Zawam, M.; Soudki, K.; and West, J. S., “Effect of Prestressing Level on the Time-Dependent Behavior of GFRP Prestressed Concrete Beams,” Journal of Composites for Construction, ASCEV, V. 21, No. 4, 2017, p. 04017001. doi: 10.1061/(ASCE)CC.1943-5614.000078310.1061/(ASCE)CC.1943-5614.0000783 ↗
18. Cao, G.; Han, C.; Dai, Y.; and Zhang, W., “Long-Term Experimental Study on Prestressed Steel–Concrete Composite Continuous Box Beams,” Journal of Bridge Engineering, ASCE, V. 23, No. 9, 2018, p. 04018067. doi: 10.1061/(ASCE)BE.1943-5592.000126910.1061/(ASCE)BE.1943-5592.0001269 ↗
19. Cao, G. H.; Zhang, S.; Zhang, W.; and Peng, X. R., “Long-Term Deflection Test and Theoretical Analysis on Cracked Prestressed Concrete Box Beams,” KSCE Journal of Civil Engineering, V. 22, No. 2, 2018, pp. 688-695. doi: 10.1007/s12205-017-1295-110.1007/s12205-017-1295-1 ↗
20. Sovják, R.; Havlásek, P.; and Vítek, J., “Long-Term Behavior of Concrete Slabs Prestressed with CFRP Rebars Subjected to Four-Point Bending,” Construction and Building Materials, V. 188, 2018, pp. 781-792. doi: 10.1016/j.conbuildmat.2018.08.08410.1016/j.conbuildmat.2018.08.084 ↗
21. Al-Negheimish, A. I.; El-Sayed, A. K.; Khanbari, M. O.; and Alhozaimy, A. M., “Long-Term Deflection of Prestressed SCC Hollow Core Slabs,” Construction and Building Materials, V. 189, 2018, pp. 181-191. doi: 10.1016/j.conbuildmat.2018.08.11610.1016/j.conbuildmat.2018.08.116 ↗
22. Zawam, M.; Soudki, K.; and West, J. S., “Factors Affecting the Time-Dependent Behaviour of GFRP Prestressed Concrete Beams,” Journal of Building Engineering, V. 24, 2019, p. 100715. doi: 10.1016/j.jobe.2019.02.00710.1016/j.jobe.2019.02.007 ↗
23. Yang, M.; Jin, S.; and Gong, J., “Concrete Creep Analysis Method Based on a Long-Term Test of Prestressed Concrete Beam,” Advances in Civil Engineering, V. 2020, No. 1, 2020, p. 3825403. doi: 10.1155/2020/382540310.1155/2020/3825403 ↗
24. Cao, G.; Zhang, W.; Hu, J.; and Peng, X., “Long-Term Performance of Prestressed Concrete Continuous Box Girders in the Natural Environment,” Canadian Journal of Civil Engineering, V. 47, No. 7, 2020, pp. 856-864. doi: 10.1139/cjce-2018-044710.1139/cjce-2018-0447 ↗
25. Li, X.; Deng, J.; Wang, Y.; Xie, Y.; Liu, T.; and Rashid, K., “RC Beams Strengthened by Prestressed CFRP Plate Subjected to Sustained Loading and Continuous Wetting Condition: Time-Dependent Prestress Loss,” Construction and Building Materials, V. 275, 2021, p. 122187. doi: 10.1016/j.conbuildmat.2020.12218710.1016/j.conbuildmat.2020.122187 ↗
26. Shi, J.; Wang, X.; Wu, Z.; Wei, X.; and Ma, X., “Long-Term Mechanical Behaviors of Uncracked Concrete Beams Prestressed with External Basalt Fiber-Reinforced Polymer Tendons,” Engineering Structures, V. 262, 2022, p. 114309. doi: 10.1016/j.engstruct.2022.11430910.1016/j.engstruct.2022.114309 ↗
27. Cao, G.; Shen, J.; Yang, L.; Li, K.; and Li, Z., “Experimental and Modeling Study on Long-Term Deformation of Three-Span Prestressed Concrete Continuous Box-Girder Bridge Model after Cracking,” Journal of Bridge Engineering, V. 29, No. 10, 2024, p. 04024073. doi: 10.1061/JBENF2.BEENG-672510.1061/JBENF2.BEENG-6725 ↗
28. Korea Institute of Civil Engineering and Building Technology (KICT), “Development of Smart Prestressing and Monitoring Technologies for Pre-Stressed Concrete Bridges,” Goyang-si, Republic of Korea, 2013.
29. Jeon, S.-J.; Shin, H.; Kim, S.-H.; Park, S. Y.; and Yang, J.-M., “Transfer Lengths in Pretensioned Concrete Measured Using Various Sensing Technologies,” International Journal of Concrete Structures and Materials, V. 13, No. 1, 2019, p. 43 doi: 10.1186/s40069-019-0355-y10.1186/s40069-019-0355-y ↗
30. Ebrahimi Motlagh, H. R., and Rahai, A., “Prediction of Long-Term Prestress Loss in Prestressed Concrete Beam with Corrugated Steel Web,” International Journal of Civil Engineering, V. 20, No. 11, 2022, pp. 1309-1325. doi: 10.1007/s40999-022-00731-210.1007/s40999-022-00731-2 ↗
31. Han, W.; Tian, P.; Lv, Y.; Zou, C.; and Liu, T., “Long-Term Prestress Loss Calculation Considering the Interaction of Concrete Shrinkage, Concrete Creep, and Stress Relaxation,” Materials (Basel), V. 16, No. 6, 2023, p. 2452. doi: 10.3390/ma1606245210.3390/ma16062452 ↗
32. Youakim, S. A.; Ghali, A.; Hida, S. E.; and Karbhari, V. M., “Prediction of Long-Term Prestress Losses,” PCI Journal, V. 52, No. 2, 2007, pp. 116-130. doi: 10.15554/pcij.03012007.116.13010.15554/pcij.03012007.116.130 ↗
33. Park, H.-G.; Hwang, H.-J.; Hong, G.-H.; Kim, Y.-N.; and Kim, J.-Y., “Slab Construction Load Affected by Shore Stiffness and Concrete Cracking,” ACI Structural Journal, V. 108, No. 6, Nov.-Dec. 2011, pp. 679-688. doi: 10.14359/5168336610.14359/51683366 ↗
34. Hwang, H.-J.; Park, H.-G.; Hong, G.-H.; Kim, J.-Y.; and Kim, Y.-N., “Time-Dependent Deflection of Slab Affected by Construction Load,” ACI Structural Journal, V. 113, No. 3, May-June 2016, pp. 557-566. doi: 10.14359/5168794310.14359/51687943 ↗
35. Hansen, P. F., and Pedersen, E. J., “Maturity Computer for Controlled Curing and Hardening of Concrete,” Nordisk Betong, V. 1, No. 19, 1977, pp. 19-34.
36. Korea Meteorological Administration, Climate Statistics Analysis, Seoul, Korea 2025.
37. The Architectural Institute of Korea (AIK), Korean Building Code and Commentary (KBC), 2016.
38. Hong, G.-H.; Park, H.-G.; Eum, T.-S.; Mihn, J.-S.; and Kim, Y.-N., “Evaluation of Strength and Stiffness Gain of Concrete at Early-Ages,” Journal of the Korea Concrete Institute, V. 22, No. 2, 2010, pp. 237-245. doi: 10.4334/JKCI.2010.22.2.23710.4334/JKCI.2010.22.2.237 ↗
39. ACI Committee 318, “Building Code for Structural Concrete—Code Requirements and Commentary (ACI CODE-318-25),” American Concrete Institute, Farmington Hills, MI, 2025, 704 pp.
40. Martin, L. D., “A Rational Method for Estimating Camber and Deflection of Precast Prestressed Members,” PCI Journal, V. 22, No. 1, 1977, pp. 100-108. doi: 10.15554/pcij22.1-0410.15554/pcij22.1-04 ↗
41. Nguyen, N.-M.; Wang, W.-C.; and Cao, M.-T., “Early Estimation of the Long-Term Deflection of Reinforced Concrete Beams Using Surrogate Models,” Construction and Building Materials, V. 370, 2023, p. 130670. doi: 10.1016/j.conbuildmat.2023.13067010.1016/j.conbuildmat.2023.130670 ↗
42. Bischoff, P. H., “Computing Deflections Using ACI CODE-318-19 and Beyond, Part 4,” Concrete International, V. 47, No. 5, May 2025, pp. 62-65.10.14359/51746784 ↗
43. Bischoff, P. H., and Scanlon, A., “Effective Moment of Inertia for Calculating Deflections of Concrete Members Containing Steel Reinforcement and Fiber-Reinforced Polymer Reinforcement,” ACI Structural Journal, V. 104, No. 1, Jan.-Feb. 2007, pp. 68-75.10.14359/18434 ↗