Structural and Mechanical Characteristics of Double-Hoop Unbonded Annular Anchor Lining
Source abstract
Abstract
First Name is required invalid characters Last Name is required invalid characters Email Address is required Invalid Email Address Invalid Email Address
Only a short abstract or summary was supplied by the source.
Source: openalex_inverted_index · Quality: short
Research context
OpenAlex topics: Structural Load-Bearing Analysis · Structural Behavior of Reinforced Concrete · Structural Engineering and Materials Analysis
SciVX discovery tags are terminology-based. OpenAlex topics are source-provided classifications.
References (28)
Show source-provided references
1. Abbas, S.; Soliman, A. M.; and Nehdi, M. L., 2014, “Mechanical Performance of RC and SFRC Precast Tunnel Lining Segments: A Case Study,” ACI Materials Journal, V. 111, No. 5, Sept.-Oct., pp. 501-510. doi: 10.14359/5168710110.14359/51687101 ↗
2. Ahn, J. H.; Jung, C. Y.; and Kim, S. H., 2010, “Evaluation on Structural Behaviors of Prestressed Composite Beams Using External Prestressing Member,” Structural Engineering and Mechanics, V. 34, No. 2, pp. 247-275. doi: 10.12989/sem.2010.34.2.24710.12989/sem.2010.34.2.247 ↗
3. Bai, W., and Wang, Q. F., 2014, “Stress–Strain Characteristics and Elastic–Plastic Damage Constitutive Equation of Steel Fiber Reinforced Concrete under Cyclic Compression at Medium Strain Rate,” Journal of Testing and Evaluation, V. 42, No. 6, p. JTE20130150. doi: 10.1520/JTE2013015010.1520/JTE20130150 ↗
4. Burningham, C. A.; Pantelides, C. P.; and Reaveley, L. D., 2014, “Repair of Prestressed Concrete Beams with Damaged Steel Tendons Using Post-Tensioned Carbon Fiber-Reinforced Polymer Rods,” ACI Structural Journal, V. 111, No. 2, Mar.-Apr., pp. 387-395.10.14359/51686529 ↗
5. Cao, R.; Wang, Y.; Zhao, Y.; Pi, J.; and Yao, W., 2016, “Study on Numerical Modelling Method of the Prestressed Tunnel Lining with Unbonded Curve Anchored Tendons,” Journal of China Institute Water Resource and Hydropower Research, V. 14, No. 6, pp. 471-477.
6. Dadashi, E.; Noorzad, A.; Shahriar, K.; and Goshtasbi, K., 2017, “Hydro-Mechanical Interaction Analysis of Reinforced Concrete Lining in Pressure Tunnels,” Tunnelling and Underground Space Technology, V. 69, No. 10, pp. 125-132. doi: 10.1016/j.tust.2017.06.00610.1016/j.tust.2017.06.006 ↗
7. Fahimifar, A., and Soroush, H., 2005, “A Theoretical Approach for Analysis of the Interaction between Grouted Rockbolts and Rock Masses,” Tunnelling and Underground Space Technology, V. 20, No. 4, pp. 333-343. doi: 10.1016/j.tust.2004.12.00510.1016/j.tust.2004.12.005 ↗
8. Hajali, M.; Alavinasab, A.; and Shdid, C. A., 2016, “Structural Performance of Buried Prestressed Concrete Cylinder Pipes with Harnessed Joints Interaction Using Numerical Modeling,” Tunnelling and Underground Space Technology, V. 51, No. 1, pp. 11-19. doi: 10.1016/j.tust.2015.10.01610.1016/j.tust.2015.10.016 ↗
9. Kang, J. F.; Liang, Y. H.; and Zhang, Q. C., 2006, “3-D Finite Element Analysis of Post-Prestressed Concrete Lining,” Journal of Tianjin University Science and Technology, V. 39, No. 8, pp. 968-972.
10. Kang, J. F.; Sui, C. E.; and Wang, X. Z., 2014, “Structure Optimization of the Prestressed Tunnel Lining with Unbonded Circular Anchored Tendons,” Journal of Hydraulic Engineering, V. 45, No. 1, pp. 103-108.
11. Landau, Y. A., 1991, “New Design of Reinforced Concrete Penstock Compensator,” Hydrotechnical Construction, V. 25, No. 3, pp. 172-174. doi: 10.1007/BF0142398210.1007/BF01423982 ↗
12. Lee, Y., and Lee, E. T., 2015, “Analysis of Prestressed Concrete Cylinder Pipes with Fiber Reinforced Polymer,” KSCE Journal of Civil Engineering, V. 19, No. 3, pp. 682-688. doi: 10.1007/s12205-013-0006-910.1007/s12205-013-0006-9 ↗
13. Lou, T.; Lopes, S. M. R.; and Lopes, A. V., 2013, “Nonlinear and Time-Dependent Analysis of Continuous Unbonded Prestressed Concrete Beams,” Computers & Structures, V. 119, No. 4, pp. 166-176. doi: 10.1016/j.compstruc.2012.12.01410.1016/j.compstruc.2012.12.014 ↗
14. Lv, L.; Yang, Y.; and Tang, W., 2009, “Treatment for Oil and Water Penetration in Anchorage Channel of San Discharge Tunnel, Xiaolangdi Key Water Control Project,” Chinese Building Waterproofing, V. 2009, No. 2, pp. 36-38.
15. Mander, J. A. B., and Priestley, M. J. N., 1988, “Theoretical Stress-Strain Model for Confined Concrete,” Journal of Structural Engineering, V. 114, No. 8, pp. 1026-1804.10.1061/(ASCE)0733-9445(1988)114:8(1804) ↗
16. Nagamoto, T.; Yoneda, T.; Tanaka, D.; and Irita, K., 2008, “Large P & PC Segment Works: Construction Works for Rainwater Storage under Osaka International Airport,” Tunnels and Underground, V. 39, No. 8, pp. 581-589.
17. Nishikawa, K., 2003, “Development of a Prestressed and Precast Concrete Segmental Lining,” Tunnelling and Underground Space Technology, V. 18, No. 2-3, pp. 243-251. doi: 10.1016/S0886-7798(03)00033-610.1016/S0886-7798(03)00033-6 ↗
18. Park, H. G.; Kang, S.; and Choi, K. K., 2013, “Analytical Model for Shear Strength of Ordinary and Prestressed Concrete Beams,” Engineering Structures, V. 46, No. 1, pp. 94-103. doi: 10.1016/j.engstruct.2012.07.01510.1016/j.engstruct.2012.07.015 ↗
19. Qayssar, S. M.; Mohammad, T.; and Prabhat, K. S., 2014, “Analysis of a Thin and Thick Walled Pressure Vessel for Different Materials,” International Journal of Mechanical Engineering and Technology, V. 10, No. 5, pp. 9-19.
20. Schleiss, A. J., and Manso, P. A., 2012, “Design of Pressure Relief Valves for Protection of Steel-Lined Pressure Shafts and Tunnels against Buckling during Emptying,” Rock Mechanics and Rock Engineering, V. 45, No. 1, pp. 11-20. doi: 10.1007/s00603-011-0187-910.1007/s00603-011-0187-9 ↗
21. Showkati, A.; Maarefvand, P.; and Hassani, H., 2016, “An Analytical Solution for Stresses Induced by a Post-Tensioned Anchor in Rocks Containing Two Perpendicular Joint Sets,” Acta Geotechnica, V. 11, No. 2, pp. 415-432. doi: 10.1007/s11440-015-0371-210.1007/s11440-015-0371-2 ↗
22. Simanjuntak, T. D. Y. F.; Marence, M.; Mynett, A. E.; and Schleiss, A. J., 2013, “Mechanical-Hydraulic Interaction in the Lining Cracking Process of Pressure Tunnels,” International Journal on Hydropower & Dams, V. 20, No. 3, pp. 48-54.
23. Simanjuntak, T. D. Y. F.; Marence, M.; Schleiss, A. J.; and Mynett, A. E., 2016, “The Interplay of in situ Stress Ratio and Transverse Isotropy in the Rock Mass on Prestressed Concrete-Lined Pressure Tunnels,” Rock Mechanics and Rock Engineering, V. 49, No. 11, pp. 4371-4392. doi: 10.1007/s00603-016-1035-810.1007/s00603-016-1035-8 ↗
24. Sousa, H.; Bento, J.; and Figueiras, J., 2013, “Construction Assessment and Long-Term Prediction of Prestressed Concrete Bridges Based on Monitoring Data,” Engineering Structures, V. 52, No. 9, pp. 26-37. doi: 10.1016/j.engstruct.2013.02.00310.1016/j.engstruct.2013.02.003 ↗
25. Trucco, G., and Zeltner, O., 1978, “Grimsel-Oberrar Pumped Storage System,” Water Power & Dam Construction, V. 1978, No. 2, pp. 351-357.
26. Wan, B.; Harries, K. A.; and Petrou, M. F., 2002, “Transfer Length of Strands in Prestressed Concrete Piles,” ACI Structural Journal, V. 99, No. 5, Sept.-Oct., pp. 577-585.10.14359/12297 ↗
27. Zareifard, M. R., and Fahimifar, A., 2016, “A Simplified Solution for Stresses around Lined Pressure Tunnels Considering Non-Radial Symmetrical Seepage Flow,” KSCE Journal of Civil Engineering, V. 20, No. 7, pp. 2640-2654. doi: 10.1007/s12205-016-0105-510.1007/s12205-016-0105-5 ↗
28. Zhang, Y.; Yan, Z.; Zhu, H.; and Ju, J., 2018, “Experimental Study on the Structural Behaviors of Jacking Prestressed Concrete Cylinder Pipe,” Tunnelling and Underground Space Technology, V. 73, No. 3, pp. 60-70. doi: 10.1016/j.tust.2017.11.03310.1016/j.tust.2017.11.033 ↗