Reduced analysis and confirmatory research on co-adaptability theoretical solution to conflicting events in construction engineering projects
Source abstract
Abstract
The co-adaptability theoretical solution to conflicting events in construction engineering projects has three problems. First, the transformation of constraint conditions of theoretical solution is very difficult in practical engineering applications; second, some coefficients are difficult to be determined; third, there are overfull circular arithmetic operations involved in it. To resolve these problems, a new method to reduce the theoretical solution complications is proposed. By analyzing the operating mechanism of theoretical solution model, redundancies in the theoretical solution can be eliminated, and the ISM mapping with the co-adaptability solution can be set up. Based on this approach, a procedure to solve practical conflicting events in construction projects is established by replacing characteristic variables with mathematic variables. The research results show that the procedure can replace the co-adaptability theoretical solution effectively and solve practical conflicting events in construction projects.
Source: openaire · Quality: candidate unverified · Source record ↗
Research context
OpenAlex topics: Construction Project Management and Performance
SciVX discovery tags are terminology-based. OpenAlex topics are source-provided classifications.
References (10)
Show source-provided references
1. Hou X L, Lu M. Co-adaptability solution to conflicting events in construction engineering project based on segmented hierarchical algorithm. Sci China Ser E-Tech Sci, 2008, 51(7): 932–93910.1007/s11431-008-0079-8 ↗
2. Hou X L. Research on co-adaptability of conflicting events in construction engineering project. In: International Conference on Construction and Real Estate Management. Beijing: China Architecture & Building Press, 2005. 125–128
3. Hou X L, Tan X N, He Q L. Analysis on relaxation of co-adaptability of conflicting events in construction engineering project based on entropy. In: International Conference on Construction and Real Estate Management. Beijing: China Architecture & Building Press, 2007. 297–299
4. Chen S F. The Theory & Method to Establish Model for Complex System. Nanjing: Dong Nan University Press, 2005
5. Chen Y S. Analysis of Information System and Its Stability. Beijing: China Science & Technology Press, 1993
6. Bergama S, Castano S, Vincini M. Semantic integration of heterogeneous information sources. Data Knowledge Eng, 2001, 36(3): 215–24910.1016/S0169-023X(00)00047-1 ↗
7. Castano S, Antonellis V D. Global viewing of heterogeneous data sources. Data Knowledge Eng, 2001, 13(2): 277–29710.1109/69.917566 ↗
8. Zhu L, Li B F. Simple and convenient method of ISM. Syst Eng Electron, 2004, 26(12): 1817–1891
9. Wang Z H, Qi X. The weight optimal choice method of multi-resource leveling. J Ind Eng/Eng Manage 2004, 16(3): 91–93
10. Huang H F. Discussion of eliminations of deviation from median for tendering process. Appl Statistics Manage, 2007, 26(1): 10–14