Role of manufacturing lead time in capacity planning
Source abstract
Abstract
Manufacturing lead time plays an important role in production as well as capacity planning. To expedite a manufacturing order, the lead time must be controlled. If the required production capacity exceeds the available capacity, it can be increased by overtime planning. Manufacturing lead time can be considered to be the required capacity (rough–cut capacity) for a batch, and if necessary, overtime planning could be employed to assign more work–hours (i.e. available capacity) to the batch to accommodate the batch time within the specified capacity. Thus capacity planning has a significant impact on manufacturing lead time. This paper aims to formulate shop–routing–based measurement of manufacturing lead time, and analysing the impact of overtime (capacity planning) on manufacturing lead time, in order to facilitate integrated production and capacity planning.
Source: openalex_inverted_index · Quality: baseline
Research context
OpenAlex topics: Operations Management Techniques · Quality and Supply Management · Scheduling and Optimization Algorithms
SciVX discovery tags are terminology-based. OpenAlex topics are source-provided classifications.
References
Reference metadata was not supplied for this record.