The application of quality costing to engineering changes
Source abstract
Abstract
This paper reports the findings of a quality costing exercise undertaken on the engineering change procedure of an organisation involved in the manufacture of telecommunications equipment. It was established that the average administration cost per change note was £1000, and that the yearly non–conformance costs of the engineering change procedure were estimated to be between £168,000 and £210,000. A number of actions have been taken to reduce the costs involved with engineering changes, including the introduction of a new change–note awareness programme for engineers, and the use and application of both design and process failure mode and effects analysis (FMEA).
Source: openalex_inverted_index · Quality: baseline
Research context
OpenAlex topics: Quality and Management Systems · Operations Management Techniques · Quality and Supply Management
SciVX discovery tags are terminology-based. OpenAlex topics are source-provided classifications.
References
Reference metadata was not supplied for this record.