Failure investigation and reparation of a crack on the boom of the bucket wheel excavator ERS 1250 Gacko

Djordje Djurdjevic, Tasko Maneski, Vesna Milosevic-Mitic, Nina Andjelic, Dragan Ignjatovic

Publisher page

Abstract

Abstract Bucket wheel excavator ERs 1250 has been in operation for over 30 years in the Gracanica-Gacko mining basin. It is operating in very hard working conditions due to exploiting very solid material, which has adverse effects on the behavior of the whole structure. Bucket wheel excavator boom is a single tube approximately 20 m long. The crack was detected in a cylindrical root of the boom tube at nearly 270° of its circumference. Finite element method was applied in calculations and the first calculation was performed for the complete usage of engine power (the least favorable case), but it didn't indicate the possibility of crack occurrence. Based on exploitation measurements of stress and accelerations, additional simulations of loading were performed (horizontal and vertical unit loads) that could cause the crack. Numerical analysis has shown that the horizontal force causes the initial crack. Measurements and realized loading cycles indicated that the effect of material fatigue is extremely strong. That is why the fatigue is the cause of a considerable crack increase. Based on numerical investigation of the failure, rehabilitation and reparation of the wheel boom were done in the manner as presented in the paper. So, bucket wheel excavator has been operating successfully for a number of years.
Source: openaire · Quality: candidate unverified · Source record ↗

Research context

OpenAlex topics: Mechanical Engineering Research and Applications · Surface Treatment and Coatings · Mechanical Failure Analysis and Simulation

SciVX discovery tags are terminology-based. OpenAlex topics are source-provided classifications.

References (20)

Show source-provided references
1. An analysis of the causes of a BWE counterweight boom support fracture10.1016/j.engfailanal.2009.06.001 ↗
2. Failure analysis and redesign of the bucket wheel excavator two-wheel bogie10.1016/j.engfailanal.2009.09.007 ↗
3. Failure investigation of the bucket wheel excavator crawler chain link10.1016/j.engfailanal.2013.04.025 ↗
4. ‘Designing-in’ failures and redesign of bucket wheel excavator undercarriage10.1016/j.engfailanal.2012.12.007 ↗
5. Load-bearing steel structure diagnostics on bucket wheel excavator, for the purpose of failure prevention10.1016/j.engfailanal.2011.03.001 ↗
6. Analysis of the axle fracture of the bucket wheel excavator10.1016/j.engfailanal.2010.09.031 ↗
7. Examination of the causes of a bucket wheel fracture in a bucket wheel excavator10.1016/j.engfailanal.2010.03.004 ↗
8. Failure investigation on the cracked crawler pad link10.1016/j.engfailanal.2010.01.004 ↗
9. Bucket wheel failure caused byresidual stresses in welded joints10.1016/j.engfailanal.2010.11.009 ↗
10. Structural integrity assessment for a component of the bucket-wheel excavator10.1108/IJSI-08-2012-0019 ↗
11. Scenario of fracture development in bucket well escavator
12. Failure of a bucket-wheel stacker reclaimer: metallographic and structural analyses10.1007/s11668-012-9575-z ↗
13. Bucket wheel excavator: integrity assessment of the bucket wheel boom tie – rod welded joint10.1016/j.engfailanal.2010.09.001 ↗
14. Cutting parameters optimization for difficult excavating conditions with bucket wheel excavators on Gracanica opencast mine in Gacko, mine planning and equipment selection
15. Condition and behaviour diagnostics of drive groups on belt conveyors10.1016/j.engfailanal.2012.01.001 ↗
16. The modal analysis of the main steel structure of bucket wheel stacker reclaimer10.4028/www.scientific.net/AMR.690-693.3121 ↗
17. Vertical oscillations of the working unit of a bucket-wheel10.3103/S1052618808030035 ↗
18. method of assessment of hard rock workability using bucket wheel excavators
19. Redesign of the vital subsystems as a way of extending the bucket wheel excavators life
20. EN 1993-1-9 · 2005