A hybrid maintenance approach for key components of the train bogie to optimize fleet availability
Source abstract
Abstract
In the context of intelligent transport systems and the rapid development of the global economy, railways face increasing demand to become safer, more efficient, and more sustainable. As a critical structure of the railway vehicle, the bogie, designed to support the vehicle body and transmit dynamic loads through the wheels, houses several components that are vital for the reliability and safety of the train. The maintenance of such a structure is complex and can greatly benefit from hybrid approaches that leverage the potential of condition-monitoring data in proactively identifying faults or irregularities whilst ensuring appropriate intervals that maximize the availability of resources. This paper proposes a hybrid maintenance approach that combines preventive maintenance, condition-based monitoring, and predictive maintenance for the key components of the bogie, aiming to optimize costs while exploiting potential economic savings of maintenance decisions for different grouping strategies, therefore, maximizing fleet availability. The model aims to study the feasibility and measure the expected economic returns of shifting from a complete preventive maintenance program to a hybrid program incorporating predictive maintenance tasks in selected components of the bogie. A deterioration model, along with failure rate estimation, is proposed and integrated into the optimization formulation. A case study of a railway company operating in Catalonia, Spain, is presented. The framework demonstrates flexibility in tackling current maintenance practices, including hierarchy and periodicity of maintenance tasks according to the intervention type and flexible hazard rates with three stages to mimic the bathtub curve behaviour. The results show that shifting to a hybrid maintenance plan has great potential to reduce costs. • Grouped maintenance strategy considers various railway bogie subsystems. • Degradation model for bogie with failure rates from expert judgment and literature review. • MILP model for group maintenance schedule aligns with current railway practices. • Framework’s flexibility supports predictive maintenance tasks effectively.
Source: openalex_inverted_index · Quality: baseline
Research context
OpenAlex topics: Reliability and Maintenance Optimization · Life Cycle Costing Analysis · Transport and Economic Policies
SciVX discovery tags are terminology-based. OpenAlex topics are source-provided classifications.
References (44)
Show source-provided references
1. Condition monitoring of the dampers in the railway vehicle suspension based on the vibrations response analysis of the bogie10.3390/s22093290 ↗
2. Risk evaluation of failures of the running gear with effects on rail infrastructure10.1016/j.engfailanal.2021.105613 ↗
3. Failure analysis on bogie frame with fatigue cracks caused by hunting instability10.1016/j.engfailanal.2021.105584 ↗
4. An investigation of abnormal vibration–induced coil spring failure in metro vehicles10.1016/j.engfailanal.2019.104238 ↗
5. Failure analysis of a crack on a train bolster10.1016/j.engfailanal.2018.12.010 ↗
6. Using expert judgement techniques to assess reliability for long service-life components: An application to railway wheelsets
7. Reliability and availability assessment of railway locomotive bogies under correlated failures10.1016/j.engfailanal.2022.106104 ↗
8. Leite · 2020
9. Reliability and availability assessment of diesel locomotive using fault tree analysis10.5604/08669546.1225470 ↗
10. Experimental and numerical investigation of fatigue failure for metro bogie cowcatchers due to modal vibration and stress induced by rail corrugation10.1016/j.engfailanal.2022.106810 ↗
11. Study on high frequency vibration-induced fatigue failure of antenna beam in a metro bogie10.1016/j.engfailanal.2021.105976 ↗
12. An investigation into the fatigue failure of metro vehicle bogie frame10.1016/j.engfailanal.2020.104922 ↗
13. A segmented load spectrum model for high-speed trains and its inflection stress as an indicator for line quality10.1016/j.ijfatigue.2021.106221 ↗
14. A data-driven maintenance policy for railway wheelset based on survival analysis and Markov decision process10.1002/qre.2729 ↗
15. Preventive maintenance optimization for key components of subway train bogie with consideration of failure risk10.1016/j.engfailanal.2023.107634 ↗
16. Fatigue life assessment methods for railway vehicle bogie frames10.1016/j.engfailanal.2020.104725 ↗
17. Multi-state system modeling and reliability assessment for groups of high-speed train wheels10.1016/j.ress.2020.107026 ↗
18. Optimizing maintenance decisions in railway wheelsets: A Markov decision process approach
19. Reliability data analysis of bogie components of high speed train
20. A predictive-based maintenance approach for rolling stocks vehicles
21. A two-phase preventive maintenance policy considering imperfect repair and postponed replacement10.1016/j.ejor.2018.10.049 ↗
22. Reliability analysis and maintenance decision for railway sleepers using track condition information10.1057/palgrave.jors.2602251 ↗
23. Dersin · 2023
24. Remaining useful life prediction and predictive maintenance strategies for multi-state manufacturing systems considering functional dependence10.1016/j.ress.2021.107560 ↗
25. Degradation modeling and remaining useful life prediction for dependent competing failure processes10.1016/j.ress.2021.107638 ↗
26. Remaining-useful-lifetime and system-remaining-profit based importance measures for decisions on preventive maintenance10.1016/j.ress.2021.107951 ↗
27. A novel reliability-centered opportunistic maintenance strategy for metro train complex systems10.1109/MITS.2020.3014080 ↗
28. Failure mode criticality analysis of metro door system
29. Remaining useful life estimation–a review on the statistical data driven approaches10.1016/j.ejor.2010.11.018 ↗
30. Cooke · 1991
31. Change and safety: decision-making from data10.1177/0954409713498381 ↗
32. Reliability evaluation of the Chinese train control system level 3 using a fuzzy approach10.1177/0954409718769193 ↗
33. A heuristic approach to the railroad track maintenance scheduling problem10.1111/j.1467-8667.2010.00670.x ↗
34. A heuristic approach to railway track maintenance scheduling10.2495/CR100631 ↗
35. Two-objective optimization of preventive maintenance orders scheduling as a multi-skilled resource-constrained flow shop problem10.5267/j.dsl.2022.10.007 ↗
36. A unique mathematical model for maintenance strategies to improve energy flows of the electrical power sector10.1177/0144598715623665 ↗
37. A bin packing approach to solve the aircraft maintenance task allocation problem10.1016/j.ejor.2021.01.027 ↗
38. Maintenance scheduling within rolling stock planning in railway operations under uncertain maintenance durations
39. Planning maintenance actions in train operating companies—A Portuguese case study
40. Park · 2014
41. BSI · 2017
42. M. Szkoda, G. Kaczor, Application of FMEA analysis to assess the safety of rail vehicles, in: 23rd International Symposium EURO–ZEL, 2015, pp. 1–9.
43. The application of failure mode and effects analysis (FMEA) for the risk assessment of changes in the maintenance system of railway vehicles
44. Reliability-centered predictive maintenance scheduling for a continuously monitored system subject to degradation10.1016/j.ress.2006.01.006 ↗