Calculated and experimental analysis of cause of the appearance of cracks in the running bogie frame of diesel multiple units of Serbian railways
Source abstract
Abstract
Abstract In this paper an analysis of possible causes of crack occurrence on reconstructed diesel multiple units (DMU) exploited on sideline in Serbia was performed. Analyzed DMU were designed in the sixties of the last century in accordance with standards and UIC regulations of that time. During exploitation cracks appeared on the frame of the running bogie and they were locally repaired. With the purpose of eliminating this negative occurrence that has been reducing the availability of DMU, reconstruction of primary suspension and reconstruction of the DMU running bogie frame was performed. The new construction solution of primary suspension is with rubber springs. In the designing of the new running bogie frame fatigue loads were taken into account. After approximately two and a half years of exploitation, cracks appeared again on frames of the running bogie of DMU and they are the subject of this work. This work gives an analysis of the cause of crack occurrence and investigates links between specific exploitation conditions on tracks of Serbian railways and calculations/investigations performed using currently valid UIC regulations. The analysis also includes other influential factors such as welding quality, track quality, DMU and track maintenance quality.
Source: openaire · Quality: candidate unverified · Source record ↗
Research context
OpenAlex topics: Material Properties and Failure Mechanisms · Railway Engineering and Dynamics · Technical Engine Diagnostics and Monitoring
SciVX discovery tags are terminology-based. OpenAlex topics are source-provided classifications.
References (7)
Show source-provided references
1. Statische Berechnung der Schienen-Omnibusse nach Zeichnung C1017.01.1 Waggonfabrik Uerdingen; 1951–1956.
2. UIC 515-4 Passenger rolling stock–trailer bogies–running gear–bogie frame structure strength tests, 1st ed. 1.1.93.
3. UIC 615-4 Motive power units–bogies and running gear–Bogie frame structure strength tests, 2nd ed.; February 2003 [Translation].
4. UIC 566 Loadings of coach bodies and their components, 3rd ed. 1.1.90 and addenda and 1 Amendment.
5. UIC 518 Testing and approval of railway vehicles from the point of view of their dynamic behaviour–safety–track fatique–ride quality, 3rd ed.; October 2005 [Translation].
6. ORE B12/RP60. Regulations for proof tests and maximum permissible stresses, 2nd ed.
7. Simić G, Lučanin V, Milković D. Dynamical behavior of DMU series 812/814 – test report, Faculty of Mechanical Engineering, Railway Engineering Department, Report No. 13.04-040-2004, Belgrade; May 2004.