journal article·2022-08

Erosion - corrosion coupling analysis of shale gas production pipe

Yong Chen, Haochen Wu, Yanjun Chen, Pengcheng Li, Qiliang Wang

Publisher page

Abstract

No abstract is available for this record. The assistant can identify its topic from the title, but cannot infer the study’s results.

Source: Not provided · Quality: missing

Research context

OpenAlex topics: Erosion and Abrasive Machining · Drilling and Well Engineering · Hydraulic Fracturing and Reservoir Analysis

SciVX discovery tags are terminology-based. OpenAlex topics are source-provided classifications.

References (22)

Show source-provided references
1. Corrosion Reason Analysis of 13Cr110 Tubing in an Injection and Production Well of the Suqiao Gas Storage Group10.1155/2021/6639179 ↗
2. Corrosion in Oil and Gas Production10.2118/17004-PA ↗
3. Influence of Sand Fines Transport Velocity on Erosion-Corrosion Phenomena of Carbon Steel 90-Degree Elbow10.3390/met10050626 ↗
4. Experimental and numerical investigation into the corrosion performance of X100 pipeline steel under a different flow rate in CO2-saturated produced water10.1007/s10008-020-04868-9 ↗
5. Failure analysis of Erosion-Corrosion of the bend pipe at sewage stripping units10.1016/j.engfailanal.2021.105675 ↗
6. O. Parkash, A. kumar, B.S. Sikarwar, Computational Erosion Wear Model Validation of Particulate Flow Through Mitre Pipe Bend, Arabian Journal for Science and Engineering, 46 (2021) 12373-12390. CFD modeling of slurry flow erosion wear rate through mitre pipe bend https://doi.org/10.1177/09544062211026353.10.1007/s13369-021-05931-x ↗
7. Study on corrosion mechanism and the risk of the shale gas gathering pipelines10.1016/j.engfailanal.2021.105622 ↗
8. Numerical Simulation of Gas-Solid Two-Phase Erosion for Elbow and Tee Pipe in Gas Field10.3390/en14206609 ↗
9. Investigation on wall thickness reduction of hydropower pipeline underwent to erosion-corrosion process10.1016/j.engfailanal.2021.105504 ↗
10. 3D computational modeling of sand erosion in gas-liquid-particle multiphase annular flows in bends10.1016/j.wear.2020.203241 ↗
11. Failure analysis of a four-way flange erosioning in a KQ52 wellhead Christmas tree10.1016/j.engfailanal.2021.105641 ↗
12. Longitudinal fracture and water accumulation at 6 o'clock position of an API 5L X52 oil pipeline10.1016/j.engfailanal.2021.105691 ↗
13. Failure analysis of boiler tube at a petrochemical plant10.1016/j.engfailanal.2019.104146 ↗
14. Failure analysis of a wet gas pipeline due to localised CO2 corrosion10.1016/j.engfailanal.2018.03.006 ↗
15. Erosion simulation and improvement scheme of separator blowdown system 4 A case study of Changning national shale gas demonstration area10.1016/j.jngse.2021.103856 ↗
16. Under-deposit corrosion of tubing served for injection and production wells of CO2 flooding10.1016/j.engfailanal.2021.105540 ↗
17. Corrosion behavior of X65 steel at different depths of pitting defects under local flow conditions10.1016/j.expthermflusci.2020.110333 ↗
18. Modeling and experimental study of CO2 corrosion on carbon steel at elevated pressure and temperature10.1016/j.jngse.2015.10.034 ↗
19. Effect of temperature on CO2 corrosion of carbon steel10.1002/sia.3057 ↗
20. A Novel Approach for the Evaluation of Under Deposit Corrosion in Marine Environments Using Combined Analysis by Electrochemical Impedance Spectroscopy and Electrochemical Noise10.1016/j.electacta.2016.08.146 ↗
21. Electrochemical evaluation of under-deposit corrosion and its inhibition using the wire beam electrode method10.1016/j.corsci.2010.12.015 ↗
22. Central tube erosion investigation of torque impactor in the deep shale gas formation