Performance of precast segmental concrete beams posttensioned with carbon fiber-reinforced polymer (CFRP) tendons
Source abstract
Abstract
Abstract Precast segmental prestressed concrete beams (PSBs) have been widely used in many elevated highway bridge projects around the world. Steel tendons at joint locations, however, are vulnerable to corrosion damages , which cause deteriorations and in extreme cases lead to the collapse of the whole structures. This study experimentally investigates the use of carbon fibre-reinforced polymer (CFRP) tendons as an alternative solution for the PSBs to tackle the corrosion issue. Four large-scale segmental T-shaped concrete beams with internal bonded or unbonded tendons and dry or epoxied joints were built and tested under four-point loading. The test results indicated that CFRP tendons showed satisfactory performances therefore could replace steel tendons for the use in PSBs. All the tested beams exhibited excellent load-carrying capacity and ductility. Tendon bonding condition greatly affected the flexural performance of the segmental beams. Joint type had only a slight effect on the load-carrying capacity and ductility of the beams, but significantly affected the beams’ initial stiffness . Unbonded tendons experienced an evident reduction in the tendon strength at the ultimate stage as a consequence of the loading type, harping effect and joint opening. Both AASTHO-1999 and ACI 440.4R-04 predicted well the tendon stress, thus the load-carrying capacity of the beams with bonded tendons, however, the accuracy significantly reduced for the cases with unbonded tendons. Similarly, the codes did not well estimate the deformation capacity of the prestressed beams with unbonded tendons. An empirical formula is proposed to predict the deflections of beams with unbonded tendons, which yields very close predictions to the experimental results.
Source: openaire · Quality: candidate unverified · Source record ↗
Research context
OpenAlex topics: Structural Behavior of Reinforced Concrete · Concrete Corrosion and Durability · Structural Engineering and Vibration Analysis
SciVX discovery tags are terminology-based. OpenAlex topics are source-provided classifications.
References (47)
Show source-provided references
1. Enhancing strength and ductility of post-tensioned segmental box girder bridges
2. Collapse of YNS-Y-GWAS bridge, Glamorgan
3. Tendon corrosion in precast segmental bridges10.3141/1654-15 ↗
4. Concrete Society Technical Report · 2002
5. Flexural behavior of precast concrete segmental beams with hybrid tendons and dry joints10.1016/j.conbuildmat.2016.02.003 ↗
6. Behaviors of segmental concrete box beams with internal tendons and external tendons under bending10.1016/j.engstruct.2012.09.005 ↗
7. Combined shear and bending behavior of joints in precast concrete segmental beams with external tendons10.1061/(ASCE)BE.1943-5592.0000453 ↗
8. MacGregor · 1989
9. Testing of externally prestressed concrete beams10.1016/S0141-0296(01)00062-1 ↗
10. Experimental study of precast segmental bridge box girders with external unbonded and internal bonded posttensioning under monotonic vertical loading10.1061/(ASCE)BE.1943-5592.0000663 ↗
11. Shear behavior of dry joints with castellated keys in precast concrete segmental bridges10.1061/(ASCE)BE.1943-5592.0000649 ↗
12. Finite-element analysis of shear-off failure of keyed dry joints in precast concrete segmental bridges10.1061/(ASCE)BE.1943-5592.0000669 ↗
13. Performance evaluation of dry and epoxy jointed segmental prestressed box girders under monotonic and cyclic loading10.1016/j.conbuildmat.2012.09.068 ↗
14. Calibration of flexural resistance factors for load and resistance factor design of concrete bridge girders prestressed with carbon fiber-reinforced polymers10.1061/(ASCE)CC.1943-5614.0000613 ↗
15. Flexural behavior of concrete beams internally prestressed with unbonded carbon-fiber-reinforced polymer tendons10.1061/(ASCE)CC.1943-5614.0000306 ↗
16. Development of flexural capacity of a FRP prestressed beam with vertically distributed tendons10.1016/S1359-8368(01)00053-1 ↗
17. ACI 440.4R · 2004
18. A comparative study of continuous beams prestressed with bonded FRP and steel tendons10.1016/j.compstruct.2015.01.009 ↗
19. Strengthening of RC continuous beams by external prestressing10.1061/(ASCE)0733-9445(2007)133:2(195) ↗
20. A numerical survey on the behaviour of beams pre-stressed with FRP cables10.1016/S0950-0618(97)00081-0 ↗
21. Response of continuous concrete beams internally prestressed with unbonded FRP and steel tendons10.1016/j.compstruct.2016.07.028 ↗
22. Behavior of prestressed concrete beams using FRP as external cable
23. Behavior of externally draped CFRP tendons in prestressed concrete bridges10.15554/pcij.09011998.88.101 ↗
24. Effectiveness of basalt FRP tendons for strengthening of RC beams through the external prestressing technique10.1016/j.engstruct.2015.06.052 ↗
25. Quayle · 2005
26. AASHTO. Guide Specifications for Design and Construction of Segmental Concrete Bridges, 2nd Ed with 2003 Interim Revis. Washington, DC: American Association of State Highway and Transportation Officials; 1999.
27. Shear strength of joints in precast concrete segmental bridges
28. ACI 318-14. Building code requirements for structural concrete and commentary: American Concrete Institute. International Organization for Standardization; 2015.
29. Dextra Group. CFRP tendons. https://wwwdextragroupcom/offices/dextra-building-products-limited.
30. Sika Australia. Sikadur-30. https://aussikacom/.
31. Sika Australia. SikaGrout-300PT. https://aussikacom/.
32. Evaluation of ductility of structures and structural assemblages from laboratory testing
33. Flexural behaviour of precast segmental concrete beams internally prestressed with unbonded CFRP tendons under four-point loading10.1016/j.engstruct.2018.04.068 ↗
34. Behaviour of precast segmental concrete beams prestressed with CFRP tendons
35. Ultimate stress of unbonded tendons in partially prestressed concrete beams10.15554/pcij.11011985.72.91 ↗
36. Comparative study of prestressed concrete beams, with and without bond
37. Stress at ultimate in unbonded prestressing tendons: Part 2—Proposed Methodology
38. AASHTO LRFD. Bridge Construction Specifications, 6th Edition, U.S. Units. Washington, DC: American Association of State Highway and Transportation Officials; 2012.
39. On the stress in unbonded tendons at ultimate: critical assessment and proposed changes
40. Proposed methodology for computing of unbonded tendon stress at flexural failure
41. Stresses in external tendons at ultimate
42. Effects of ordinary tension reinforcement on the response of beams with unbonded tendons10.1260/136943307780150841 ↗
43. Stresses in external and internal unbonded tendons: unified methodology and design equations10.1061/(ASCE)ST.1943-541X.0000202 ↗
44. Ultimate flexural strength of concrete members prestressed with unbonded tendons
45. PCI. Design Handbook. Precast/Prestressed Concrete Institute (6th ed.), Chicago, IL; 2004.
46. Branson · 1977
47. Naaman AE. Prestressed Concrete Analysis and Design. Fundamentals, USA 2004:1-1072.