Suggestion of Maintenance Criteria for Electric Railroad Facilities Based on Fuzzy TOPSIS
Source abstract
Abstract
This paper is on the suggestion of maintenance items for electric railway facility systems. With the recent increase in the use of electric locomotives, the utilization and importance of railroad electrical facility systems are also increasing, but the railroad electrical facility system in Korea is rapidly aging. To solve this problem, various methodologies are applied to ensure operational reliability and stability for railroad electrical facility systems, but there is a lack of detailed evaluation criteria for railroad electrical facility system maintenance. Also, maintenance items must be selected in a scientific and systematic method. Therefore, railroad electrical facility systems are selected for study. Design Structure Matrix (DSM) is utilized to establish considerations tailored to the maintenance characteristics, and the Fuzzy-TOPSIS methodology is utilized for determining the maintenance detail evaluation item baseline weights, a multi-criteria decision-making problem. Studies show that degradation, insulation items have the highest weight of 14.63%, and capacity items have the lowest weight of 5.34%. The results of this may be contributed to the underlying research in carrying out maintenance activities to ensure the reliability and safety of railroad electrical facility systems.
Source: openalex_inverted_index · Quality: baseline
Research context
OpenAlex topics: Advanced Decision-Making Techniques · Evaluation Methods in Various Fields · Multi-Criteria Decision Making
SciVX discovery tags are terminology-based. OpenAlex topics are source-provided classifications.
References (17)
Show source-provided references
1. Basic plan for maintenance management of railway facilities
2. Maintenance optimization of the railway power facility
3. Analysis of railway infrastructure maintenance system
4. A comparative study on the railway electricity maintenance management
5. The study on the efficiency of conventional railway infrastructure maintenance on current status
6. Analysis of the status of the railway facility maintenance and its implications
7. Performance evaluation analysis program for electric railway facilities10.7782/JKSR.2020.23.6.542 ↗
8. Preliminary study on the simulation for urban railway facility performance assessment
9. On an approach to developing the operational architecture for a railway safety information system
10. Technical review on the QRA of railway safety facilities
11. Extension of the TOPSIS for group decision-making under fuzzy environment10.1016/S0165-0114(97)00377-1 ↗
12. Kumar · Materials & Continua · 2021 · 68 · 351310.32604/cmc.2021.016957 ↗
13. Usability evaluation through fuzzy AHP-tOPSIS approach: Security requirement perspective10.32604/cmc.2021.016610 ↗
14. Colouring of COVID-19 affected region based on fuzzy directed graphs10.32604/cmc.2021.015590 ↗
15. Fuzzy logic-based health monitoring system for COVID’19 patients10.32604/cmc.2021.015352 ↗
16. Role of fuzzy approach towards fault detection for distributed components10.32604/cmc.2021.014830 ↗
17. Design Structure Matrix Conference, “Design structure matrix (DSM),” Germany, 2021. [Online]. Available: https://dsmweb.org/design-structure-matrix-dsm/.