Scheduling Multi-Mode Resource-Constrained Projects Using Heuristic Rules Under Uncertainty Environment
Source abstract
Abstract
Project scheduling is a key objective of many models and is the proposed method for project planning and management. Project scheduling problems depend on precedence relationships and resource constraints, in addition to some other limitations for achieving a subset of goals. Project scheduling problems are dependent on many limitations, including limitations of precedence relationships, resource constraints, and some other limitations for achieving a subset of goals. Deterministic project scheduling models consider all information about the scheduling problem such as activity durations and precedence relationships information resources available and required, which are known and stable during the implementation process. The concept of deterministic project scheduling conflicts with real situations, in which in many cases, some data on the activity' s durations of the project and the degree of availability of resources change or may have different modes and strategies during the process of project implementation for dealing with multi-mode conditions surrounded by projects and their activity durations. Scheduling the multi-mode resource-constrained project problem is an optimization problem whose minimum project duration subject to the availability of resources is of particular interest to us. We use the multi-mode resource allocation and scheduling model that takes into account the dynamicity features of all parameters, that is, the scheduling process must be flexible to dynamic environment features. In this paper, we propose five priority heuristic rules for scheduling multi-mode resource-constrained projects under dynamicity features for more realistic situations, in which we apply the proposed heuristic rules (PHR) for scheduling multi-mode resource-constrained projects. Five projects are considered test problems for the PHR. The obtained results rendered by these priority rules for the test problems are compared by the results obtained from 10 well-known heuristics rules rendered for the same test problems. The results in many cases of the proposed priority rules are very promising, where they achieve better scheduling dates in many test case problems and the same results for the others. The proposed model is based on the dynamic features for project topography.
Source: openalex_inverted_index · Quality: baseline
Research context
OpenAlex topics: Resource-Constrained Project Scheduling · Scheduling and Optimization Algorithms · BIM and Construction Integration
SciVX discovery tags are terminology-based. OpenAlex topics are source-provided classifications.
References (23)
Show source-provided references
1. A priority rule-based heuristic for resource investment project scheduling problem with discounted cash flows and tardiness penalties10.1155/2009/106425 ↗
2. Composite heuristic priority rules-based on tie-breakers for scheduling multiple-constrained resource projects
3. Optimizing regular scheduling objectives: Schedule generation schemes
4. Some heuristic rules for scheduling single and multiple resources constrained projects
5. New heuristics for scheduling single constrained resource projects
6. Experimental investigation of heuristics for resource-constrained project scheduling: An update10.1016/j.ejor.2005.01.065 ↗
7. Multi-mode resource-constrained project scheduling: Scheduling schemes, priority rules and mode selection rules inteligencia artificial
8. Novel heuristic solutions for multi-skill resource-constrained project scheduling problem
9. Multi-mode resource-constrained project-scheduling problem with renewable resources: New solution approaches
10. Using an enhanced ant colony system to solve resource-constrained project scheduling problem
11. Best-order crossover in an evolutionary approach to multi-mode resource-constrained project scheduling
12. Priority rule-based heuristic for multi-mode resource-constrained project scheduling problems with resource vacations and activity splitting10.1016/j.ejor.2006.02.010 ↗
13. Resource-constrained multi-project scheduling: Priority rule performance revisited10.1016/j.ijpe.2010.03.009 ↗
14. Dynamic priority rule-based forward-backward heuristic algorithm for resource levelling problem in construction project10.1057/jors.2013.33 ↗
15. Resource-constrained multi-project scheduling with priority rules & analytic hierarchy process10.1016/j.proeng.2014.03.048 ↗
16. Project scheduling: Survey and research potentials10.7753/IJCATR0404.1005 ↗
17. Quality-and profit-oriented scheduling of resource-constrained projects with flexible project structure via a genetic algorithm10.1504/EJIE.2016.078807 ↗
18. An adaptive crossover genetic algorithm with simulated annealing for multi mode resource constrained project scheduling with discounted cash flows10.1504/IJOR.2016.073250 ↗
19. Multi-objective model for solving resource levelling problem with discounted cash flows10.1111/itor.12253 ↗
20. An effective mirror-based genetic algorithm for scheduling multi-mode resource constrained projects10.1016/j.cie.2018.11.031 ↗
21. Breast cancer and liver disorders classification using artificial immune recognition system (AIRS) with performance evaluation by fuzzy resource allocation mechanism10.1016/j.eswa.2005.11.024 ↗
22. A new fuzzy multi-objective multi-mode resource-constrained project scheduling model10.1504/IJMOR.2017.085379 ↗
23. A hybrid genetic algorithm and fuzzy set applied to multi-mode resource-constrained project scheduling problem10.3233/IFS-120747 ↗