Research on Optimization of Dual-Resource Batch Scheduling in Flexible Job Shop
Source abstract
Abstract
With the rapid development of intelligent manufacturing and the changes in market demand, the current manufacturing industry presents the characteristics of multi-varieties, small batches, customization, and a short production cycle, with the whole production process having certain flexibility. In this paper, a mathematical model is established with the minimum production cycle as the optimization objective for the dual-resource batch scheduling of the flexible job shop, and an improved nested optimization algorithm is designed to solve the problem. The outer layer batch optimization problem is solved by the improved simulated annealing algorithm. The inner double resource scheduling problem is solved by the improved adaptive genetic algorithm, the double coding scheme, and the decoding scheme of Automated Guided Vehicle (AGV) scheduling based on the scheduling rules. The time consumption of collision-free paths is solved with the path planning algorithm which uses the Dijkstra algorithm based on a time window. Finally, the effectiveness of the algorithm is verified by actual cases, and the influence of AGV with different configurations on workshop production efficiency is analyzed.
Source: openalex_inverted_index · Quality: baseline
Research context
OpenAlex topics: Scheduling and Optimization Algorithms · Advanced Manufacturing and Logistics Optimization · Assembly Line Balancing Optimization
SciVX discovery tags are terminology-based. OpenAlex topics are source-provided classifications.
References (19)
Show source-provided references
1. Current trends in the development of intelligent unmanned autonomous systems10.1631/FITEE.1601650 ↗
2. Integrated scheduling of machines and AGVs in flexible manufacturing environment
3. Integrated scheduling of multiple AGVs and machines in flexible job shops
4. Research on flexible job-shop scheduling problem with AGV constraints
5. Flexible job shop AGV fusion scheduling method based on HGWOA
6. Research on flexible job shop scheduling optimization based on segmented AGV10.32604/cmes.2022.021433 ↗
7. Research on integrated scheduling of AGV and machine in flexible job shop
8. Flexible job-shop scheduling with dual-resource constraints to minimize tardiness using genetic algorithm10.1088/1757-899X/114/1/012060 ↗
9. Modified water wave optimization for energy-conscious dual-resource constrained flexible job shop scheduling10.23940/ijpe.20.06.p10.916929 ↗
10. Dual resource constrained flexible job shop scheduling based on improved quantum genetic algorithm10.3390/machines9060108 ↗
11. Batch division and parallel scheduling optimization of flexible job shop
12. Robust multi-objective flexible job shop scheduling with batch startup time
13. Flexible job shop scheduling with lot streaming based on improved migrating birds optimization algorithm
14. Multi-objective flexible job shop scheduling considering lot-splitting
15. Flexible job shop scheduling with lot streaming and sublot size optimization10.1080/00207543.2017.1346322 ↗
16. An effective ant colony optimization algorithm for multi-objective job-shop scheduling with equal-size lot-splitting10.1016/j.asoc.2017.04.062 ↗
17. An improved multi-objective optimization algorithm for solving flexible job shop scheduling problem with variable batches10.23919/JSEE.2021.000024 ↗
18. Multi-objective energy-aware batch scheduling using ant colony optimization algorithm10.1016/j.cie.2019.03.033 ↗
19. Multi-objective scheduling method for batch production FJSP with dual-resource