journal article·2022Open access

Flow-Shop Scheduling with Transportation Capacity and Time Consideration

Chia-Nan Wang, Glen Andrew Porter, Ching-Chien Huang, Viet Tinh Nguyen, Syed Tam Husain

Computers, Materials & Continua· Volume 70· Issue 2

Abstract

Planning and scheduling is one of the most important activity in supply chain operation management. Over the years, there have been multiple researches regarding planning and scheduling which are applied to improve a variety of supply chains. This includes two commonly used methods which are mathematical programming models and heuristics algorithms. Flowshop manufacturing systems are seen normally in industrial environments but few have considered certain constraints such as transportation capacity and transportation time within their supply chain. A two-stage flowshop of a single processing machine and a batch processing machine are considered with their capacity and transportation time between two machines. The objectives of this research are to build a suitable mathematical model capable of minimizing the maximum completion time, to propose a heuristic optimization algorithm to solve the problem, and to develop an applicable program of the heuristics algorithm. A Mixed Integer Programming (MIP) model and a heuristics optimization algorithm was developed and tested using a randomly generated data set for feasibility. The overall results and performance of each approach was compared between the two methods that would assist the decision maker in choosing a suitable solution for their manufacturing line.
Source: openalex_inverted_index · Quality: baseline

Research context

OpenAlex topics: Scheduling and Optimization Algorithms · Advanced Manufacturing and Logistics Optimization · Optimization and Packing Problems

SciVX discovery tags are terminology-based. OpenAlex topics are source-provided classifications.

References (25)

Show source-provided references
1. Discussion: Sequencing n jobs on Two machines with arbitrary time lags10.1287/mnsc.5.3.299 ↗
2. Scheduling groups of jobs on a single machine10.1287/opre.43.4.692 ↗
3. Scheduling with batching: A review10.1016/S0377-2217(99)00153-8 ↗
4. Efficient scheduling algorithms for a single batch processing machine10.1016/0167-6377(86)90104-5 ↗
5. Batching and scheduling jobs on batch and discrete processors10.1287/opre.40.4.750 ↗
6. Minimizing makespan in a two-machine flowshop with dynamic arrivals allowed10.1016/S0305-0548(00)00071-X ↗
7. Mixed integer formulation to minimize makespan in a flowshop with batch processing machines10.1016/j.mcm.2005.01.005 ↗
8. Minimizing makespan on a single batch processing machine with dynamic job arrivals10.1080/002075499192020 ↗
9. Minimizing total completion time on batch processing machines10.1080/00207549308956847 ↗
10. Minimizing makespan on a single burn-in oven in semiconductor manufacturing10.1016/S0377-2217(98)00391-9 ↗
11. Scheduling a single batch processing machine with non-identical job sizes10.1080/00207549408957026 ↗
12. Batching and scheduling to minimize the makespan in the two-machine flowshop10.1080/07408179808966485 ↗
13. Makespan minimization in the two-machine flowshop batch scheduling problem10.1002/(SICI)1520-6750(200003)47:2<128::AID-NAV4>3.0.CO;2-# ↗
14. Machine scheduling with transportation considerations10.1002/1099-1425(200101/02)4:1<3::AID-JOS57>3.0.CO;2-D ↗
15. On 2*n sequencing problem with transportation times of jobs
16. On an automated two-machine flowshop scheduling problem with infinite buffer10.15807/jorsj.34.354 ↗
17. Scheduling parts in a combined production-transportation work cell10.1057/jors.1990.86 ↗
18. Design and operational issues in AGV-served manufacturing systems10.1023/A:1018936219150 ↗
19. Interstage transportation planning in the deterministic flow-shop environment10.1287/opre.35.4.556 ↗
20. Two-machine flowshop scheduling problems involving a batching machine with transportation or deterioration consideration10.1016/j.apm.2008.01.013 ↗
21. Realistic two-stage flowshop batch scheduling problems with transportation capacity and times10.1016/j.apm.2011.07.011 ↗
22. Multi-objective optimization of the distributed permutation flow shop scheduling problem with transportation and eligibility constraints10.1007/s40305-017-0165-3 ↗
23. A genetic algorithm for a flow shop scheduling problem with breakdown interval, transportation time and weights of jobs10.1504/IJOR.2019.101456 ↗
24. Combining mixed integer programming and constraint programming to solve the integrated scheduling problem of container handling operations of a single vessel10.1016/j.ejor.2020.02.021 ↗
25. A simulation–optimization model for solving flexible flow shop scheduling problems with rework and transportation10.1016/j.matcom.2020.08.019 ↗