Dynamical Artificial Bee Colony for Energy-Efficient Unrelated Parallel Machine Scheduling with Additional Resources and Maintenance

Yizhuo Zhu, Shaosi He, Deming Lei

Computers, Materials & Continua· Volume 81· Issue 1

Abstract

Unrelated parallel machine scheduling problem (UPMSP) is a typical scheduling one and UPMSP with various real-life constraints such as additional resources has been widely studied; however, UPMSP with additional resources, ma... | Find, read and cite all the research you need on Tech Science Press
Source: openalex_inverted_index · Quality: baseline

Research context

OpenAlex topics: Scheduling and Optimization Algorithms · Advanced Manufacturing and Logistics Optimization · Metaheuristic Optimization Algorithms Research

SciVX discovery tags are terminology-based. OpenAlex topics are source-provided classifications.

References (49)

Show source-provided references
1. A state-of-the-art review of parallel-machine scheduling research10.1016/0377-2217(90)90215-W ↗
2. Parallel machine scheduling problems: A survey
3. Solving a bi-objective unrelated parallel batch processing machines scheduling problem: A comparison study10.1016/j.cor.2017.06.019 ↗
4. A novel collaborative evolutionary algorithm with two-population for multi-objective flexible job shop scheduling
5. Scheduling an energy-aware parallel machine system with deteriorating and learning effects considering multiple optimization objectives and stochastic processing time
6. Parallel machine scheduling with earliness-tardiness penalties and additional resource constraints10.1016/S0305-0548(02)00118-1 ↗
7. A two-stage adaptive fruit fly optimization algorithm for unrelated parallel machine scheduling problem with additional resource constraints10.1016/j.eswa.2016.08.039 ↗
8. Models and matheuristics for the unrelated parallel machine scheduling problem with additional resources10.1016/j.ejor.2017.01.002 ↗
9. Algorithms for the unrelated parallel machine scheduling problem with a resource constraint10.1016/j.ejor.2018.05.056 ↗
10. A collaborative multiobjective fruit fly optimization algorithm for the resource constrained unrelated parallel machine green scheduling problem10.1109/TSMC.2016.2616347 ↗
11. Heuristic algorithms for the unrelated parallel machine scheduling problem with one scarce additional resource10.1016/j.eswa.2017.09.054 ↗
12. Design of an efficient genetic algorithm for resource-constrained unrelated parallel machine scheduling with machine eligibility restrictions10.1007/s10845-015-1117-6 ↗
13. Enriched metaheuristics for the resource unrelated parallel machine scheduling problem10.1016/j.cor.2019.07.016 ↗
14. Optimize unrelated parallel machine scheduling problems with multiple limited additional resources, sequence-dependent setup times and release date constraints10.1109/ACCESS.2019.2955975 ↗
15. Models and an exact method for the unrelated parallel machine scheduling problem with setups and resources
16. GRASP algorithm for the unrelated parallel machines scheduling problem with additional resources during processing and setups10.1080/00207543.2022.2121869 ↗
17. Constraint programming approach for multiresource-constrained unrelated parallel machine scheduling problem with sequence-dependent setup times10.1080/00207543.2021.1885068 ↗
18. Unrelated parallel machine scheduling with aging effects and multi-maintenance activities10.1016/j.cor.2011.08.017 ↗
19. Multi-objective optimization of parallel machine scheduling integrated with multi-resources preventive maintenance planning10.1016/j.jmsy.2015.07.002 ↗
20. Parallel-machine scheduling with maintenance: Praising the assignment problem10.1016/j.ejor.2015.12.047 ↗
21. Including preventive maintenance activities in an unrelated parallel machine environment with dependent setup times10.1016/j.cie.2018.07.006 ↗
22. A novel imperialist competitive algorithm with multi-elite individuals guidance for multi-object unrelated parallel machine scheduling problem10.1109/ACCESS.2019.2937747 ↗
23. A novel shuffled frog-leaping algorithm for unrelated parallel machine scheduling with deteriorating maintenance and setup time10.3390/sym13091574 ↗
24. Feature-extraction-based iterated algorithm to solve the unrelated parallel machine problem with periodic maintenance activities10.1109/ACCESS.2021.3118986 ↗
25. An artificial bee colony with division for distributed unrelated parallel machine scheduling with preventive maintenance10.1016/j.cie.2020.106320 ↗
26. An adaptive artificial bee colony for unrelated parallel machine scheduling with additional resource and maintenance10.1016/j.eswa.2022.117577 ↗
27. Energy-conscious unrelated parallel machine scheduling under time-of-use electricity tariffs10.1016/j.jclepro.2017.04.018 ↗
28. Bi-criteria formulation for green scheduling with unrelated parallel machines with sequence-dependent setup times10.1111/itor.12566 ↗
29. Energy cost minimization for unrelated parallel machine scheduling under real time and demand charge pricing10.1016/j.jclepro.2018.10.048 ↗
30. A new unrelated parallel machine scheduling problem with tool changes to minimise the total energy consumption10.1080/00207543.2019.1685708 ↗
31. A novel multi-objective scheduling method for energy based unrelated parallel machines with auxiliary resource constraints10.1109/ACCESS.2019.2954601 ↗
32. Energy-efficient scheduling in an unrelated parallel-machine environment under time-of-use electricity tariffs10.1016/j.jclepro.2019.119393 ↗
33. An approximation algorithm for unrelated parallel machine scheduling under TOU electricity tariffs10.1109/TASE.2020.2995078 ↗
34. A combinatorial evolutionary algorithm for unrelated parallel machine scheduling problem with sequence and machine-dependent setup times, limited worker resources and learning effect10.1016/j.eswa.2021.114843 ↗
35. Pareto-based discrete artificial bee colony algorithm for multi-objective flexible job shop scheduling problem10.1007/s00170-010-3140-2 ↗
36. Unrelated parallel machine scheduling with sequence and machine-dependent setup times and due date constraints
37. ABC-based manufacturing scheduling for unrelated parallel machines with machine-dependent and job sequence-dependent setup times10.1016/j.cor.2014.05.013 ↗
38. An artificial bee colony algorithm approach for unrelated parallel machine scheduling with processing set restrictions, job sequence-dependent setup times, and due date10.1007/s00170-014-6614-9 ↗
39. A hybrid ABC-TS algorithm for the unrelated parallel-batching machines scheduling problem with deteriorating jobs and maintenance activity10.1016/j.asoc.2018.02.018 ↗
40. An improved artificial bee colony for multi-objective distributed unrelated parallel machine scheduling10.1080/00207543.2020.1775911 ↗
41. A hybrid multi-objective artificial bee colony algorithm for flexible task scheduling problems in cloud computing system10.1007/s10586-019-03022-z ↗
42. A distributed heterogeneous permutation flowshop scheduling problem with lot-streaming and carryover sequence-dependent setup time10.1016/j.swevo.2020.100804 ↗
43. A novel hybrid multi-objective artificial bee colony algorithm for blocking lot-streaming flow shop scheduling problems10.1016/j.knosys.2018.02.029 ↗
44. An adaptive artificial bee colony with reinforcement learning for distributed three-stage assembly scheduling with maintenance10.1016/j.asoc.2021.108371 ↗
45. A feedback-based artificial bee colony algorithm for energy-efficient flexible flow shop scheduling problem with batch processing machines10.1016/j.asoc.2024.111254 ↗
46. A fast and elitist multiobjective genetic algorithm: NSGA-II10.1109/4235.996017 ↗
47. Multi-objective evolutionary algorithms: A comparative case study and the strength Pareto approach10.1109/4235.797969 ↗
48. Pareto archive particle swarm optimization for multi-objective fuzzy job shop scheduling problems10.1007/s00170-007-0945-8 ↗
49. On metrics for comparing nondominated sets